Loading...
12-100.00 Spokane Rock Products: 2012 Street PreservationSpokane Valley® CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 12- 017 DEPARTMENT OF PUBLIC WORKS PROJECT: 2012 Street Preservation Project - Phase 1 CONTRACT DATE: 6/29/2012 CONTRACTOR: Spokane Rock Products, Inc CHANGE ORDER NO: 3 CAPITAL IMPROVEMENT PROJECT NO: 0160 BID NO.: 12 -017 DESCRIPTION OF CHANGES This Change Order pays to sawcut, remove the existing "bulb" shaped concrete traffic island in Dishman -Mica Road on the south side of the 16th Ave. intersection and to patch HMA over the resulting void. This will allow temporary traffic control to transition during pavement removal and paving operations. The change order also pays for increasing the grind depth 1/4 inch to avoid thin layers of remaining top lift HMA that could delaminate causing potholes in the future. Item No Description Sch C - 35 SAWCUT ACP PAVEMENT Sch C - 36 REMOVE PCC MEDIAN CURB AND ISLAND Sch C - 37 HMA CL 1/2" PG 64 -28, .17FT DEPTH PATCH Sch C - 38 PLANING BITUMINOUS PAVEMENT, 0.25 IN. DEPTH Sch C - 39 HMA CL 1/2" PG 64-28,.025 FT DEPTH Unit Quantity Unit Price Total LF -IN 820 $0.30 $246.00 SY 130 $12.00 $1,560.00 SY 130 $27.00 $3,510.00 SY 42,000 $0.11 $4,620.00 SY 42,000 $0.93 $39.060.00 Total Amount of this Change Order( incl. Tax): $48,996.00 SUBSTANTIAL COMPLETION Original Date: 8/24/2012 Prior to this Change Order: 8/24/2012 Including this Change Order: 8/27/2012 Original Working Days: 25 Working Days Added by this CO: 1 Working Days including this CO: 26 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $ 630,799.53 ............................................................................................................................ ............................... TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 7,739.20 ................................................................................................... ............................... TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ 638,538.73 NET THIS CHANGE ORDER $ 48,996.00 ............................................................................................................................ ............................... TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 687,534.73 CONTRACTOR ACCEPTANCE: The contractor hereby accepts this adjustment under the terms of the original contract for all work perfomed. DATE: -D— /— zz') i RECOMMENDED : /. i APPROVED : � v �i 1 f �� APPROVED BY: DATEAX/1 kanager ATTACHMENTS: COA6SpecificatioA<and Plan Distribution: ORIGINALS TO: Contractor, City of Spokane Valley Clerk's Office, PW Project File COPIES TO: PW Project File P: Public Works /Purchaing /c0 (9/2612007) 2 -02.4 Measurement Add the following: "Remove PCC Median Curb and Island ", shall be measured per square yard; 2 -02.5 Payment Add the following: "Remove PCC Median Curb and Island ", per square yard; shall be full payment for furnishing tools, labor, equipment, and materials required to sawcut, remove, load, haul and dispose of the median curb and island including dowels, fill material and concrete. 2012 St Preservation Project — Phase 1 CO 3 Specifications 16TH AVE PATCH ASPHALT HMA CL 1 /2 "PG 64- 28,.17FT DEPTH 130 SY