Resolution 05-024 Amending Fee Resolution .
CITY OF SPOKANE VALLEY
SPOKANE COUNTY, WASHINGTON
RESOLUTION NO. 05-024
A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY,
WASHINGTON, AMENDING RESOLUTION 0.5-023, AND APPROVING AN
•
AMENDED MASTER FEE SCHEDULE
WHEREAS, this resolution is necessary to amend the effective date contained in Resolution 05-
023 to implement necessary fee changes effective January I, 2006; and
WHEREAS, it is the general policy of the City to establish fees that are reflective of the cost of
services provided by the City; and
WHEREAS, the City uses a resolution to establish fees for City programs, permits and services,
and periodically, the fee resolution must be updated to incorporate new or modified services; and
WHEREAS, Council desires to modify the Resolution and accompanying Fee Schedule.
NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane
County, Washington,as follows:
Section 1. The changes needed at this time are incorporated into the attached schedules, and include(I)
addition of a separate transcript/record deposit fee on appeals of the Hearing Examiner's decisions as
established in Ordinance 05-021; (2) addition of a $250 paving permit fee; (3) Plan Review Fees to be
paid at the time of permit issuance; (4)the approach permit fee and the right of way obstruction fee were
moved from another section of the resolution; (5) the deletion of a $10 fee for a copy of an annual
budget; (6) adjusting the annual Storm water fee to $20/equivalent residential unit based on the six-year
plan; (7) incorporating some public works fees into existing permit fees (no increase in the amount
owed by users); (8) the addition of an oversized load permit fee of$25; (9) changes to fire district fees;
and (10)the addition of a blasting permit fee of$60.00.
Section 2. Repeal. To the extent that previous fee schedules are inconsistent with those set
forth herein, they are repealed.
Section 3. Effective Date. This Resolution shall be in full force and effect January 1, 2006.
Approved this 15`h day of November, 2005
ATTEST: CITY OF SPOKANE VALLEY
/ r .- DCjQJ .wahthz,
at
-%i1 ine ainbridge, fty Clerk Diana Wilhite, Mayor
•
Approved as to form: -J
Office o ray ttorndy
AMENDED MASTER FEE SCHEDULE
Fee Schedule Page No.
Schedule A: Development 3
Schedule B: Building 5
Schedule C: Fire Code 13
Schedule D: Parks & Recreation 16
Schedule E: Administrative 19
Schedule F: Other Fees 20
Fee Resolution 05-024 Page 2 of 20
MASTER FEE SCHEDULE
Schedule A— DEVELOPMENT
AMENDMENTS
Comprehensive Plan amendment $1,500.00
Zoning Or other code text amendment $1,500.00
APPEALS
•
Appeal of Administrative Decision $1,000.00
Appeal of Hearing Examiner findings $300.00
Transcript/record deposit fee on appeals of Hearing $150.00
Examiner's decisions
ENVIRONMENTAL REVIEW
State Environmental Policy Act(SEPA)
Single dwelling(when required) $100.00
All other developments $350.00
Environmental Impact Statement(EIS)Review $2,200.00
Addenda of existing EIS Review $350.00
•
Shoreline
Substantial Development Permit $800.00
Critical Areas $300.00
Floodplain Permit $50.00 Per lot
PERMITS
Home Occupation Permit $80.00
Conditional Use Permit $800.00
Temporary Use Permit $150.00
PLATS
Subdivisions
Preliminary plat $2,150.00 Plus $40.00 per lot
Final plat $1,250.00 Plus $10.00 per lot
Short Plats
Preliminary 2-4 lots $750.00
Final Plat 2-4 Lots $1,050.00 Plus $10.00 per lot
Preliminary plat 5-9 Lots $1,250.00 Plus$25.00 per lot
Final Plat 5-9 Lots $1,050.00 Plus$10.00 per lot
Fee Resolution 05-024 Page 3 of 20
Plat Alteration
Subdivision plat $650.00
Short plat $265.00
Binding Site Plan $1,500.00
Binding site plan modification $1,300.00
Change of Conditions $650.00
Aggregation/Segregation
Lot line adjustment $100.00
Lot line elimination $1 00.00
Zero lot line $100.00 Plus$10.00 per lot
SIGNS
Review of permanent sign $50.00 Plus $25.00 if Public
Works review is
needed
Review of temporary sign $50.00
SITE PLAN REVIEW $550.00
STREET VACATION APPLICATION $1,300.00
VARIANCES
Administrative $300.00
Public Hearings $1,500.00
ZONING
Zoning map amendments(rezone)* $1,650.00
PUD plan $1,500.00 Plus $25.00 per lot
Nfl) modification $500.00
*If rezone is combined with other action(s),cost of other
action(s) is additional.
Note: The Building Official is authorized to require the permit applicant to provide fee
reimbursement to the City of Spokane Valley for any professional services required outside of
City staff review. Some examples of potential outside resources include plan review,
construction inspection and surveying.
Fee Resolution 05-024 Paee 4 of 20
Schedule B — BUILDING
The building code permit fees are collected at the time of the issuance of the building permit.
Other fees are also to be collected at the time of the issuing of the building permit. Each
department for whom the fee is collected is to advise the permit specialist of fees due.
GRADiNG
Permit Fees
Cubic Yards FEE
100 or less $20.00
101 to 1,000 $20.00 for the first 100 Cu. Yd., plus $7.00 for each
additional 100 Cu. Yd.
1,001 to 10,000 $83.00 for the first 1,001 Cu. Yd., plus $6.00 for each
additional 1,000 Cu. Yd.
10,001 to 100,000 $147.00 for the first 10,000 Cu. Yd. plus $15.00 for
each additional 10,000 Cu. Yd.
100,001 to 200,000 $368.00 for the first 100,000 Cu. Yd. plus $15.00 for
each additional 100,000 Cu. Yd.
200,000 or more . $503.00 for the first 200,000 Cu. Yd. plus $15.00 for
each additional 200,000 Cu. Yd.
Blasting Permit Fee (Life Safety) $60
Plans Checking Fees
Cubic Yards FEE
50 or less No fee
51 to 100 $12.00
101 to 1,000 $20.00
1,001 to 10,000 $25.00
10,001 to 100,000 $25.00 for the first 10,000 Cu. Yd. plus $7.00 for
each additional 10,000 Cu. Yd.
100,001 to 200,000 $98.00 for the first 100,000 Cu. Yd. plus $6.00 for
each additional 100,000 Cu. Yd.
200,001 or more $158.00
Land Clearing only(without earth being moved) $65.00
Paving Permit(greater than 5,000 SF—new paving only) $250.00
Fee Resolution 05-024 Page 5 of 20
•
STRUCTURAL CODE
Building permit fees for each project are set by the following fee schedule. The table below is to
be used to determine the building permit fees and plans check fees based on the value of the
construction work as stated by the applicant or the value calculated by the Building Official
using the latest valuation data published in the Building Safety Journal by the International Code
Council, whichever value is greatest.
Valuation Table
Total Valuation Fee
$1 to $25,000 $69.25 for the first$2,000 plus $14 for each additional
$1,000, or fraction thereof, up to and including$25,000
$25,001 to $50,000 $391.25 for the first$25,000 plus $10.10 for each
additional $1,000, or fraction thereof, up to and
including $50,000
$50,001 to $100,000 $643.75 for the first $50,000 plus $7 for each
additional $1,000, or fraction thereof, up to and
including $100,000
$100,001 to $500,000 $993.75 for the first $100,000 plus $5.60 for each
additional $1,000, or fraction thereof,.up to and
including $500,000
$500,001 to $1,000,000 $3,233.75 for the first $500,000 plus $4.75 for each
additional $1,000, or fraction thereof, up to and
including$1,000,000
$1,000,000 and up $5,608.75 for the f rst$1,000,000 plus $3.15 for each
additional $1,000, or fraction thereof
Valuation Exceptions Fee Per
Square Foot
Private garages (wood frame) $19.00
Private garages (masonry) $22.00
Pole buildings $19.00
Open carport, decks, porches $15.00
Plans Review Fees
Plan Review Fees shall be collected at the time of permit issuance along with the «'SBC fee.
For other than signs, one and two family residential structures and the associated accessory
buildings or structures, a Plans Review Fee Deposit of $200 shall be collected at the time of
acceptance of the Building Permit Application. The application shall be accepted only when the
application is determined to be complete by City staff.
•
•
Fee Resolution 05-024 Page 6 of 20
For signs, one and two family residential structures and the associated accessory buildings or
structures, no plan review deposit will be required at the time of Building Permit Application
submittal.
The balance of the Plan Review Fee shall be collected at the time of Building Permit issuance
along with the WSBCC Fee. Any excess deposit collected during the application process shall
be applied to the Building Permit Fee.
Plans Review Fees are not refundable once the plan review has been started. Plans Review Fees
are additional to Building Permit Fees.
Plans review fee(general) 65% Of bldg permit fee
Plans review fee—Group R-3 occupancies (single family 40% Of bldg permit fee
less than 7,999 sq. ft.)
Plans review fee—Group R-3 occupancies(single family 65% Of bldg permit fee
8,000 sq. ft. or greater)
Plans review fee—U-I or U-2 occupancies (sheds, barns, 25% Of bldg permit fee
etc.)
Plans review fee—temporary tent or structure 25% Of bldg permit fee
Initial Plan Review Fees shall be capped at$35,000 maximum with the following exception:
Exception#1:
If additional professional resources are required for individual project plan review for those
projects that reach the maximum Plan Review Fee, the Building Official shall be authorized to
require the permit applicant to provide those resources to the City of Spokane Valley.
If a set of plans already checked and approved is resubmitted by the owner or his/her agent, an
hourly rate of$47.00 will be applied for the re-review.
PLUMBING CODE
The plumbing code fees will be collected when the associated permit is issued. If the plumbing is
included in the Building Permit the unit costs are added, but not the basic plumbing permit fee.
A. Basic fees
1) Basic fee for issuing each permit $35.00
2) Basic for each supplemental permit $7.50
B. Unit fees(in addition to the basic fee)
1) For each plumbing fixture on a trap(including $6.00
garbage disposals, dish washers, back flow device, •
drainage, hot tubs, built in water softener,water
closets, lavatories, sinks, drains, etc)
2) Private sewage disposal system $20.00
3) Water heater $6.00 Each
4) Industrial waste pretreatment interceptor including $15.00
Fee Resolution 05-024 Page 7 of 20
•
its trap and vent, except kitchen type grease
interceptors functioning as fixture traps.
5) Repair or alteration of water piping, drainage or $6.00 Each fixture
vent piping
6) Lawn sprinkler system on any one meter $25.00
7) Atmospheric type vacuum breaker $6.00 Each
8) Backflow protective device other than atmospheric $6.00 Each
type vacuum breakers
9) Medical gas $6.00 Per outlet
10) Interceptors $6.00 Each
Fee Resolution 05-024 Page 8 of 20
MECHANICAL, CODE
• The mechanical code fees will be collected when the associated permit is issued. if it is included
in the Building Permit, the unit costs are added, but not the basic mechanical permit fee.
A. Basic fees
I) Basic fee for issuing each permit $35.00
2) Basic for each supplemental permit $7.50
13. Unit fees(in addition to the basic fee)
I) Furnaces &suspended heaters- Installation or
relocation
a. up to and including 100,000 btu $12.00
b. over 100,000 btu $15.00
2) Duct work system $10.00
3) Heat pump& air conditioner
a. O to 3 tons $12.00
b. over 3 to 15 tons $20.00
c. over 15 to 30 tons $25.00
d. over 30 to 50 tons $35.00
c. over 50 tons $60.00
4) Gas water heater $10.00
5) Gas piping system $1.00 Per outlet
6) Gas log, fireplace, and gas insert installation $10.00
7) Appliance vents installation; relocation; replacement $10.00 Each
8) Repairs or additions $15.00
9) Boilers, compressors, and absorption systems
a. 0 to 3 hp- 100,000 btu or less $12.00
b. Over 3 to 15 hp- 100,001 to 500,000 btu $20.00
c. Over 15 -30 hp-500,001 to 1,000,000 btu $25.00
d. over 30 hp- 1,000,001 to 1,750,000 btu • $35.00
e. over 50 hp-over 1,750,000 btu $60.00
•
10) Air Handlers
a. Each unit up to 10,000 cfm, including ducts $12.00
b. Each unit over 10,000 cfm $15.00
1 I) Evaporative Coolers (other than portable) $10.00
12) Ventilation and exhaust
• a. Each fan connected to a single duct $10.00 •
b. Each ventilation system $12.00
c. Each hood served by mechanical exhaust $12.00
13) Incinerators
a. Installation or relocation of residential $19.00
b. Installation or relocation of commercial $22.00 •
14) Appliances, each $10.00
15) Unlisted appliances
a. under 400,000 btu $50.00
b. 400,000 btu or over $100.00
Fee Resolution 05-024 Page 9 of 20
16) Hood
a. Type 1 $50.00
b. Type II $10.00
17) L P Storage tank $10.00
IS) Wood or Pellet stove insert $10.00
19) Wood stove system —free standing $25.00
ENERGY CODE
Energy Code Plans check fee is also established to check to meet the requirements of RC\V 51-
11 WAC. These are in addition to the Building Code Fees. If City inspectors are assigned to
verify Energy Plans, the following fees apply. If an outside energy inspector is required, that fee
will be determined by the outside agency.
Residential Remodel/Addition $-0-
New Single Family $ -0-
Tenant Improvement
A. 0 to 10,000 square feet $35.00
B. 10,001 square feet and over $45.00
C. Multi-Family $60.00 Per building
D. New Commercial and industrial $90.00
OTHER BUILDING CODE FEES
Annual Permit
Annual Spokane Valley Building Permits used to:
1) maintain equipment or buildings,
2) construct or remodel small areas of assembly occupancies, or
3) install tents or membrane structures
may be available depending upon the determination of the valuation of work made by the
Spokane Valley Building Official. Certain record keeping and inspection responsibilities shall
be established in a site specific Spokane Valley Annual Permit Agreement.
Approach Permit $50.00
Demolition Permit
•
Single Family Residence $44.00
Commercial buildings $125.00
Garage or accessory building associated with a residence or $20.00
commercial building
Septic tank or underground flammable tank associated with $10.00 Each
a residence or commercial•building
Early Start Agreements(Foundations) 25% Of bldg permit fee
Fee Resolution 05-024 Page 10 of 20
` l
Right-of-Way Obstruction Permit $70.00
Sign Fees
Fees collected for a sign permit and a plans check fee for signs erected in accordance with the
Sign Code. The fee below plus the WSBCC fee of$4.50.
Signs mounted on buildings $45.00
Sign and pole mounting $65.00
Temporary Certificate of Occupancy $50.00
Washington State Building Code Council (W.S.B.C.C.) Surcharge
A flat fee of$4.50 will be collected on each permit for approved plans or any other permit that is
issued in accordance with the Spokane Valley Building Code. EXCEPT: For multi-family
projects, the fee is $4.50 for the first living unit and $2.00 for each additional unit. The City
Finance Department will forward this fee to the WSBCC on a quarterly basis.
OTHER MISCELLANEOUS FEES
A. For City personnel
1) Hourly rate set for City Employees (unless $47.00
otherwise specified)
2) Hourly rate for permit specialist $42.00
3) Overtime charges 1.5 times regular rate
B. Hourly rate for contracted services Set according to
contract rate
C. Hourly rate for special called inspections $47.00
D. Mobile home location permit and inspection
1) Temporary mobile hone $60.00
2) Manufactured home inspection, per section $50.00 *
E. House Moving Fee
1) Class I, II, and III—Moving permit $60.00
2) Class I, II, and III—Inspection fee $60.00 **
3) Class IV (if already permitted by Spokane $ -0-
County or Spokane City)
* Plus hasement/crawlspace valuation permit fee
**Plus$47.00 per hour after the F'hour, and 5.50 per mile if the building to be moved into the
City is outside the City limits
•
Fee Resolution 05-024 Page 11 of 20
F. Minimum I-lousing Inspection fee $55.00 Plus$47.00 per hour
after I" hour
G. Work on any structure or building without a permit if
a Spokane Valley Permit is required:
I) Minimum investigative inspection fee $55.00
2) Total investigative fee to be equal to the permit fee determined for the value of the illegal
work accomplished
H. Special inspections (requested by owner or tenant)
1) Fire, wind, mud slide or flood damage $60.00
2) Day Care $60.00 •
3) Nursing Homes, hospitals, et al $60.00 Plus$47.00 per
hour after 1st hour
4) Special Occupancies $60.00
I. Excess inspections for a given project created by the $47.00 Per inspection or re-
developer, owner or contractor inspection
J. Condominium conversion plans review/inspection fee Based on value of
project and bldg
code valuation
K. Temporary tents, canopies, and air supported structures for public use; inclusive of all
tents for a single event. It does not apply to tents less than 200 sq. ft., canopies less than
400 sq ft, camping tents, or to tents used for private, non commercial events.
1) Plans check fee $1 3.00
2) Basic permit fee $60.00
L. Enclosing an existing deck or patio
1) Plans check fee • 40% Of the basic fee for
plans examination
2) Basic permit fee Based on value of
project; minimum
$3,000
M. Swimming pools (Over 5,000 gallons) $50.00 Plus plumbing fees
N. Re-roof Permit: Fee based on the value of the project. No plan review fee will be charged unless
plans are submitted for review.
O. Change of Use or Occupancy Classification permit $47.00
P. Towers, elevated tanks, antennas Based on value of
project
BUILDING CODE FEE REFUND POLICY
No Permit Fee refund is allowed once the work has been started. If a refund is requested, the
request shall be addressed to the Building Official in writing, and shall be received at the
Spokane Valley Permit Center within 180 days of the date of issuance of the permit. Any fee
refund request received after 180 days of the date of permit issuance shall be denied. Any refund
approved shall be limited to 80% of the total Permit Fee paid. Refunds shall be limited to
Building, Plumbing and Mechanical Permit fees paid to the City of Spokane Valley.
Fee Resolution 05-024 Page 12 of 20
Schedule C - FIRE CODE
•
FIRE ALARM,SPRINKLER AND OTHER PROTECTION SYSTEMS
Plans check and review fees, inspections, and permit for installation of separate fire alarm system
or sprinkler system applications, and other fire protection systems.
Fire Alarm System
A. Commercial—permit, plans check and inspection Based on value of
system
B. Residential
1) All zones $40.00
2) Permit fee $35.00
Sprinkler Systems
A. Tenant improvements
1) Less than 10 heads $65.00
2) 1 I or more heads $85.00
B. New systems
1) Commercial —permit, plans check and Based on value of
inspection system •
2) Residential $60.00 Each riser, plus$1.10
per plug/head
Other Protection Systems
A. Fire extinguishing system (other than sprinklers) $50.00 Plus$1.50 per nozzle
B. Standpipe installation
1) Class I and Class 11 $58.00
2) Class 111 $70.00
C. Fire pump installation $55.00
0. Flammable and combustible liquids storage tanks
• installation
1) Underground $60.00 Per tank
2) Above ground $60.00 Per tank
E. Hazardous materials storage tanks installation Per tank
1) Less than 500 gallons $75.00
2) 500 - 1,199 gallons $104.00
3) 1,200 gallons or more $147.00
Fee Resolution 05-024 Pace 13 of 20
Th
•
F. Liquefied petroleum tanks installation Per tank
1) Less than 500 gallons ¶84,00
2) 500 - 9,999 gallons 5104,00
3) 10,000 gallons or more ¶1.47.00
G. Cryogenic tank installation $60.00 Per tank
H. Removal, abandonment; or any combination thereof, •
of flammable or combustible liquid storage tanks
1) Tank (commercial) $60.00 Per lank
2) Contractor's permit for removal or $75.00
abandonment of residential under-ground fuel
tanks •
I_ Fire Department fee For inspections and follow up. For initial inspection, plans check and follow
up inspections as cal Led for in the Fire Code and performed by the fire department_the fire
department will be paid 65% of the fee collected for the permit. This payment will be paid
quarterly_ .
FIRE FALSE ALARM FEES
The Following fees are set for repeated malfunctioning false alarms in a given six month period.
First alarm No charge
Second alarm $30.00
Third alarm $70.60
Fourth alarm $120.00
Fifth and subsequent alarms Require a hired fire
watch
Fire watch service $180.04 3 hour min. plus
hourly thereafter
FIREWORKS
Public display fee* $100.00 Maximum per RCN
70.77
*.Also requires a performance bond or cash depo.si1 of$500.00 for clean up purposes and a
i'iabir?il rnsurarrcepo/icy of'$},000,000.00,
PERMITS
A. Conditional Use Permit $54.00
B. Demolition Permit $120.00
C. Temporary Use Permit $60.00
D. Tents/Canopy Permit Hourly Rate
•
Fee Resolution 05-024 Page 14 of20
•
•
•
PLANS CHECK AND REVIEW BY THE BUREAU OF FIRE PREVENTION
A. New commercial plans check and inspection(for projects $60.00
not mentioned elsewhere)
13. Hourly rate $60.00
C. After hour inspections,plans review, consultations for 1.5 times regular rate
projects that do not require a permit,and other special
services
PLATS
A. SubdivisionlPUD
I) Preliminary $120.00
2) Final $60.00
3) Alteration $60.00
13. Short Plat
I) Preliminary $120.00
2) Final $60.00
3) Alteration $60.00
SPECIAL INSPECTIONS
A. Day Care $60.00
B. Fire Damage $120.00
C. Nursing Home/Hospital for licensing $180.00
•
Fee Resolution 05-024 Page 15 of 20
I! ,
Schedule D — PARKS & RECREATION
ADMINISTRATIVE FEES
Basic fees to be considered when applying rates
Administrative Fee $30.00
Refuse Fee $50.00
AQUATICS
Pool admission (age 5 and under) free
Pool admission (age older than 5) $1.00
Pool punch pass(25 swims) $20.00
Weekend family discount I child under 13 free
with paying adult
Reservation(less than 50 people) $100.00 Per hour*
Food fee(if applicable) $25.00
Reservation (50— 100 people) $125.00 Per hour*
Food fee(if applicable) $50.00
Reservation (101 — 150 people) $150.00 Per hour*
Food fee(if applicable) $75.00
*Minimum 2 hours
ALCOHOLIC BEVERAGE PERMIT
Alcoholic Beverage Permit Fee $10.00
CENTERPLACE
Conference Center Wing
Auditorium $75.00 Per hour
Auditorium $450.00 Per day
Auditorium $225.00 Per half day
Auditorium vv./Presentation System $50.00 Per hour
Auditorium w/Presentation System $300.00 Per day
Auditorium w/Presentation System $150.00 Per half day
Auditorium Deposit $50.00
Executive Conference Room $50.00 Per hour
Executive Conference Room Deposit $50.00
Meeting Room (Day& Evening Use) $40.00 Per hour
Meeting Room $250.00 Per day
Meeting Room $125.00 Per half day
Meeting Room Deposit $50.00
Fee Resolution 05-024 Page 16 of 20
Great Room
Kitchen w/Dining Room Rental $100.00 Per use
Kitchen-Commercial Use(2 hour min.) $50.00 Per hour
Kitchen Deposit S50.00
Multi-Use/Banquet Hall $100.00 Per hour
Multi-Use/Banquet Hall $800.00 9 hr session
Multi-Use/Banquet Hall $1,500.00 All clay(6am-lam)
Small Dining Area $50.00 Per hour
Deposit $200.00
Stage $20.00 Per section per day
Table Settings (linens& tableware) $2.00 Per place setting
Senior Center Wing
Lounge with Dance Floor $100.00 Per hour
Lounge with Dance Floor $800.00 Per day
Lounge Deposit $200.00
Meeting Room(Evening Use) $40.00 Per hour
Meeting Room (Evening Use) $125.00 4 hr session
Meeting Room (Weekend Use) $250.00 Per clay
Meeting Room (Weekend Use) $125.00 Per half day
Meeting Room Deposit $50.00
Private Dining Room $50.00 Per hour
Private Dining Room Deposit $50.00
Wellness Center $100.00 Per hour
Miscellaneous
Cleanup fee $50-300 Per event •
Host/Hostess (after hours) $15.00 Per hour
Presentation System(includes projector/podium/ • S250.00 Per day
DVDNCR/sound system/camera system)
Room Setup $25.00 Per hour
Satellite Video Conferencing S250.00 Per hour
Sound System $40.00 Per day
Technical Support $40.00 Per hour
Television/VCR $75.00 Per day
Touch Pad Voting System S115.00 Base station per day
+$15.00 Per keypad per day
EVENTS-includes Pavilion
Events include but are not limited to activities such as car shows, tournaments and activities
involving 200 or more people. The Director of Parks and Recreation will make the final
determination.
General Fee $150.00
Non-profit applications $80.00 Or free with
sponsorship*
*Applications for joint sponsorship will? the City of Spokane Valley will be considered by the
Spokane Valley Parks Department.
Pee Resolution 05-024 Page 17 of 20
•
FIELD RENTAL
Use Fee $25.00 First hour plus $15
each additional hour
INDOOR USE
Open gym admission $2.00
•
Playground program admission (10 entries) $20.00
MIRABEAU
• Mirabeau Springs
Small shelter and waterfall $150.00 Maximum 4 hours
Refundable deposit(less than 200 people) $50.00
Mirabeau Meadows
Shelter(less than 200 people) $80.00
Shelter(200 or more people) $150.00
Refundable deposit(less than 200 people) $50.00
Refundable deposit(200 or more people) $250.00
PICNIC SHELTERS
Picnic Shelter(less than 200 people) $30.00
Picnic Shelter(200 or more people) $150.00
Refundable deposit(less than 200 people) $50.00
Refundable deposit(200 or more people) $250.00
•
PROFESSIONAL PHOTOGRAPHY
Permit Fee $25.00 Annual
RECREATION
Recreation program fees are set to recover costs as specified in the Parks and Recreation revenue
policy.
VALLEY MISSION ARENA
Rental* $100.00 Per weekend
Refundable deposit $50.00
*Renter responsible for on-site preparation. Rental requires liability insurance.
•
Fee Resolution 05-024 Page 18 of 20
•
Schedule E - ADIMINISTRATIVE
COPY FEES
Copy of audio tapes, video tapes, photos, maps or other At cost
records needing reproduction
Copy of written records • $0.15 Per page
Copy of full documents At cost
OTHER ADML.NISTRATIVE FEES
NSF Check $25.00
•
•
•
•
•
Fee Resolution 05-024 Page [9 of 20
•
Schedule F - OTHER FEES
ADULT ENTERTAINMENT FEES
Establishment Licenses
Live Adult Entertainment $1,500.00
Adult Arcade $1,500.00
Other Adult Entertainment Licenses
Adult Arcade Device License $150.00
Manager License $150.00
Entertainer License $150.00
Late License Fee—Charged in addition to license fee.
Percent of
Past Due Calendar Days License Fee
7—30 25%
31 —60 50%
61 and over 75%
BUSINESS REGISTRATION FEES
Business registration $13 each year
Nonprofit registration $ 3 each year
SECURITY FALSE ALARM FEES
Repeated malfunctioning security false alarms in a given six-month period.
First alarm No charge
Second alarm $30.00
Third alarm $70.00
Fourth and subsequent alarms S 120.00
STORM WATER UTILITY CHARGE ON DEVELOPED PARCELS
Each single-family unit each year 20.00
All other properties each year 20.00 Per 3;160 square feet
of impervious surface
TOW OPERATOR ANNUAL REGISTRATION FEE $100.00
OVERSIZED LOAD PER.NllT FEE $25.00
•
Fee Resolution 05-024 Page 20 of 20