Resolution 06-014 Amending Master Fee Schedule CITY OF SPOKANE VALLEY
SPOKANE COUNTY,WASHINGTON
RESOLUTION NO.06-014
A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY,
WASHINGTON, AMENDING RESOLUTION 06-001, AND APPROVING G AN
AMENDED MASTER FEE SCHEDULE
WHEREAS, it is the general policy of the City to establish fees that are reflective of the cost of
services provided by the City; and
WHEREAS, the City uses a resolution to establish fees for City programs, permits and services,
and periodically, the fee resolution must be updated to incorporate new or modified services;and
WHEREAS, Council desires to modify the Resolution and accompanying Fee Schedule.
NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane
County, Washington, as follows:
Section 1. The changes needed at this time are incorporated into the attached schedules, and
include (1) establishing a specific fee of$500.00 for appeals allowed under Spokane Valley Municipal
Code 10.30.150-.660 (Schedule A); (2) reinstating a $60.00 blasting permit fee (Schedule B); (3)setting
an hourly rate of$58 for re-review of plans (Schedule B); (4) updating fire code fees (Schedule C); and
(5)establishing a$3.00 large format copy fee(Schedule E).
Section 2. Repeal. To the extent that previous fee schedules are inconsistent with those set
forth herein, they are repealed.
Section 3. Effective Date. This Resolution shall be in full force and effect upon adoption.
Approved this I I'h day of July, 2006.
KITES : CITY OF SPOKANE VALLEY
( (-32t/Via CAAthit-
Christine Bainbridge, City Clerk Diana Wilhite, Mayor
Approved as to form:
Office o the City Attorney
AMENDED MASTER FEE SC.HED'ULE
Fee Schedule Page No.
Schedule A: Development 3
Schedule B: Building 5
Schedule C: Fire Code 13
Schedule D: Parks & Recreation 16
Schedule E: Administrative 19
Schedule F: Other Fees 20
Fee Resolution 06-014
Page 2 of 18
•
MASTER FEE SCHEDULE
Schedule A— DEVELOPMENT
AMENDMENTS
Comprehensive Plan amendment $1,500.00
Zoning or other code text amendment S1,500.00
APPEALS
Appeal of Administrative Decision $1,000.00
Appeal of Hearing Examiner findings S300.00
Transcript/record deposit fee on appeals of Hearing $150.00
Examiner's decisions
Appeal of determination made pursuant to SVMC S500.00
10.30.150-.660
ENVIRONMENTAL REVIEW
State Environmental Policy Act(SEPA)
Single dwelling(when required) $100.00
All other developments $350.00
Environmental Impact Statement(EIS)Review 52,200.00
Addenda of existing EIS Review $350.00
Shoreline
Substantial Development Permit S800.00
Critical Areas $300.00
Floodplain Permit S50.00 Per lot
PERMITS
home Occupation Permit $80.00
Conditional Use Permit S800.00
Temporary Use Permit S150.00
PLATS
Subdivisions
Preliminary plat $2,150.00 Plus S40.00 per lot
Final plat S1,250.00 Plus$10.00 per lot
Short Plats
Preliminary 2-4 lots $750.00
Final Plat 2-4 Lots $1,050.00 Plus$10.00 per lot
Preliminary plat 5-9 Lots $1,250.00 Plus S25.00 per lot
Final Plat 5-9 Lots $1,050.00 Plus S10.00 per lot
Fee Resolution 06-014
Page 3 of 18
Plat Alteration
Subdivision plat $650.00
Short plat $265.00
Binding Site Plan $1,500.00
Binding site plan modification $1,300.00
Change of Conditions S650.00
Aggregation/Segregation
Lot line adjustment $100.00
Lot line elimination $100.00
Zero lot line $100.00 Plus $10.00 per lot
SIGNS
Review of permanent sign $50.00 Plus$25.00 if Public
Works review is
needed
Review of temporary sign $50.00
SITE PLAN REVIEW $550.00
STREET VACATION APPLICATION $1,300.00
VARIANCES
Administrative $300.00
Public Hearings $1,500.00
ZONING
Zoning map amendments (rezone)* $1,650.00
PUT) plan $1,500.00 Plus $25.00 per lot
PUD modification $500.00
*If rezone is combined with other action(s),cost of
other action(s) is additional.
Note: The Building Official is authorized to require the permit applicant to provide fee
reimbursement to the City of Spokane Valley for any professional services required outside of
City staff review. Some examples of potential outside resources include plan review,
construction inspection and surveying.
Fee Resolution 06-014
Page 4 of 18
Schedule B —BUILDING
The building code permit fees are collected at the time of the issuance of the building permit.
Other fees are also to be collected at the time of the issuing of the building permit. Each
department for whom the fee is collected is to advise the permit specialist of fees due.
GRADING
Permit Fees
Cubic Yards FEE
100 or less $20.00
101 to 1,000 $20.00 for the first 100 Cu. Yd., plus $7.00 for
each additional 100 Cu. Yd.
1,001 to 10,000 $83.00 for the first 1,001 Cu. Yd., plus $6.00 for
each additional 1,000 Cu. Yd.
10,001 to 100,000 S147.00 for the first 10,000 Cu. Yd. plus$15.00 for
each additional 10,000 Cu. Yd.
100,001 to 200,000 $368.00 for the first 100,000 Cu. Yd. plus $15.00
for each additional 100,000 Cu. Yd.
200,000 or more $503.00 for the first 200,000 Cu. Yd. plus $1.5.00
for each additional 200,000 Cu. Yd.
Blasting Permit Fee (Life Safety) $60
Plans Checking Fees
Cubic Yards FEE
50 or less No fee
51 to 100 $12.00
101 to 1,000 $20.00
1,001 to 10,000 $25.00
10,001 to 100,000 $25.00 for the first 10,000 Cu. Yd. plus S7.00 for
each additional 10,000 Cu. Yd.
100,001 to 200,000 598.00 for the first 100,000 Cu. Yd. plus $6.00 for
each additional 100,000 Cu. Yd.
200,001 or more $158.00
Land Clearing only(without earth being moved) $65.00
Paving Permit(greater than 5,000 SF—new paving only) $250.00
Pee Resolution 06-014
Page 5 of 18
•
STRUCTURAL CODE
Building permit fees for each project arc set by the following fee schedule. The table below is to be used
to determine the building permit fees and plans check fees based on the value of the construction work as
stated by the applicant or the value calculated by the Building Official using the latest valuation data
published in the Building Safety Journal by the International Code Council, whichever value is greatest.
Valuation Table
Total Valuation Fee
$1 to 525,000 $69.25 for the first$2,000 plus $14 for each
additional$1,000, or fraction thereof, up to and
including $25,000
$25,001 to$50,000 S391.25 for the first S25,000 plus $10.10 for each
additional $1,000, or fraction thereof, up to and
including $50,000
$50,001 to 5100,000 $643.75 for the first$50,000 plus $7 for each
additional $1,000, or fraction thereof, up to and
including$100,000
$100,001 to $500,000 $993.75 for the first $100,000 plus $5.60 for each
additional $1,000, or fraction thereof, up to and
including$500,000
• $500,001 to $1,000,000 S3,233.75 for the first $500,000 plus 54.75 for each
additional S1,000, or fraction thereof, up to and
including$1,000,000
$1,000,000 and up $5,608.75 for the first$1,000,000 plus $3.15 for each
additional $1,000, or fraction thereof
Valuation Exceptions Fee Per
Square Foot
Private garages (wood frame) $19.00
Private garages (masonry) $22.00
Pole buildings $19.00
Open carport, decks, porches $15.00
Plans Review Fees
For other than signs, one and two family residential structures and the associated accessory buildings or
structures, a Plans Review Fee Deposit of $200 shall be collected at the time of acceptance of the
Building Permit Application. The application shall be accepted only when the application is determined
to be complete by City staff.
For signs, one and two family residential structures and the associated accessory buildings or structures,
no plan review deposit will be required at the time of Building Permit Application submittal.
The balance of the Plan Review Fee shall be collected at the time of Building Permit issuance along with
the WSBCC Fee. Any excess deposit collected during the application process shall be applied to the
Building Permit Fee.
Plans Review Fees are not refundable once the plan review has been started. Plans Review Fees are
additional to Building Permit Fees.
Fee Resolution 06-014
Page 6 of 18
Plans review fee(general) 65% Of bldg permit fee
Plans review fee—Group R-3 occupancies(single 40% Of bldg permit fee
family less than 7,999 sq. ft.)
Plans review fee—Group R-3 occupancies(single 65% Of bldg permit fee
family 8,000 sq. ft. or greater)
Plans review fee—U-1 or U-2 occupancies(sheds, 25% Of bldg permit fee
barns,etc.)
Plans review fee—temporary tent or structure 25% Of bldg permit fcc
Initial Plan Review Fees shall be capped at$35,000 maximum with the following exception:
Exception#11:
If additional professional resources are required for individual project plan review for those projects that
reach the maximum Plan Review Fee, the Building Official shall be authorized to require the permit
applicant to provide those resources to the City of Spokane Valley.
If a set of plans already checked and approved is resubmitted by the owner or his/her agent, an hourly rate
of$58.00 will be applied for the re-review.
PLUMBING CODE
The plumbing code fees will be collected when the associated permit is issued. if the plumbing is
included in the Building Permit the unit costs are added, but not the basic plumbing permit fee.
A. Basic fees
1) Basic fee for issuing each permit $35.00
2) Basic for each supplemental permit $7.50
B. Unit fees (in addition to the basic fee)
1) For each plumbing fixture on a trap (including $6.00
garbage disposals,dish washers, back flow
device,drainage,hot tubs, built in water
softener,water closets,lavatories,sinks,drains,
etc)
2) Private sewage disposal system $20.00
3) Water heater $6.00 Each
4) Industrial waste pretreatment interceptor S15.00
•
including its trap and vent,except kitchen type
grease interceptors functioning as fixture traps.
5) Repair or alteration of water piping,drainage $6.00 Each fixture
or vent piping
6) Lawn sprinkler system on any one meter $25.00
7) Atmospheric type vacuum breaker $6.00 Each
8) Backflow protective device other than $6.00 Each
atmospheric type vacuum breakers
9) Medical gas $6.00 Per outlet
10) Interceptors S6.00 Each
Fee Resolution 06-014
Page 7 of 18
MECHANICAL CODE
The mechanical code fees will be collected when the associated permit is issued. If it is included in the
Building Permit, the unit costs arc added, but not the basic mechanical permit fee.
A. Basic fees
1) Basic fee for issuing each permit $35.00
2) Basic for each supplemental permit $7.50
B. Unit fees(in addition to the basic fee)
1) Furnaces &suspended heaters- Installation or
relocation
a. up to and including 100,000 btu $12.00
b. over 100,000 btu $15.00
2) Duct work system $10.00
3) Heat pump & air conditioner
a. 0 to 3 tons S12.00
b. over 3 to 15 tons $20.00
c. over 15 to 30 tons $25.00
d. over 30 to 50 tons $35.00
e. over 50 tons $60.00
4) Gas water heater $10.00
5) Gas piping system $1.00 Per outlet
6) Gas log, fireplace,and gas insert installation S10.00
7) Appliance vents installation; relocation; $10.00 Each
replacement
8) Repairs or additions $15.00
9) Boilers, compressors, and absorption systems
a. 0 to 3 hp- 100,000 btu or less $12.00
b. Over 3 to 15 hp- 100,001 to 500,000 btu $20.00
c. Over 15-30 hp-500,001 to 1,000,000 $25.00
btu
d. over 30 hp- 1,000,001 to 1,750,000 btu $35.00
e. over 50 hp-over 1,750,000 btu $60.00
10) Air Handlers
a. Each unit up to 10,000 cfm, including $12.00
ducts
b. Each unit over 10,000 cfm $15.00
11) Evaporative Coolers (other than portable) $10.00
12) Ventilation and exhaust
a. Each fan connected to a single duct $10.00
b. Each ventilation system $12.00
c. Each hood served by mechanical exhaust $12.00
13) Incinerators
a. Installation or relocation of residential $19.00
b. Installation or relocation of commercial $22.00
14) Appliances, each $10.00
15) Unlisted appliances
a. under 400,000 btu $50.00
b. 400,000 btu or over $100.00
Fee Resolution 06-014
Page 8 of 18
16) Hood
a. Type 1 $50.00
b. Type II $10.00
17) L P Storage tank $10.00
18) Wood or Pellet stove insert S10.00
19) Wood stove system —free standing S25.00
ENERGY CODE
Energy Code Plans check fee is also established to check to meet the requirements of RCW 51-11 WAC.
These are in addition to the Building Code Fees. If City inspectors are assigned to verify Energy Plans,
the following fees apply. If an outside energy inspector is required, that fee will be determined by the
outside agency.
Residential Remodel/Addition $-0-
New Single Family $-0-
Tenant Improvement
A. 0 to 10,000 square feet S35.00
B. 10,001 square feet and over $45.00
C. Multi-Family $60.00 Per building
D. New Commercial and industrial $90.00
OTHER BUILDING CODE FEES
Annual Permit
Annual Spokane Valley Building Permits used to:
1) maintain equipment or buildings,
2) construct or remodel small areas of assembly occupancies, or
3) install tents or membrane structures
may be available depending upon the determination of the valuation of work made by the Spokane Valley
Building Official. Certain record keeping and inspection responsibilities shall be established in a site
specific Spokane Valley Annual Permit Agreement.
Approach Permit S50.00 •
Demolition Permit
Single Family Residence $44.00
Commercial buildings S125.00
Garage or accessory building associated with a $20.00
residence or commercial building
Septic tank or underground flammable tank associated S10.00 Each
with a residence or commercial building
Early Start Agreements(Foundations) 25% Of bldg permit fee
Right-of-Way Obstruction Permit $70.00
Fee Resolution 06-014
Page 9 of 18
I I
Sign Fees
Fees collected for a sign permit and a plans check fee for signs erected in accordance with the Sign Code.
The fee below plus the WSBCC fee of$4.50.
Signs mounted on buildings 545.00
Sign and pole mounting S65.00
Temporary Certificate of Occupancy 550.00
Washington State Building Code Council (W.S.B.C.C.) Surcharge
A flat fee of$4.50 will be collected on each permit for approved plans or any other permit that is issued in
accordance with the Spokane Valley Building Code. EXCEPT: For multi-family projects, the fee is $4.50
for the first living unit and $2.00 for each additional unit. The City Finance Department will forward this
fee to the WSBCC on a quarterly basis.
OTHER MISCELLANEOUS FEES
A. For City personnel
1) Hourly rate set for City Employees (unless $58.00
otherwise specified)
2) Overtime charges 1.5 times regular
rate
B. Hourly rate for contracted services Set according to
contract rate
C. Hourly rate for special called inspections $58.00
D. Mobile home location permit and inspection
1) Temporary' mobile home $60.00
2) Manufactured home inspection, per section S50.00 *
E. House Moving Fee
1) Class 1, II, and III—Moving permit $60.00
2) Class 1, II, and 111 —Inspection fee $60.00 **
3) Class 1V (if already permitted by Spokane S -0-
County or Spokane City)
*Plus basement/crawlspace valuation permit fee
**Plus$58.00 per hour after the 1"hour, and$.50 per mile if the building to be moved into the
City is outside the City limits
Fee Resolution 06-014
Page 10 of 18
F. Minimum Housing Inspection fee $55.00 Plus 558.00 per
hour after l''hour
G. Work on any structure or building without a
permit if a Spokane Valley Permit is required:
1) Minimum investigative inspection fee $55.00
2) Total investigative fee to be equal to the permit fee determined for the value of the
illegal work accomplished
H. Special inspections (requested by owner or tenant)
1) Fire,wind, mud slide or flood damage $60.00
2) Day Care $60.00
3) Nursing Homes, hospitals, et al $60.00 Plus S 58.00 per
hour after 1st hour
4) Special Occupancies $60.00
I. Excess inspections for a given project created by $58.00 Per inspection or
the developer, owner or contractor re-inspection
J. Condominium conversion plans review/inspection Based on value of
fee project and bldg
code valuation
K. Temporary tents, canopies, and air supported structures for public use; inclusive of
all tents for a single event. It does not apply to tents less than 200 sq. ft., canopies less
than 400 sq ft, camping tents, or to tents used for private, non commercial events.
1) Plans check fee $13.00
2) Basic permit fee $60.00
L. Enclosing an existing deck or patio
1) Plans check fee 40% Of the basic fee for
plans examination
2) Basic permit fee Based on value of
project; minimum
$3,000
M. Swimming pools (Over 5,000 gallons) $50.00 Plus plumbing fees
N. Re-roof Permit: Fee based on the value of the project. No plan review fee will be charged
unless plans are submitted for review.
O. Change of Use or Occupancy Classification permit $47.00
P. Towers, elevated tanks, antennas Based on value of
project
BUILDING CODE FEE REFUND POLICY
No Permit Fee refund is allowed once the work has been started. If a refund is requested,the request shall
be addressed to the Building Official in writing, and shall be received at the Spokane Valley Permit
Center within 180 days of the date of issuance of the permit. Any fee refund request received after 180
days of the date of permit issuance shall be denied. Any refund approved shall be limited to 80% of the
total Permit Fee paid. Refunds shall be limited to Building,Plumbing and Mechanical Permit fees paid to
the City of Spokane Valley.
•
Fee Resolution 06-014
Page 11 of 18
•
Schedule C - FIRE CODE
FIRE ALARM, SPRINKLER AND OTHER PROTECTION SYSTEMS
City processing fee of$35 is added to these Fire District 1 fees.
Plans check and review fees, inspections, and permit for installation of separate fire alarm system or
sprinkler system applications,and other fire protection systems.
Fire Alarm System
New installation
1-4 devices $150
5-100 devices $250
Additional 100 devices $ 50
Each additional panel $ 40
Sprinkler supervision only $ 75
•
Each additional floor $ 40
Fire Sprinkler Systems
1-9 heads $ 53
10-49 $165
50-100 $275
101-200 $325
201-300 $350
301-400 $375
401-500 $425
500+ $500 + $.33 per head
For hydraulically designed systems multiply the above fee by 2
New Suppression Systems
Range hoods, halon, CO2, dry chemical, FM 200, intcrgen spray booths, etc.
Unit 1-5 nozzles $100
Over 5 nozzles $100 +$10 per nozzle
Bottle(s) • $30 per bottle
Fire Pump Installation
Plan review& inspection fee $500
Underground Fire Mains—Plan review and inspect. $150
Standpipes not a part of automatic suppression system
Plan review and inspection $150
Fee Resolution 06-014
• Page 12 offs
Other Protection Systems
Fire extinguishing system (other than sprinklers) - $ 50
plus $1.50 per nozzle
Standpipe installation
Class 1 and Class Il $ 58
Class II1 $ 70
Tank installation - per tank
Flammable and combustible liquids - storage
tanks installation $ 60
Hazardous materials -, storage tanks installation $ 60
Liquefied petroleum $ 60
Gaseous oxygen systems $ 60
Nitrous systems $ 60
Medical gas systems $ 60
I-Iazardous material recycling systems $ 60
Vapor recovery system $ 60
Cryogenic $ 60
Removal, abandonment or any combination
thereof of flammable or combustible
liquid storage Wks $ 90
Emergency or standby commercial power
generator install $ 60
PERMITS
• Conditional Use Permit $ 60
•
Temporary Use Permit 60
Tents/canopy Permit (event) To be determined
PLANS CHECK AND REVIEW BY THE BUREAU OF FIRE PREVENTION
New commercial plans check and inspection (for
projects not mentioned elsewhere) $ 60
LAND USE
SubdivisionfPlJI
Preliminary $10
Final $ 60
Short Plat
Preliminary $120
Final $ 60
Fee Resolution 06014
Page 13 of l8
Schedule D — PARKS & RECREATION
EATIO
ADMINISTRATIE FEES
Basic fees to be considered when applying rates
Administrative Fee $30.00
Refuse Fee 550,00
AQUATICS
Pool admission (age 5 and under) free
Pool admission (age older than 5) $1.00
Pool punch pass (25 swims) 520.110
Weekend family discount 1 child under 13 free
with paying adult
Reservation (less than 50 people) $1.00,00 Per hour*
Food fee (if applicable) 525.00
Reservation (50— 100 people) $125.00 Per hour*
Food fee (if applicable) 550.00
Reservation (101 - 150 people) $150.00 Per hour*
Food Fee (if applicable) 575.00
*Minimum 2 hours
ALCOHOLIC BEVERAGE PERMIT
Alcoholic Beverage Permit Fee 510.00
CENTERPLACE
Conference Center Wing
Auditorium 575,00 Per hour
Auditorium $450.00 Per day
Auditorium $225.00 Per half day
Auditorium w/Presentation System 550,00 Per hour
Auditorium wlPresentatiun System $300.00 Per day
Auditorium wfPresentation System $1.50,00 Per half day
Auditorium Deposit 550.00
Executive Conference Room 550.00 Per hour
Executive Conference'Room'Deposit $50.00
Meeting Room (Day&. Evening Use) . 540.00 Per hour
Meeting Room $250.00 Per day
Meeting Room 5125.00 Per half day
Meeting Room Deposit $50.00
Fee Resolution 06-0[4
Page 14 of 18
Great Room
Kitchen w/Dining Room Rental $100.00 Per use
Kitchen-Commercial Use (2 hour min.) $50.00 Per hour
Kitchen Deposit S50.00
Multi-Use/Banquet Hall $100.00 Per hour
Multi-Use/Banquet Hall $800.00 9 hr session
Multi-Use/Banquet Hall $1,500.00 All day(6am-lam)
Small Dining Area $50.00 Per hour
Deposit S200.00
Stage $20.00 Per section per day
Table Settings(linens & tableware) $2.00 Per place setting
Senior Center Wing
Lounge with Dance Floor $100.00 Per hour
Lounge with Dance Floor S800.00 Per day
Lounge Deposit $200.00
Meeting Room (Evening Use) $40.00 Per hour
Meeting Room (Evening Use) $125.00 4 hr session
Meeting Room (Weekend Use) $250.00 Per day
Meeting Room (Weekend Use) $125.00 Per half day
Meeting Room Deposit $50.00
Private Dining Room $50.00 Per hour
Private Dining Room Deposit $50.00
Wellness Center $100.00 Per hour
Miscellaneous
Cleanup fee $50-300 Per event
Host/Hostess(after hours) $15.00 Per hour
Presentation System (includes projector/podium/ $250.00 Per day
DVD/VCR/sound system/camera system)
Room Setup $25.00 Per hour
Satellite Video Conferencing $250.00 Per hour
Sound System $40.00 Per day
Technical Support $40.00 Per hour
Television/VCR $75.00 Per day
Touch Pad Voting System $115.00 Base station per
+$15.00 day
Per keypad per day
EVENTS-includes Pavilion
Events include but are not limited to activities such as car shows, tournaments and activities involving
200 or more people. The Director of Parks and Recreation will make the final determination.
General Fee $150.00
Non-profit applications S80.00 Or free with
sponsorship*
*Applications for joint sponsorship with the City of Spokane Valley will be considered by the Spokane
Valley Parks Department.
Fee Resolution 06-014
Page l5ofl8
FIELD RENTAL
Use Fee $25.00 First hour plus$15
each additional hour
INDOOR USE
Open gym admission $2.00
Playground program admission (10 entries) $20.00
MIRABEAU
Mirabcau Springs
Small shelter and waterfall $150.00 Maximum 4 hours
Refundable deposit(less than 200 people) S50.00
Mirabeau Meadows
Shelter(less than 200 people) S80.00
Shelter(200 or more people) $150.00
Refundable deposit(less than 200 people) $50.00
Refundable deposit(200 or more people) $250.00
PICNIC SHELTERS
Picnic Shelter(less than 200 people) $30.00
Picnic Shelter(200 or more people) $150.00
Refundable deposit(less than 200 people) $50.00
Refundable deposit (200 or more people) $250.00
PROFESSIONAL PHOTOGRAPHY
Permit Fee $25.00 Annual
RECREATION
Recreation program fees are set to recover costs as specified in the Parks and Recreation revenue
policy.
VALLEY MISSION ARENA
Rental* $100.00 Per weekend
Refundable deposit S50.00
*Renter responsible for on-site preparation. Rental requires liability insurance.
Fee Resolution 06-014
Page 16 of 18
Schedule E - ADMINISTRATIVE
COPY FEES
Copy of audio tapes,video tapes, photos,maps or other At cost
records needing reproduction
Copy of written records S0.15 Per page
Copy—Large format $3.00 Per page
Copy of full documents At cost
OTHER ADMINISTRATIVE FEES
NSF Check 525.00
•
•
•
Fee Resolution 06-014
Page 17 of 18
Schedule F - OTHER FEES
ADULT ENTERTAINMENT FEES
Establishment Licenses
Live Adult Entertainment $1,500.00
Adult Arcade 51,500.00
Other Adult Entertainment Licenses
Adult Arcade Device License $150.00
Manager.License $150.00
Entertainer License $1.50.00
Late License Fee-Charged in addition to license fee.
Percent of
Past Due Calendar Days .License Fee
7-30 25%
3.!. -60 50%
61 and over 75%
BUSINESS REGISTRATION FEES
Business registration $13 each year
Nonprofit registration $ 3 each year
SECURITY FALSE ALARM FEES
Repeated malfunctioning security false alarms in a given six-month period.
First alarm No charge
Second alarm $30.00
Third alarm S70.00
Fourth and subsequent alarms 5.1.20.00 •
STORM WATER UTILITY CHARGE ON DEVELOPED PARCELS
Each single-family unit each year 20,00
All other properties each year 20.00 Per 3,160 square feet
of impervious surface
TOW OPERATOR ANNUAL REGISTRATION FEE $100.00
OVERS]ZED LOAD PERMIT FEE $25,00
Fee Resolution 06-014
Page 18 of 1 S