Loading...
Resolution 06-024 Amending Fee Resolution CITY OF SPOKANE VALLEY SPOKANE COUNTY,WASHINGTON RESOLUTION NO. 06-024 A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY, WASHINGTON, AMENDING RESOLUTION 06-014, AND APPROVING AN AMENDED MASTER FEE SCHEDULE WHEREAS, it is the general policy of the City to establish fees that are reflective of the cost of services provided by the City; and WHEREAS, the City uses a resolution to establish fees for City programs, permits and services, and periodically, the fee resolution must be updated to incorporate new or modified services; and WHEREAS, Council desires to modify the Resolution and accompanying Fee Schedule. NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane County, Washington,as follows: Section 1. The changes needed at this time are incorporated into the attached schedules, and include (1) deleting a blasting permit fee (page 5); (2) increasing the storm water fee per equivalent residential unit to $21 from $20 (page 19); (3) updating the right of way permit fee (page 10); (4) miscellaneous housekeeping changes (pages 7, 9, 10 and 12); and updating plat/binding site plan fees (pages 3, 4). Section 2. Remq. To the extent that previous fee schedules are inconsistent with those set forth herein,they are repealed. Section 3. Effective Date. This Resolution shall be in full force and effect January 1, 2007. Approved this 28,x'day of November, 2006. AU°.'1': CITY OF SPOKANE VALLEY All =�.�� WIIL1 Christine Bainbric ge, City Clerk Diana Wilhite, Mayor Approved as to form: �J Office of the City Attorney AMENDED MASTER FEE SCHEDULE Fee Schedule Page No. Schedule A: Development 3 Schedule 13: Building 5 Schedule C: Fire Code 13 Schedule D: Parks & Recreation 16 Schedule E: Administrative 19 Schedule :F.: Other Fees 20 Fee Resolution 06-014 Page 2 of 19 • MASTER FEE SCHEDULE Schedule A — DEVELOPMENT AMENDMENTS Comprehensive Plan amendment $1,500.00 Zoning or other code text amendment $1,500.00 APPEALS Appeal of Administrative Decision $1,000.00 Appeal of Rearing Examiner findings $300.00 Transcript/record deposit fee on appeals of Rearing $150.00 Examiner's decisions Appeal of determination made pursuant to SVMC $500.00 10.30.150-.660 ENVIRONMENTAL REVIEW State Environmental Policy Act(SEPA) Single dwelling (when required) S100.00 All other developments $350.00 Environmental Impact Statement (EIS) Review $2,200.00 Addenda of existing EIS Review 5350.0( Shoreline Substantial Development Permit $800.00 Critical Areas $300.00 Floodplain Permit $50.00 Per lot PERMITS Rome Occupation Permit $80.00 Conditional Use Permit 5800.00 Temporary Use Permit $150.00 PLATS Subdivisions Preliminary plat $2,324 Plus $40.00 per lot Final plat $1,424 Plus 510.00 per lot Short Plats Preliminary 24 lots $924 Final Plat 2-4 Lots $1,224 Plus$10.00 per lot Preliminary plat 5-9 Lots $1,424 Plus$25.00 per lot Final Plat 5-9 Lots $1,224 Plus$10.00 per lot Fee Resolution 06-014 Page 3 of 19 Plat Alteration Subdivision plat $650.00 Short plat $265.00 Binding Site Plan Binding site plan modification S1,474 Change of Conditions $650.00 Binding site plan $1,674 Aggregation/Segregation Lot line adjustment $100.00 Lot line elimination $100.00 Zero lot line $100.00 Plus S10.00 per lot SIGNS Review of permanent sign S50.00 Plus $25.00 if Public Works review is needed Review of temporary sign $50.00 SITE PLAN REVIEW $550.00 STREET VACATION APPLICATION S1,300.00 VARIANCES Administrative $300.00 Public Hearings S1,500.00 ZONING Zoning map amendments(rezone)* S1,650.00 PUD plan S1,500.00 Plus$25.00 per lot PUD modification $500.00 *If rezone is combined with other action(s),cost of other action(s) is additional. Note: The Building Official is authorized to require the permit applicant to provide fee reimbursement to the City of Spokane Valley for any professional services required outside of City staff review. Some examples of potential outside resources include plan review, construction inspection and surveying. Fee Resolution 06-014 Page 4 of 19 • Schedule B — BUILDING The building code permit fees are collected at the time of the issuance of the building permit. Other fees are also to be collected at the time of the issuing of the building permit. Each department for whom the fee is collected is to advise the permit specialist of fees due. GRADING Permit Fees Cubic Yards FEE 100 or less $20.00 101 to 1,000 $20.00 for the first 100 Cu. Yd., plus $7.00 for each additional 100 Cu. Yd. 1,001 to 10,000 $83.00 for the first 1,001 Cu. Yd., plus $6.00 for each additional 1,000 Cu. Yd. 10,001 to 100,000 $147.00 for the first 10,000 Cu. Yd. plus $15.00 for each additional .10,000 Cu. Yd. 100,001 to 200,000 $368.00 for the first 100,000 Cu. Yd. plus $15.00 for each additional 100,000 Cu. Yd. 200,000 or more $503.00 for the first 200,000 Cu. Yd. plus $15.00 for each additional 200,000 Cu. Yd. Plans Checking Fees Cubic Yards FEE 50 or less No fee 51 to 100 $12.00 101 to 1,000 $20.00 1,001 to 10,000 $25.00 10,001 to 100,000 $25.00 for the first 10,000 Cu. Yd. plus $7.00 for each additional 10,000 Cu. Yd. 100,001 to 200,000 598.00 for the first 100,000 Cu. Yd. plus $6.00 for each additional 100,000 Cu. Yd. 200,001. or more $158.00 Land Clearing only(without earth being moved) $65.00 Paving Permit(greater than 5,000 SF—new paving only) $250.00 Fee Resolution 06-014 Page 5 of 19 STRUCTURAL. CODE Building permit fees for each project are set by the following fee schedule. The table below is to be used to determine the building permit fees and plans check fees based on the value of the construction work as stated by the applicant or the value calculated by the Building Official using the latest valuation data published in the Building Safety Journal by the International Code Council, whichever value is greatest. Valuation Table Total Valuation Fee SI to $25,000 $69.25 for the first $2,000 plus $14 for each additional $1,000, or fraction thereof, up to and including S25,000 $25,001. to $50,000 $391.25 for the first S25,000 plus $10.10 for each additional$1,000, or fraction thereof, up to and including $50,000 $50,001 to $100,000 $643.75 for the.first S50,000 plus $7 for each additional S1,000, or fraction thereof, up to and including$100,000 $100,001 to $500,000 S993.75 for the first $100,000 plus $5.60 for each additional $1,000, or fraction thereof, up to and including$500,000 5500,001 to 51,000,000 $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000, or fraction thereof, up to and including 51,000,000 $1,000,000 and up $5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000, or fraction thereof Valuation Exceptions Fee Per Square Foot Private garages (wood frame) $19.00 Private garages (masonry) $22.00 Pole buildings $19.00 Open carport, decks, porches 51.5.00 Plans Review Fees For other than signs, one and two family residential structures and the associated accessory buildings or structures, a Plans Review Fee Deposit of $200 shall be collected at the time of acceptance of the Building Permit Application. The application► shall be accepted only when the application is determined to be complete by City staff. For signs, one and two family residential structures and the associated accessory buildings or structures, no plan review deposit will be required at the time of Building Permit Application submittal. The balance of the Plan Review Fee shall be collected at the time of Building Permit issuance along with the WSBCC Fee. Any excess deposit collected during the application process shall be applied to the Building Permit Fee. Plans Review Fees are not refundable once the plan review has been started. Plans Review Fees are additional to Building Permit Fees. Fee Resolution 06-014 Page 6 of 19 Plans review fee(general) 65% Of bldg permit fee Plans review fee—Group R-3 occupancies (single 40% Of bldg permit fee family less than 7,999 sq. ft.) Plans review fee—Group R-3 occupancies (single 65% Of bldg permit fee family 8,000 sq. ft. or greater) Plans review fee—U-1 or U-2 occupancies(sheds, 25% Of bldg permit fee barns,etc.) Plans review fee—temporary tent or structure 25% Of bldg permit fee Initial Plan Review Fees shall be capped at$35,000 maximum with the following exception: Exception#1: If additional professional resources are required for individual project plan review for those projects that reach the maximum Plan Review Fee, the Building Official shall be authorized to require the permit applicant to provide those resources to the Cite of Spokane Valley. If a set of plans already checked and approved is resubmitted by the owner or his/her agent, an hourly rate of$58.00 will be applied for the re-review. PLUMBING CODE The plumbing code fees will be collected when the associated permit is issued. If the plumbing is included in the Building Permit the unit costs are added, but not the basic plumbing permit fee. A. Basic fees 1) Basic fcc for issuing each permit S35.00 2) Basic for each supplemental permit $7.50 B. Unit fees(in addition to the basic fee) 1) For each_ plumbing fixture on a trap (including $6.00 garbage disposals,dish washers, back flow device, drainage, hot tubs, built in water softener,water closets, lavatories,sinks,drains, etc) 2) Private sewage disposal system 520.00 3) Water heater $6.00 Each 4) Industrial waste pretreatment interceptor 515.00 including its trap and vent,except kitchen type grease interceptors functioning as fixture traps. 5) Repair or alteration of water piping,drainage $6.00 Each fixture or vent piping 6) Atmospheric type vacuum breaker S6.00 Each 7) Backllow protective device other than $6.00 Each atmospheric type vacuum breakers 8) Medical gas S6.00 Per outlet 9) Interceptors S6.01) Each Fee Resolution 06-014 Page 7 of 19 MECHANICAL CODE The mechanical code fees will be collected when the associated permit is issued. If it is included in the Building Permit, the unit costs are added, but not the basic mechanical permit fee. A. Basic fees 1) Basic fee for issuing each permit $35.00 2) Basic for each supplemental permit $7.50 B. Unit fees (in addition to the basic fee) 1) Furnaces & suspended heaters- Installation or relocation a. up to and including 100,000 btu S12.00 b. over 100,000 btu S15.00 2) Duct work system $10.00 3) Heat pump & air conditioner a. O to 3 tons $12.00 b. over 3 to 15 tons $20.00 c. over 15 to 30 tons $25.00 d. over 30 to 50 tons $35.00 e. over 50 tons $60.00 4) Gas water heater $10.00 5) Gas piping system $1.00 Per outlet 6) Gas log, fireplace,and gas insert installation 510.00 7) Appliance vents installation; relocation; S10.00 Each replacement 8) Repairs or additions $15.00 9) Boilers, compressors, and absorption systems a. 0 to 3 hp - 100,000 btu or less $12.00 b. Over 3 to 15 hp - 100,001 to 500,000 btu $20.00 c. Over 1.5-30 hp -500,001 to 1,000,000 $25.00 btu d. over 30 hp - 1,000,001 to 1,750,000 btu $35.00 e. over 50 hp-over 1,750,000 btu $60.00 10) Air Handlers a. Each unit up to 10,000 cfm, including $12.00 ducts h. Each unit over 10,000 cfm $15.00 11) Evaporative Coolers (other than portable) $10.00 12) Ventilation and exhaust a. Each fan connected to a single duct 510.00 b. Each ventilation system S12.00 c. Each hood served by mechanical exhaust $12.00 13) Incinerators a. Installation or relocation of residential $19.00 b. Installation or relocation of commercial $22.00 14) Appliances, each S10.00 15) Unlisted appliances a. under 400,000 btu $50.00 b. 400,000 btu or over $100.00 Fee Resolution 06-014 Page 8 of 19 16) Hood a. Type I S50.00 b. Type II 510.00 17) L P Storage tank $10.00 18) Wood or Pellet stove insert $10.00 19) Wood stove system —free standing $25.00 ENERGY CODE Energy Code Plans check fee is also established to check to meet the requirements of RCW 51-11 WAC. These are in addition to the Building Code Fees. if City inspectors are assigned to verify Energy Plans, the following fees apply. If an outside energy inspector is required, that fee will be determined by the outside agency and the fees below will not apply. Residential Remodel/Addition $-0- New Single Family $-0- Tenant Improvement A. 0 to 10,000 square feet S35.00 B. 10,001 square feet and over S45.00 C. Multi-Family $60.00 Per building 0. New Commercial and industrial $90.00 OTHER BUILDING CODE FEES Annual Permit Annual Spokane.Valley Building Permits used to: 1) maintain equipment or buildings, 2) construct or remodel small areas of assembly occupancies,or 3) install tents or membrane structures may be available depending upon the determination of the valuation of work made by the Spokane Valley Building Official. Certain record keeping and inspection responsibilities shall be established in a site specific Spokane Valley Annual Permit Agreement. Approach Permit S50.00 Demolition Permit Single Family Residence $44.00 Commercial buildings S125.00 Garage or accessory building associated with a $20.00 residence or commercial building Septic tank or underground flammable tank associated S10.00 Each with a residence or commercial building Early Start Agreements (Foundations) 25% Of bldg permit fee Fee Resolution 06-014 Page 9 of 19 Right-of--way Permit: Category 1 Non-cut obstruction without clean-up $70 2 Non-cut obstruction with clean-up $105 3 Pavement cut obstruction non-winter $160 4 Pavement cut obstruction, winter S200 5 Long-duration or large projects $160 A traffic control plan review is required if more than 50% of the width of any street is closed or if a single arterial lane is closed. Plan review fec S50 If a category 5 permit requires additional time, the additional fee is $40 for each additional 3 days or part thereof. Multiple-use and long-duration permits shall require a minimum deposit of$1,000 Sign Fees Fees collected for a sign permit and a plans check fee for signs erected in accordance with the Sign Code. The fee below plus the WSBCC fee of$4.50. Signs mounted on buildings $45.00 Sign and pole mounting $65.00 Temporary Certificate of Occupancy $50.00 Washington State Building Code Council (W.S.B.C.C.) Surcharge A flat fee of$4.50 will be collected on each permit for approved plans or any other permit that is issued in accordance with the Spokane Valley Building Code. EXCEPT: For multi-family projects, the fee is$4.50 for the first living unit and $2.00 for each additional unit. The City Finance Department will forward this fee to the WSBCC on a quarterly basis. OTHER MISCELLANEOUS FEES A. For City personnel 1) Hourly rate set for City Employees (unless $58.00 otherwise specified) 2) Overtime charges 1.5 times regular rate B. Hourly rate for contracted services Set according to contract rate C. Hourly rate for special called inspections $58.00 Fee Resolution 06-014 Page 10 of 19 D. Mobile home location permit and inspection 1) Temporary mobile home $60.00 2) Manufactured home inspection, per section $50.00 * L. House Moving Fee 1) Class I, ii, and HI—Moving permit $60.00 2) Class I, II, and III—Inspection fee $60.00 ** 3) Class IV (if already permitted by Spokane S -0- County or Spokane City) *Plus basement/crawlspace valuation permit fee **Plus$58.00 per hour after the IS`how; and$.50 per mile lithe building to be moved into the City is outside the City limits F. Minimum Housing Inspection fee 555.00 Plus$58.00 per hour after 1' hour G. Work on any structure or building without a permit if a Spokane Valley Permit is required: 1) Minimum investigative inspection fee 555.00 2) Total investigative fee to be equal to the permit fee determined for the value of the illegal work accomplished H• Special inspections (requested by owner or tenant) 1) Fire, wind, mud slide or flood damage S60.00 2) Day Care $60.00 3) Nursing Homes, hospitals, et al $60.00 Plus S 58.00 per hour after 1st hour 4) Special Occupancies $60.00 1. Excess inspections for a given project created by $58.00 Per inspection or the developer, owner or contractor re-inspection J. Condominium conversion plans review/inspection Based on value of fee project and bldg code valuation K. Temporary tents, canopies, and air supported structures for public use; inclusive of all tents for a single event. it does not apply to tents less than 200 sq. ft., canopies less than 400 sq ft, camping tents, or to tents used for private, non commercial events. 1) Plans check fee $13.00 2) Basic permit fee $60.00 L. Enclosing an existing deck or patio 1) Plans check fee 40% Of the basic fee for plans examination 2) Basic permit fee Based on value of project; minimum $3,000 M. Swimming pools (Over 5,000 gallons) S50.00 Plus plumbing fees N. Re-roof Permit: Fee based on the value of the project. No plan review fee will be charged unless plans are submitted for review. O. Change of Use or Occupancy Classification permit S58.00 P. Towers, elevated tanks, antennas Based on value of project Fee Resolution 06-014 Page 1 I of 19 BUILDING CODE FEE REFUND POLICY No Permit Fee refund is allowed once the work has been started. If a refund is requested,the request shall be addressed to the Building Official in writing, and shall be received at the Spokane Valley Permit Center within 180 days of the date of issuance of the permit. Any fee refund request received after 180 days of the date of permit issuance shall be. denied. Any refund approved shall be limited to 80% of the total Permit Fee paid. Refunds shall be limited to Building, Plumbing and Mechanical Permit fees paid to the City of Spokane Valley. Fee Resolution 06-014 Page 12 of 19 Schedule C - FIRE CODE FIRE ALARM, SPRINKLER AND OTHER PROTECTION SYSTEMS City processing fee of$35 is added to these Fire District I fees. Plans check and review fees, inspections, and permit for installation of separate fire alarm system or sprinkler system applications, and other fire protection systems. Fire Alarm System New installation 1-4 devices $150 5-100 devices $250 Additional 100 devices $ 50 Each additional panel $ 40 Sprinkler supervision only $ 75 Each additional floor $ 40 Fire Sprinkler Systems 1-9 heads $ 53 10-49 $165 50-100 $275 101-200 $325 201-300 5350 301-400 $375 401-500 $425 500+ $500+ 5.33 per head For hydraulically designed systems multiply the above fee by 2 New Suppression Systems Range hoods, halon, CO2, dry chemical, FM 200, intergen spray booths, etc. Unit 1-5 nozzles $100 Over 5 nozzles $100 + $10 per nozzle Bottle(s) $30 per bottle Fire Pump Installation Plan review & inspection fee $500 Underground Fire Mains—Plan review and inspect. $150 Standpipes not a part of automatic suppression system Plan review and inspection $150 Fee Resolution 06-014 Page 13 of 19 Other Protection Systems Fire extinguishing system (other than sprinklers) - $ 50 plus $1.50 per nozzle Standpipe installation Class I and Class II $ 58 Class III $ 70 Tank installation - per tank Flammable and combustible liquids - storage tanks installation $ 60 Hazardous materials—storage tanks installation $ 60 Liquefied petroleum $ 60 Gaseous oxygen systems $ 60 Nitrous systems $ 60 Medical gas systems $ 60 Hazardous material recycling systems $ 60 Vapor recovery system $ 60 Cryogenic $ 60 Removal; abandonment or any combination thereof of flammable or combustible liquid storage tanks $ 90 Emergency or standby commercial power generator install $ 60 PERMITS Conditional Use Permit $ 60 Temporary Use Permit $ 60 Tents/canopy Permit (event) To be determined PLANS CHECK AND REVIEW BY THE BUREAU OF FiRE PREVENTION New commercial plans check and inspection (for projects not mentioned elsewhere) $ 60 LAND USE Subdivision/PUT) Preliminary $120 Final $ 60 Short Plat Preliminary $120 Final $ 60 Fee Resolution 06-014 Page 14 of 19 . Schedule 1) — PARKS & RECREATION ADMINISTRATIVE FEES Basic fees to be considered when applying rates Administrative Fee $30.00 Refuse Fee S50.00 AQUATICS Pool admission (age 5 and under) free Pool admission (age older than 5) $1.00 Pool punch pass (25 swims) S20.00 Weekend family'discount 1 child under 13 free with paying adult Reservation (less than 50 people) S100.00 Per hour* Food fee(if applicable) $25.00 Reservation (50— 100 people) $125.00 Per hour* Food fee(if applicable) S50.00 Reservation (101 — 150 people) $150.00 Per hour* Food fee (if applicable) S75.00 *Minimum 2 hours ALCOHOLIC BEVERAGE PERMIT Alcoholic Beverage Permit Fee S10.00 CENTERPLACE Conference Center Wing Auditorium $75.00 Per hour Auditorium $450.00 Per day Auditorium S225.00 Per half day Auditorium w/Presentation System $50.00 Per hour * Auditorium w/Presentation System S300.00 Per day Auditorium w/Presentation System $150.00 Per half day * Auditorium Deposit S50.00 Executive Conference Room S50.00 Per hour Executive Conference Room Deposit S50.00 Meeting Room (Day& Evening Use) S40.00 Per hour Meeting Room $250.00 Per day Meeting Room $125.00 Per half day Meeting Room Deposit S50.00 * Requires rental of presentation system on page 16 Fee Resolution 06-014 Pate 15 of 19 Great Room Kitchen w/Dining Room Rental 5100.00 Per use Kitchen-Commercial Use (2 hour min.) $50.00 Per hour Kitchen Deposit $50.00 Multi-Use/Banquet Hall S100.00 Pcr hour Multi-Use/Banquet Hall S800.00 9 hr session Multi-Use/Banquet Hall $1,500.00 All day(ham-lam) Small Dining Area $50.00 Per hour Deposit S200.00 Stage $20.00 Per section per day Table Settings (linens & tableware) $2.00 Per place setting Senior Center Wing Lounge with Dance Floor $100.00 Per hour Lounge with Dance Floor $800.00 Per day Lounge Deposit $200.00 Meeting Room (Evening Use) $40.00 Per hour Meeting Room (Evening Use) $125.00 4 hr session Meeting Room (Weekend Use) $250.00 Per day Meeting Room (Weekend Use) $125.00 Per half day Meeting Room Deposit $50.00 Private Dining Room $50.00 Per hour Private Dining Room Deposit $50.00 Wellness Center $100.00 Per hour Miscellaneous Cleanup fee S50-300 Per event Host/Hostess(after hours) $15.00 Per hour Presentation System (includes projector/podium/ 5250.00 Per day DVDNCR/sound system/camera system) Room Setup $25.00 Pcr hour Satellite Video Conferencing S250.00 Per hour Sound System $40.00 Per day Technical Support $40.00 Per hour TelevisionNCR $75.00 Per day Touch Pad Voting System 5115.00 Base station per +515.00 day Per keypad per day EVENTS- includes Pavilion Events include but are not limited to activities such as car shows, tournaments and activities involving 200 or more people. The Director of Parks and Recreation will make the final determination. General Fee $150.00 Non-profit applications S80.00 Or free with sponsorship* *Applications for joint sponsorship with the City of Spokane Valley will be considered by the Spokane Valley Parks Department. Fee Resolution 06-014 Page 16 of 19 FIELD RENTAL Use Fee $25.00 First hour plus $15 each additional hour INDOOR USE Open gym admission $2.00 Playground program admission (10 entries) $20.00 MIRABEAU Mirabeau Springs Small shelter and waterfall $150.00 Maximum 4 hours Refundable deposit(less than 200 people) $50.00 Mirabeau Meadows Shelter(less than 200 people) $80.00 Shelter(200 or more people) 5150.00 Refundable deposit(less than 200 people) S50.00 Refundable deposit(200 or more people) $250.00 PICNIC SHELTERS Picnic Shelter(less than 200 people) $30.00 Picnic Shelter(200 or more people) $150.00 Refundable deposit (less than 200 people) $50.00 Refundable deposit (200 or more people) S250.00 PROFESSIONAL PHOTOGRAPHY Permit Fee $25.00 Annual RECREATION Recreation program fees are set to recover costs as specified in the Parks and Recreation revenue policy. VALLEY MISSION ARENA Rental* $100.00 Per weekend Refundable deposit $50.00 *Renter responsible for on-site preparation. Rental requires liability insurance. Fee Resolution 06-014 Page 17 of 19 • Schedule E - ADMINISTRATIVE COPY FEES Copy of audio tapes,video tapes, photos, maps or other At cost records needing reproduction Copy of written records $0.15 Per page Copy—Large format $3.00 Per page Copy of full documents At cost OTHER ADMINISTRATIVE FEES NSF Check $25.00 • Fee Resolution 06-014 Page 13 of 19 • Schedule F - OTHER FEES ADULT ENTERTAINMENT FEES Establishment Licenses Live Adult Entertainment $1,500.00 Adult Arcade $1,500.00 Other Adult Entertainment Licenses Adult Arcade Device License $150.00 Manager License $150.00 Entertainer License $150.00 Late License Fee—Charged in addition to license fee. Percent of Past Due Calendar Days License Fee 7—30 25% 31 —60 50% 61 and over 75% BUSINESS REGISTRATION FEES Business registration $13 each year Nonprofit registration $ 3 each year SECURITY FALSE ALARM FEES Repeated malfunctioning security false alarms in a given six-month period. First alarm No charge Second alarm $30.00 Third alarm $70.00 Fourth and subsequent alarms S120.00 STORM WATER UTILITY C.l1.A:RGE ON DEVELOPED PARCEL-S Each single-family unit each year $21 All other properties each S21 Per 3,160 square feet of impervious surface TOW OPERATOR ANNUAL REGISTRATION FEE $100.00 OVERSIZED LOAD PERMIT FEE $25.00 Fee Resolution 06-014 Pace 19 of 19