Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Resolution 03-055 Amending Six Year Transportation Improvement Program
/ l SpÔkciie Valle Y 11707 E.Sprague Ave. • Suite 106 • Spokane Valley,WA 99206 • (509) 921-1000 • Fax(509)921-1008 • cityhall @spokanevalley.org December 29, 2003 Douglas B.MacDonald Secretary of Transportation State Department of Transportation Mail Stop 47300,Transportation Bldg Olympia, WA 98504-7300 \ RE: City of Spokane Valley Amended Six-Year TIP Dear Mr. MacDonald: • Enclosed for filing,please find a certified copy of City of Spokane Valley Resolution 03-055, amending our Six-Year TIP. Should you need anything further,please feel free to contact me. Sincerely 7,) . __ Christine Bainbridge, CMC City Clerk /cb Enc. cc: Steve Worley, Spokane Valley Sr.Engineer • - RESOLUTION NO. 03-055 CITY OF SPOKANE VALLEY SPOKANE COUNTY,WASHINGTON A RESOLUTION AMENDING THE SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM FOR THE CITY OF SPOKANE VALLEY. WHEREAS, the City Council for Spokane Valley did adopt by Resolution No. 03-037 the Six- Year Transportation Improvement Program (Six-Year TIP) with such program acting ash guide for the coordinated development of the City's transportation system; WHEREAS, changes in certain funding sources have occurred; WHEREAS,the attached amended Six-Year TIP does incorporate said changes; WHEREAS, pursuant to the State Environmental Policy Act, the adoption of the Six-Year TIP is a nonproject action which has received proper and timely environmental review by the City; and WHEREAS, the amendments to the Six-Year TIP are consistent with Spokane Valley's adopted Interim Comprehensive Plan. NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane County, Washington, as follows: The City Council hereby adopts the attached amended Six-Year TIP for the City of Spokane Valley for the purpose of guiding the design, development and construction of local and regional transportation improvements for the years 2004 through 2009. The City Clerk is directed to file the amended Six-Year TIP with the Washington State Secretary of Transportation not more than 30 days after adoption of this Resolution. The amended Six-Year TIP shall, at least, be annually reviewed for the purpose of determining the work accomplished under the program and the City transportation requirements. Adopted this.g.3 day of December,2003. City of Spoke n:1 Iley .,IV rho', Michael DeVleming, Mayor KE4E&'9 eh it Stine Bainbridge, City Clerk Ap*roved as to z •• /, Cary Pi Driskell,Dep. ity Attorney 1 1SV-FSI1UseislcbainbridgelebainbridgelResolutions\resolution 03-55 amending TIP 03-037 draft I.DOC � -- ;00*. Valley City of Spokane Valley Department of Public Works Amended 2004 - 2009 Six Year Transportation Improvement Program 2004 Annual Construction Program GLOSSARY AND ABBREVIATIONS, Functional Classification: Bridge Program Special 14 STP-Surface Transportation Program. Individual funds Rural: Transit Capital Project 21 are designated by the letters in parenthesis that follow 7 Major Collector Transit Operational Project 22 the initials"STP°: 8 Minor Collector (U) Urban improvements Transit Planning 23 (R) Rural improvements 9 Access Transit training/Admin 24 (C) Competitive funding 14 Principal Urban: Non-Capital Improve. 31 (E) Enhancement improvement 16 Minor Non Motor Vehicle 32 (S) Safety improvements 17 Collector 19 Access CO: Box is checked if the project lies within the Carbon State assistance: TPP, AIP, and PSMP are Program Item Number: A number assigned for Monoxide non-attainment area administered by the Transportation Improvement Board. tracking purposes RAP and CAPP are administered by the County Road Administration Board Fund Status: TPP-Transportation Partnership Program Work Method: Project AIP-Arterial Improvement Program S-Pro ect is subject to funding selection p C- Indicates work is to be done by contract P- Project is listed for planning purposes only PSMP: Pedestrian Safety Mobility Program D-Indicates work to be done by City forces. RAP- Rural Arterial Program N- Indicates a non-capital project. CAPP-County Arterial Preservation Program Util Code: Other State-Other state funds Utilities that would be impacted by the project Environmental: C Cable TV S-Significant Impacts under SEPA anticipated G Gas I-Insignificant Environmental Impact anticipated 0 Other P Power Local funding: LID Bonds are sold to finance the S Sewer construction of local roads. This funding is administered _ Work Types: T Telephone by Spokane County. Private funds are paid by private New construction 01 W Water companies or individuals for various reasons, usually for Relocation 02 commercial reasons. LID Bonds- Road Improvement District funding from Major Widening g 04 onde 04 Funding Sources: private property owners. Ma Federal assistance: These funds are authorized under Private-Funds from other private sources. Minor Widening 05 the Transportation Equity Act for the 21"'Century(TEA- Other Enhancements 06 21) and are administered by the Federal Highway New Bridge Const 08 Administration through the Washington State Bridge Replacement 09 Department of Transportation and the Metropolitan Bridge Rehabilitation 10 Planning Organization (SRTC). Minor Bridge Rehab 11 BR- Bridge replacement projects CMAQ-Congestion Management and Air Quality Safety/Traffic Oper/TSM 12 Other Fed-Other federal funds. Environmentally Related 13 iii SUMMARY 2004 ANNUAL STREET CONSTRUCTION PROGRAM The CONSTRUCTION PROGRAM is responsible for the improvement of the City Street System. ANNUAL and SIX YEAR CONSTRUCTION - PROGRAMS are prepared and updated each year. Priority programming is used to select projects for improvement. Funds for the 2004 ANNUAL STREET CONSTRUCTION PROGRAM come from the following sources: Source Amount(1000's) City $960 Federal $2,233 State $2,402 Note: For each CITY dollar spent, a total of $5.89 Other $55 of CONSTRUCTION will be accomplished. Total Construction $5,650 2004 Major Construction Project Summary Project From To Primary Source Amount 1 16th Avenue-Project 2 Dishman Mica Rd SR 27 STP(U) $1,932,000 2 Park Road-Project#2 8th Avenue 2nd Avunue AIP $782,000 3 Evergreen Road 16th Avenue 2nd Avenue AIP $831,000 4 Pines/Mansfield Wilbur Road Pines Road TPP $675,000 Pines& Indiana West bound on ramp to 190 5 Barker Rd Reconstruct-Boone to Spokane Riv Boone Spokane River Bridge AIP $500,000 6 Bowdish&24th Ave. Sidewalk Project 24th Avenue 22nd Avenue PSMP $197,000 Bowdish Road Pines Road 7 Barker Road Bridge @ Spokane River #5503 BR $702,000 SUMMARY 2005 ANNUAL STREET CONSTRUCTION PROGRAM • • The CONSTRUCTION PROGRAM is responsible for the improvement of the City Street System. ANNUAL and SIX YEAR CONSTRUCTION PROGRAMS are prepared and updated each year. Priority programming is used to select projects for improvement. Funds for the 2005 ANNUAL STREET CONSTRUCTION PROGRAM come from the following sources: Source Amount(1000's) City $1,228 Federal $4,534 State $4,294 Note: For each CITY dollar spent, a total of $8.70 Other $623 of CONSTRUCTION will be accomplished. Total Construction $10,679 2005 Major Construction Project Summary Project From To Primary Source Amount 1 Bridging the Valley-Park Road/BNSF Grade Se Indiana Avenue Montgomery Ave. Other State $2,450,000 2 Pines/Mansfield Wilbur Road Pines Road TPP $2,459,000 Pines& Indiana West bound on ramp to 190 3 Park Road Broadway Av Indiana Av AIP $365,000 4 Barker Rd Reconstruct-Boone to Spokane Riv Boone Spokane River Bridge AIP $1,105,000 5 Appleway Road Tschirley Road Hodges Road STP(U) $438,000 6 32nd Avenue SR 27 Best Road STP(U) $213,000 7 Barker Road Bridge @ Spokane River #5503 BR $3,649,000 SUMMARY 2006 ANNUAL STREET CONSTRUCTION PROGRAM • The CONSTRUCTION PROGRAM is responsible for the improvement of the City Street System. ANNUAL and SIX YEAR CONSTRUCTION . PROGRAMS are prepared and updated each year. Priority programming is used to select projects for improvement Funds for the 2006 ANNUAL STREET CONSTRUCTION PROGRAM come from the following sources: Source Amount(1000's) City $2,100 Federal $7,842 State $6,533 Note: For each CITY dollar spent, a total of $8.01 Other $352 of CONSTRUCTION will be accomplished. Total Construction $16,827 2006 Major Construction Project Summary . Project From To Primary Source Amount 1 Bridging the Valley-Park Road/BNSF Grade Se Indiana Avenue Montgomery Ave. Other State $7,046,000 2 Barker Rd Reconstruct-Boone to Spokane Riv Boone Spokane River Bridge AIP $1,393,000 3 Appleway Road Tschirley Road Hodges Road STP(U) $1,876,000 4 Barker Road-Spokane River to SR 290 Spokane River SR 290 STP(U) $418,000 5 Evergreen Road 32nd Avenue 16th Avenue AIP $500,000 6 Park Road Broadway Av Indiana Av AIP $890,000 7 32nd Avenue SR 27 Best Road STP(U) $592,000 ' 8 Sullivan Road West Bridge @ Spokane River #4511-S BR $435,000 9 Barker Road Bridge @ Spokane River #5503 BR $3,649,000 • SUMMARY 2007 ANNUAL STREET CONSTRUCTION PROGRAM The CONSTRUCTION PROGRAM is responsible for the improvement of the City Street System_ ANNUAL and SIX YEAR CONSTRUCTION , PROGRAMS are prepared and updated each year. Priority programming is used to select project for improvement. Funds for the 2007 ANNUAL STREET CONSTRUCTION PROGRAM come from the following sources: Source Amount(1000's) City $2,499 Federal $8,704 State $5,108 Note: For each CITY dollar spent, a total of $6.63 Other $265 of CONSTRUCTION will be accomplished. Total Construction $16,576 2007 Major Construction Project Summary Project From To Primary Source Amount 1 Appleway Road Tschirtey Road Hodges Road STP(U) $2,813,000 2 Barker Road- Spokane River to SR 290 Spokane River SR 290 STP(U) $562,000 3 Evergreen Road 32nd Avenue 16th Avenue AIP $1,120,000 4 Park Road Broadway Av Indiana Av AIP $1,460,000 5 Bridging the Valley-Park Road/BNSF Grade Se Indiana Avenue Montgomery Ave. Other State $5,296,000 6 Barker Road-8th to Broadway Avenue 8th Avenue Broadway Avenue STP(U) $675,000 7 Flora Road Sprague Av Mission Av STP(U) $200,000 8 32nd Avenue SR 27 Best Road STP(U) $667,000 9 Sullivan Road West Bridge @ Spokane River #4511-S BR $3,783,000 • SUMMARY 2008 ANNUAL STREET CONSTRUCTION PROGRAM • The CONSTRUCTION PROGRAM is responsible for the improvement of the City Street System. ANNUAL and SIX YEAR CONSTRUCTION PROGRAMS are prepared and updated each year. Priority programming is used to select projects for improvement. Funds for the 2008 ANNUAL.STREET CONSTRUCTION PROGRAM come from the following sources: Source Amount(1000's) city $1,655 Federal $7,584 State $1,887 Note: For each CITY dollar spent, a total of $6.72 Other so of CONSTRUCTION will be accomplished. Total Construction $11,126 2008 Major Construction Project Summary Project From To Primary Source Amount 1 Evergreen Road 32nd Avenue 16th Avenue AIP $880,000 2 Barker Road-8th to Broadway Avenue 8th Avenue Broadway Avenue STP(U) $1,050,000 3 Barker Road-Spokane River to SR 290 Spokane River SR 290 STP(U) $2,858,000 4 Valley Couplet-Project 3 Evergreen Road Sullivan Road STP(U) $274,000 5 Flora Road Sprague Av Mission Av STP(U) $800,000 6 Valley Couplet-Project 2 University Rd Evergreen Rd TPP $822,000 University Rd Evergreen Rd 7 Bowdish Road 32nd Avenue 8th Avenue AIP $659,000 . 8 Sullivan Road West Bridge @ Spokane River #4511-S BR $3,783,000 • SUMMARY 2009 ANNUAL STREET CONSTRUCTION PROGRAM The CONSTRUCTION PROGRAM is responsible for the improvement of the City Street System. ANNUAL and SIX YEAR CONSTRUCTION PROGRAMS are prepared and updated each year. Priority programming is used to select projects for improvement. Funds for the 2009 ANNUAL STREET CONSTRUCTION PROGRAM come from the following sources: Source Amount(1000's) city $1,079 Federal $4,618 State $1,318 Note: For each CITY dollar spent,a total of $6.50 Other $0 of CONSTRUCTION will be accomplished. Total Construction $7,015 2009 Major Construction Project Summary Project From To Primary Source Amount 1 Valley Couplet-Project 4 Sullivan Road Appleway Road STP(U) $404,000 2 Valley Couplet-Project 2 University Rd Evergreen Rd TPP $822,000 University Rd Evergreen Rd 3 Valley Couplet-Project 3 Evergreen Road Sullivan Road STP(U) $1,095,000 4 Flora Road Sprague Av Mission Av STP(U) $1,500,000 5 Bowdish Road 32nd Avenue 8th Avenue AIP $1,048,000 6 Barker Road-8th to Broadway Avenue 8th Avenue Broadway Avenue STP(U) $2,003,000 • City of Spokane Valley Bearing Date: Adoption Date: . Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2004 Annual Construction Program Dollars in thousands • Project Name Road Names Program Func Work Scope Envir Work C Fund Work Utilities Fed State Other City Item Class Status From To Road# Proj# Len(m) Type O Stet Meth Fund Source Funds Funds Funds Funds P.E. R.W. Const Total _ Urban Construction 1 16th Avenue-Project 2 2875 I 03 r2 S 14 16th Ave Dishman Mica Rd SR 27 05122 1.60 C City 260 0 0 260 260 C STP(U) 1,672 0 0 1,672 1,672 Reconstruct as a three-lane arterial with curbs and sidewalks with accomodations for 0 0 1,932 1,932 bicycles. Construction 2 Park Road-Project#2 2951 I 04 U S TCGPWS _ 16 Park Road 8th Avenue 2nd Avunue 03714 0.38 C City 156 0 0 156 156 C AIP 626 0 0 626 626 - Reconstrud and widen existing roadway to a 3-lane section with a 4'bike lane_ Curbs, 0 0 782 782 gutters and a 6 foot sidewalk will also be a part of the project from 8th Ave..to Appleway Construction 3 Evergreen Road 2903 I 03 Nil S 14 Evergreen Road 16th Avenue 2nd Avenue 01170 0.90 C City 166 0 0 166 166 C AIP 665 0 0 665 665 Reconstruct and widen to three lanes to 8th Avenue,five lanes from 8th Ave.to 2nd Ave. 0 0 831 831 Construction 4 Pines/Mansfield I 03 U P 09 Mansfield Ave Wilbur Road Pines Road 02964 0.00 , 14 Pines Rd Pines&Indiana West bound on ramp 0.00 C City 55 30 25 0 55 C TPP 565 189 376 0 565 C Other 55 51 4 0 55 This project will reconfigure the WB ramps of 1-90 at SR27. It will also widen and 270 405 0 675 reconstruct Mansfield Ave.from Wilbur Rd.to SR27 to a 3-lane roadway with curb,gutter Prelim.Engineering,Right-of-Way Printed: 12/16/2003 1 City of Spokane Valley Hearing Date: Adoption Date: • • Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2004 Annual Construction Program Dollars in thousands Project Name Road Names Program Func Work Scope Envir Work c Fund Work Utilities Fed State Other City Item Class Status From To Road# Proj I-en(mi) Type O Stat Meth Fund Source Funds Funds Funds Funds P.E. R.W. Const Total 5 Barker Rd Reconstruct-Boone to Spokane River I 03 0 S 14 Barker Road Boone Spokane River Bridg 00230 0.69 C City 100 38 62 0 100 C AIP 400 152 248 0 400 Reconstruct to a four-lane curbed arterial with center turn lane, 190 310 0 500 Prelim.Engineering,Right-of-Way 6 Bums Road Sewer Paveback I 03 IA S 19 Bums Rd End Pvmt/Start Gravel Mission Avenue 00378 0.04 C City 31 11 0 20 31 Pave existing gravel road after sewer construction to 20'wide. 11 0 20 31 Prelim.Engineering,Construction 7 Bowdish&24t11 Ave.Sidewalk Project 03-003 I 01 V S TCG 16 Bowdish Rd 24th Avenue 22nd Avenue 00297 0.12 ' 17 24th Avenue Bowdish Road Pines Road 05949 0.52 C City 51 5 0 46 51 C PSMP - 145 15 0 131 146 Construct curb,gutter and 6'sidewalk along Bowdish and 24th Avenue 20 0 177 197 Prelim.Engineering,Construction Urban Construction Projects Total: 1,672 2,402 55 819 491 715 3,742 4,948 Printed: 12/162003 2 . City of Spokane Valley Hearing Date: Adoption Date: • Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2004 Annual Construction Program Dollars in thousands Projed Name Road Names Program Func Work Scope Envir Work C Fund Work Utilities Fed State Other City Item Class Status From To Road# Pro Len(mi) Type yP O Stat Meth Fund Source Funds Funds Funds Funds P.E. R.W. Const Total Bridge Construction • 8 Barker Road Bridge I 09 ❑ S T 14 Barker Road ©Spokane River #5503 0.10 C City 141 132 9 0 141 C BR 561 525 36 0 561 Replace bridge over the Spokane River. 657 45 0 702 Prelim. Engineering,Right-of-Way Bridge Construction Projects Total: 561 141 657 45 0 702 Total Program for 2004 2,233 2,402 55 960 1,148 760 3,742 5,650 Printed: 12116/2003 3 City of Spokane Valley Hearing Date: Adoption Date: Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2005 Annual Construction Program Dollars in thousands Project Name Road Names Program Func Work Scope Envir Work C Fund Work Utilities Fed State Other City Item Class Status From To Road# Proj# Len(mi) Type O Stat Meth Fund Source Funds Funds Funds Funds P.E. R.W. Const Total Urban Construction 1 Bridging the Valley-Park Road!BNSF Grade Sep I 03 © S 14 Park Road Indiana Avenue Montgomery Ave. 03714 0.20 C City 115 49 66 0 115 C TPP 651 283 378 0 661 C Other Fed 62 27 35 0 62 C STP(U) 661 283 378 0 661 C. Other Sta 828 355 473 0 828 C Other 123 53 70 0 123 • Reconstruct Park Road to separate the grades of Park Road and the BNSF railroad 1,050 1,400 0 2,450 tracks. Prelim.Engineering.Right-of-Way 2 Pines/Mansfield I 03 Ij P 09 Mansfield Ave Wilbur Road Pines Road 02964 0.00 14 Pines Rd Pines&Indiana West bound on ramp 0.00 C TPP 1,629 0 0 1,629 1,629 C STP(U) 330 0 0 330 330 C Other Sta 0 0 0 0 0 C Other 500 0 0 500 500 This project will reconfigure the WB ramps of 1-90 at SR27. It will also widen and 0 0 2,459 2,459 reconstruct Mansfield Ave.from Wilbur Rd.to SR27 to a 3-lane roadway with curb.gutter Construction 3 Park Road I 03 ►°l P 14 Park Rd Broadway Av Indiana Av 03714 0.75 C City 73 28 45 0 73 C AIP 292 112 180 0 292 Reconstruct and widen to five lanes 140 225 0 365 Printed: 12/16/2003 4 - City of Spokane Valley Hearing Date: Adoption Date: Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2005 Annual Construction Program Dollars in thousands Project Name Road Names Program Func Work Scope Envir Work C Fund Work Utilities Fed State Other City , Item Class Status From To Road# Proj# Len(mi) Type O Stet Meth Funds Funds Funds Funds P.E. R.W. Const Total ',._ Fund Source 4 Barker Rd Reconstruct-Boone to Spokane River I 03 0 S 14 Barker Road Boone Spokane River Bridg 00230 0.69 C City 221 0 128 93 221 C AIP 884 0 512 372 884 Reconstruct to a four-lane curbed arterial with center turn lane. 0 640 465 1,105 Right-of-Way,Construction 5 Appleway Road S 03 U P CPT 14 Appleway Road Tschirley Road Hodges Road 00031 1.26 C City 60 26 34 0 60 • C STP(U) 378 162 216 0 378 Reconstruct to a five lane urban arterial 188 250 0 438 - Preliminary Engineering 6 32nd Avenue I 03 U P CGPTW 14 32nd Avenue SR 27 Best Road 05971 0.48 C City 29 9 20 0 29 C STP(U) 184 57 127 0 184 Reconstruct and widen to three lanes with curbs and sidewalks. 66 147 0 213 Prelim.Engineering,Right-of-Way ..- Urban Construction Projects Total: 1,615 4,294 623 498 1,444 2,662 2,924 7,030 Printed: 12/1612003 5 City of Spokane Valley Hearing Date: Adoption Date: • Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2005 Annual Construction Program Dollars in thousands Project Name Road Names Program Func Work Scope Envir Work C Fund Work Utilities Fed State Other City • Item Class Status From To Road# Pro'# Len(mi) Type YP O Stat Meth Fund Source Funds Funds Funds Funds P.E. R.W. Const Total Bridge Construction 7 Barker Road Bridge I 09 El S T 14 Barker Road @ Spokane River #5503 0.10 C City 730 0 0 730 730• C BR 2,919 0 0 2,919 2,919 Replace bridge over the Spokane River. 0 0 3.649 3,649 Construction Bridge Construction Projects Total: 2,919 730 0 0 3,649 3,649 Total Program for 2005 4,534 4,294 623 1,228 1,444 2,662 6,573 10,679 Printed: 12/1612003 6 City of Spokane Valley Hearing Date: Adoption Date: Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2006 Annual Construction Program Dollars in thousands Project Name Road Names Program Func Work Scope Envir Work C Fund Work Utilities Fed State Other City Item Class Status From To Road# Proj# I en(mi) Type O Stat Meth Fund Source Funds Funds Funds Funds P.E. R.W. Const Total Urban Construction 1 Bridging the Valley-Park Road/BNSF Grade Sep I 03 iv S 14 Park Road Indiana Avenue Montgomery Ave. 03714 0.20 C City 331 16 66 249 331 C TPP 1,903 95 378 1,430 1,903 C STP(U) 1,903 95 378 1,430 1,903 C Other Fed 176 9 35 132 176 C Other Sta 2,381 118 473 1,790 2,381 C Other 352 17 70 265 352 Reconstruct Park Road to separate the grades of Park Road and the BNSF railroad 350 1,400 5,296 7,046 tracks. Prelim. Engineering,Right-of-Way,Construction 2 Barker Rd Reconstruct-Boone to Spokane River I 03 U S 14 Barker Road Boone Spokane River Bridg 00230 0.69 C City 279 0 0 279 279 C AIP 1,114 0 0 1,114 1,114 Reconstruct to a four-lane curbed arterial with center turn lane. 0 0 1,393 1,393 Construction • . 3 Appleway Road S 03 P CPT 14 Appleway Road Tschirley Road Hodges Road 00031 1.26 C City 254 26 101 127 254 C STP(U) 1,622 162 649 811 1,622 Reconstruct to a five-lane urban arterial 188 750 938 1,876 Right-of-way Printed: 12/1612003 7 City of Spokane Valley Hearing Date: Adoption Date: _ Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2006 Annual Construction Program Dollars in thousands Project Name Road Names Program Func Work Scope Envir Work C Fund Work Utilities Fed State Other City • Item Class Status From To Road# Pro'# Len(mi) Type( ) YP O Stat Meth Fund Souroe Funds Funds Funds Funds P.E. R.W. Const Total 4 Barker Road-Spokane River to SR 290 I 03 ❑ P 14 Barker Road Spokane River SR 290 00230 1.51 C City 56 31 25 0 56 C STP(U) 362 199 163 0 362 Reconstruct to a three-lane curbed arterial 230 188 0 418 Prelim_Engineering,Right-of-Way 5 Evergreen Road I 03 1 P 14 Evergreen Rd 32nd Avenue 16th Avenue 01170 1.00 C City 100 40 60 0 100 C AIP 400 160 240 0 400 Reconstruct and widen to three lanes 200 300 0 500 • - Preliminary Engineering 6 Flora Rd/5R290 Minor Intersection Improvements I 12 U P 16 Flora Rd SR290 SR290 01345 0.00 C City 2 1 0 1 2 C Other Sta 11 1 0 10 11 Construct raised curb channelization on SR290 to eliminate NBL&SBL movements 2 0 11 13 Prelim.Engineering,Construction 7 Park Road I 03 Ij P 14 Park Rd Broadway Av Indiana Av 03714 0.75 C City 178 0 105 73 178 • C AIP 712 0 420 292 712 Reconstruct and widen to five lanes 0 525 365 890 • Printed: 12/16/2003 8 City of Spokane Valley Hearing Date: Adoption Date: Env.Assess. Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2006 Annual Construction Program Dollars in thousands Project Name Road Names Program Func Work Scope Item Class Status Envir Work C Fund Work Utilities Fed State Other City j From To Road# Proj# Len(mi) Type O Stat Meth Fund Source Funds Funds Funds Funds P.E. R.W. Const Total 8 Barker/SR290 Minor Intersection Improvement I 12 CI P 14 Barker Rd SR290 SR290 00230 0.00 C City 3 1 0 2 3 C Other Sta 12 2 0 10 12 Construct raised curb channelization to eliminate WBL movement and provide NBL 3 0 12 15 acceleration lane on SR290 Prelim.Engineering,Construction 9 32nd Avenue I 03 U P CGPTW 14 32nd Avenue SR 27 Best Road 05971 0.48 C City 80 0 20 60 80 ' C STP(U) 512 0 127 385 512 Reconstruct and widen to three lanes with curbs and sidewalks. 0 147 445 592 Right-of-Way,Construction Urban Construction Projects Total: 4,575 6,533 352 1,283 973 3,310 8,460 12,743 Printed: 12/16/2003 9 City of Spokane Valley Hearing Date: Adoption Date: Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2006 Annual Construction Program Dollars in thousands Project Name Road Names Program Func Work Scope Envir Work C Fund Work Utilities Fed State Other City Item Class Status From To Road# Proj# Len(mi) Type O Stet Meth Fund Source Funds Funds Funds Funds P.E. R.W. Const Total Bridge Construction 10 Sullivan Road West Bridge I 03 g P 14 Sullivan Road @ Spokane River #4511-S 04597 0.22 C City 87 80 7 0 87 C BR 348 320 28 0 348 Reconstruct and widen west bridge 400 35 0 435 Prelim.Engineering,Right-of-Way 11 Barker Road Bridge I 09 Li S T • 14 Barker Road @ Spokane River 05503 0.10 C City 730 0 0 730 730 C BR 2,919 0 0 2,919 2,919 Replace bridge over the Spokane River. 0 0 3,649 3,649 Construction Bridge Construction Projects Total: 3,267 817 400 35 3,649 4,084 - Total Program for 2006 7,842 6,533 352 2,100 1,373 3,345 12,109 16,627 Printed: 12/16/2003 10 City of Spokane Valley Hearing Date: Adoption Date: Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2007 Annual Construction Program Dollars in thousands Project Name Road Names Program Func Work Scope • Envir Work C Fund Work Utilities Fed State Other City Item Class Status From To Road# Proj# Len(mi) Type o Stat Math Fund Source Funds Funds Funds Funds P.E. R.W. Const Total �,_,/ Urban Construction 1 Apploway Road S 03 2 P CPT _ 14 Appleway Road Tschirtey Road Hodges Road 00031 126 C City 380 0 0 380 380 C STP(U) 2,433 0 0 2,433 2,433 Reconstruct to a five-lane urban arterial 0 0 2,813 2,813 Construction 2 Barker Road-Spokane River to SR 290 I 03 Li p . 14 Barker Road Spokane River SR 290 00230 1.51 C City 76 0 76 0 76 C STP(U) 486 0 486 0 486 Reconstruct to a three-lane curbed arterial 0 562 0 562 Right-of-Way 3 Evergreen Road I 03 L P 14 Evergreen Rd 32nd Avenue 16th Avenue 01170 1.00 • C City 220 0 0 220 220 C City 180 0 180 0 180 C . AM 720 0 720 0 720 Reconstruct and widen to three lanes 0 900 220 1,120 Construction , 4 Park Road I 03 ,A P �, 14 Park Rd Broadway Av Indiana Av 03714 0.75 C City 292 0 0 292 292 C AIP 1.168 0 0 1,168 1,168 Reconstruct and widen to five lanes 0 0 1,460 1,460 Printed: 12/16/2003 11 City of Spokane Valley Hearing Date: Adoption Date: • Env,Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2007 Annual Construction Program Dollars in thousands Project Name Road Names Program Func Work Scope Envir Work C Fund Work Utilities Fed State Other City Item Class Status From To Road# t Proj# Len(mi) Type O Stet Meth Fund Source Funds Funds Funds Funds P.E. R.W. Coast Total 5 Bridging the Valley-Park Road/BNSF Grade Sep I 03 2 S 14 Park Road Indiana Avenue Montgomery Ave. 03714 0.20 C City 249 0 0 249 249 C TPP 1,430 0 0 1,430 1,430 C STP(U) 1,430 0 0 1,430 1,430 C Other Fed 132 0 0 132 132 C Other Sta 1,790 0 0 1,790 1,790 C Other 265 0 0 265 265 Reconstruct Park Road to separate the grades of Park Road and the BNSF railroad 0 0 5,296 5,296 tracks. Construction 6 Barker Road-8th to Broadway Avenue I 02 J S CGPT 16 Barker Road 8th Avenue Broadway Avenue 00230 1.03 - 0 C City 228 3.8 190 0 228 C STP(U) 447 144 303 0 447 Reconstruct to a three-lane urban arterial from 8th to Appleway. Reconstruct to a four- 182 493 0 675 lane arterial with center turn lane from Appleway to Broadway Ave. Prelim. Engineering,Right-of-Way 7 Flora Road I 03 :J P 14 Flora Rd Sprague Av Mission Av 01344 1.00 C City 27 27 0 0 27 C STP(U) 173 173 0 0 173 Reconstruct to a three-lane arterial. 200 0 0 200 8 32nd Avenue I 03 I P CGPTW • 14 32nd Avenue SR 27 Best Road 05971 0.48 C City 90 0 0 90 90 C STP(U) 577 0 0 577 577 Reconstruct and widen to three lanes with curbs and sidewalks. 0 0 667 667 Construction Printed: 12/16/2003 12 City of Spokane Valley Hearing Date: Adoption Date: Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2007 Annual Construction Program Dollars in thousands - Project Name Road Names Program Func Work Scope Envir Work C Fund Work Utilities Fed State Other City Item Class Status From To Road# Proj# Len(mi) Type O Stat Meth Fund Source Funds Funds Funds Funds P.E. R.W. Const Total Urban Construction Projects Total: 5,678 5,108 265 1,742 382 1,955 10,456 12,793 Bridge Construction 9 Sullivan Road West Bridge I 03 gi P 14 Sullivan Road ©Spokane River #4511-S 04597 0.22 C City 757 0 0 757 757 C BR 3,026 0 0 3,026 3,026 Reconstruct and widen west bridge 0 0 3,783 3,783 Construction Bridge Construction Projects Total: 3,026 757 0 0 3,783 3,783 Total Program for 2007 8,704 5,108 265 2,499 382 1,955 14,239 16,576 Printed: 12/162003 13 City of Spokane Valley Hearing Date: Adoption Date: Env.Assess. Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2008 Annual Construction Program Dollars in thousands Project Name Road Names Envir Work Program Func Work Scope C Fund Work Utilities Fed State Other City Item Class Status From To Road# Proj# Len(mi) Type 0 Stat Meth Fund Source Funds Funds Funds Funds P.E. R.W. Const Total Urban Construction 1 Evergreen Road I 03 d P 14 Evergreen Rd 32nd Avenue 16th Avenue 01170 1.00 C AIP 880 0 0 880 880 Reconstruct and widen to three lanes 0 0 880 880 2 Barker Road-8th to Broadway Avenue I 02 v S CGPT 16 Barker Road 8th Avenue Broadway Avenue 00230 1.03 C City 142 0 142 0 142 C STP(U) 908 0 908 0 908 Reconstruct to a three-lane urban arterial from 8th to Appleway. Reconstruct to a four- 0 1,050 0 1,050 lane arterial with center turn lane from Appleway to Broadway Ave. Right-of-Way 3 Barker Road-Spokane River to SR 290 I 03 U P 14 Barker Road Spokane River SR 290 00230 1.51 C City 386 0 0 386 386 C STP(U) 2,472 0 0 2,472 2,472 Reconstruct to a three-lane curbed arterial 0 0 2,858 2,858 Construction 4 Valley Couplet-Project 3 2797 S 01 U S CGPTW 14 Valley Couplet Evergreen Road Sullivan Road 08000 1.02 i C City 80 30 50 0 80 C STP(U) 194 194 0 0 194 Construct multi-lane facility with curbs and sidewalks. Remove islands on Sprague 224 50 0 274 Avenue and restripe. Right-of-Way Printed: 12/16/2003 14 • City of Spokane Valley Hearing Date: Adoption Date: Env.Assess.Date Resotution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2008 Annual Construction Program Dollars in thousands Project Name Road Names Program Func Work Scope Envir Work C Fund Work Utilities Fed State Other City Item Class Status From To Road# Proj# Len(mi) Type 0 Stet Meth Fund Source Funds Funds Funds Funds P.E. R.W. Const Total J 5 Flora Road I 03 I] P 14 Flora Rd Sprague Av Mission Av 01344 1.00 C City 108 0 108 0 108 C STP(U) 692 0 692 0 692 Reconstruct to a three-lane arterial. 0 800 0 800 6 Valley Couplet-Project 2 2883 S 01 IA S 14 Sprague Ave University Rd Evergreen Rd 04538 2.02 14 2nd Avenue University Rd Evergreen Rd 00001 2.02 C City 50 12 38 0 50 C TPP 480 120 360 0 480 • C STP(U) 292 69 223 0 292 - Construct multi-lane facility with curbs and sidewalks. Remove islands on Sprague Avenue and restripe. 201 621 0 822 Prelim.Engineering,Right-of-Way 7 Bowdish Road I 03 U P CGPTW 14 Bowdish Road 32nd Avenue 8th Avenue 00297 1.52 C City 132 32 100 0 132 C AIP 527 127 400 0 527 Reconstruct and widen roadway to three lanes. 159 500 0 659 Preliminary Engineering Urban Construction Projects Total: 4,558 1,887 898 584 3,021 3,738 7,343 J Printed: 12/16/2003 15 City of Spokane Valley Hearing Date: Adoption Date: Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2008 Annual Construction Program Dollars in thousands Project Name Road Names Program Func Work Scope Envir Work C Fund Work Utilities Fed State Other City Item Class Status From To Road# P # Len(mi) T e roj YP O Stat Meth Fund Source Funds Funds Funds Funds P.E. R.W. Const Total Bridge Construction 8 Sullivan Road West Bridge I 03 Ln P 14 Sullivan Road @ Spokane River #4511-S 04597 0.22 C City 757 0 0 757 757 C BR 3,026 0 0 3,026 3,026 Reconstruct and widen west bridge 0 0 3,783 3,783 Bridge Construction Projects Total: 3,026 757 0 0 3,783 3,783 Total Program for 2008 7,584 1,887 1,655 584 3,021 7,521 11,126 Printed: 12/16/2003 16 City of Spokane Valley Hearing Date: Adoption Date: Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2009 Annual Construction Program Dollars in thousands Project Name Road Names' Program Func Work Scope Envir Work C Fund Work Utilities Fed State Other City I Item Class Status From To Road# Proj# Len(mi) Type o Stat Meth Funds Funds Funds Funds P.E. R.W. Const Total J Fund Source Urban Construction 1 Valley Couplet-Project 4 S 01 2 P CGPTW _. 14 Valley Couplet Sullivan Road Appleway Road 08000 1.19 C City 54 37 17 0 54 C STP(U) 350 242 108 0 350 Construct four lanes with curbs and sidewalks. Remove islands on Sprague Avenue and 279 125 0 404 restripe. Preliminary Engineering 2 Valley Couplet-Project 2 2883 S 01 U S - 14 Sprague Ave University Rd Evergreen Rd 04538 2.02 14 2nd Avenue University Rd Evergreen Rd 00001 2.02 C City 50 12 38 0 50 C TPP 480 120 360 0 480 C STP(U) 292 69 223 0 292 Construct multi-lane facility with curbs and sidewalks. Remove islands on Sprague 201 621 0 822 Avenue and restripe. Prelim.Engineering,Right-of-Way 3 Sullivan Road I 03 l) P 14 Sullivan Road Euclid Avenue Wellesley Avenue 04597 1.00 C City 93 93 0 0 93 Reconstruct to a seven-lane urban arterial.Widen bridges at Spokane River, UPRR, 93 0 0 93 BNRR,and SR 290 Prelim. Engineering 4 Valley Couplet-Project 3 2797 S 01 J S CGPTW ■ 14 Valley Couplet Evergreen Road Sullivan Road 08000 1.02 C City 148 0 61 87 148 C STP(U) 947 0 390 557 947 Construct multi-lane facility with curbs and sidewalks. Remove islands on Sprague 0 451 644 1,095 Avenue and restripe. Complete construction Printed: 12!16/2003 17 City of Spokane Valley Hearing Date: Adoption Date: • Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2009 Annual Construction Program Dollars in thousands Probed Name Road Names Program Func Work Scope Envir Work C Fund Wark Utilities Fed State Other City mi { ) Type Item Class Status From To Road# Proj# Len T e Funds Funds Funds Funds P.E. R.W. Const Total 0 Stat Meth Fund Source 5 Flora Road I 03 © P 14 Flora Rd Sprague Av Mission Av 01344 1.00 C City 203 0 0 203 203 C STP(U) 1,297 0 0 1,297 1,297 Reconstruct to a three-lane arterial. 0 0 1,500 1,500 6 Euclid Rd/Flora Rd I 03 :..‘d P 17 Euclid Av Flora Road Barker Road 01166 0.97 16 Flora Rd Euclid Road Euclid Road 01345 0.14 C City 50 50 0 0 50 Reconstruct to provide a two lane,shouldered arterial 50 0 0 50 Prelim. Engineering 7 Bowdish Road I 03 L.I P CGPTW 14 Bowdish Road 32nd Avenue 8th Avenue 00297 1.52 C City 210 0 100 110 210 C AIP 838 0 400 438 838 Reconstruct and widen roadway to three lanes, 0 500 548 1,048 Right-of-Way • 8 Barker Road-8th to Broadway Avenue I 02 P 1 S CGPT 16 Barker Road 8th Avenue Broadway Avenue 00230 1.03 C City 271 0 0 271 271 C STP(U) 1,732 0 0 1,732 1,732 Reconstruct to a three-lane urban arterial from 8th to Appleway. Reconstruct to a four- 0 0 2.003 2,003 lane arterial with center turn lane from Appleway to Broadway Ave. Construction Printed: 12/1612003 18 • City of Spokane Valley Hearing Date: Adoption Date: Env.Assess.Date Resolution No. Department of Public Works 2004 - 2009 Six Year Transportation Improvement Program 2009 Annual Construction Program Dollars in thousands Project Name Road Names Program Func Work Scope Envir Work C Fund Work Utilities Fed State Other City 7 i Item Class Status From To Road# Proj Len(m) Type O Stat Meth Fund Source Funds Funds Funds Funds P.E. RAN. Const Total _ Urban Construction Projects Total: 4,618 1,318 1,079 623 1,697 4,695 7,015 Total Program for 2009 4,618 1,318 1,079 623 1,697 4,695 7,015 Printed: 12/16/2003 19