Loading...
Resolution 03-021A2 Amending Master Fee Schedule CITY OF SPOKANE VALLEY SPOKANE COUNTY, WASHINGTON RESOLUTION NO. 03-021-A-2 A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY, WASHINGTON, APPROVING A SECOND AMENDMENT TO THE MASTER FEE SCHEDULE OF THE CITY. WHEREAS, the Spokane Valley City Council adopted Resolution No. 03-02 on March 6, 2003 and amended the same through Resolution 03-021-A-1 on April 1, 2003; WHEREAS, it is the general policy of the City to establish permit fees that are reflective of the cost of services provided by the City; and WHEREAS, it is necessary to amend Resolution 03-021 in order to modify the City Fee Schedule. NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane County, Washington, as follows: Section 1. Fee Schedule. For the purpose of setting fees for services and permits within the City, the City Council hereby adopts the Master Fee Schedule(s) which is attached hereto as Exhibit"A-1", Exhibit "A-2", and Exhibit "l3" as if fully set forth herein. Section 2. Repeal. To the extent that previous fee schedules are inconsistent with those set forth herein, they are repealed. Section 3. Effective Date. This Resolution shall be in full force and effective upon adoption. Adopted this ay of May 2003. City of S.okane alley I • Mayor Michael DeVI- ing A .. Interim 1ty Clerk, Ruth Muller Approve as to Form: f et' City .o y, St.anle- M. Schwartz S:IResolutions1Resolution No.03-021 A-2,fee schedule amend_doc { City of SPOKANE VALLEY E<YBTBIT A-1 FOR RESOLUTION 03-021 MASTER FEE SCHEDULE FOR BUILDING& FIRE CODES, AND DEPARTMENTS OF PUBLIC WORKS, PLANNING, PARKS AND RECREATION,ATION, AND ADMINISTRATION. Fees for permits and services will be set by this resolution for the City of Spokane Valley All fees are to be collected and listed on the finance department receipt under the proper BARS code number so that each fee can be accounted for. ***:************************************3r*****- **********************— BUILDING CODE • *********************************************I t*********************** 1. Building Permit fees for each project is set by the following fee schedule and item 2 below. TOTAL VALUATION FEE $1 to $500 $23.50 $501 to $2,000 $23.50 for the first $500 plus $3.05 for each additional $100, or fraction thereof, to.and . including $2,000 $2,001 to $25,000 $69.25 for the first$2,000 plus $14 for each additional $1,000, or fraction thereof, to and including$25,000 . $25,001 to S50,000 $391.25 for the first S25,000 plus $10.10 for each additional $1,000, or fraction thereof, to and including $50,000 $50,001 to $100,000. $643.75 for the first$50,000 plus $7 for each additional $1,000, or fraction thereof, to and • includin• $100,000 $100,001 to $500,000 $993.75 for the first$100,000 plus $5.60 for each additional $1,000, or fraction thereof, to and including$500,000 $500,001 to $1,000,000 $3,233.75 for the first$500,000 plus $4.75 for each additional $1,000, or fraction thereof, to and including $1,000,000 $1,000,000 and up $5,608.75 for the first$1,000,000 plus $3.15 • for each additional $1,000, or fraction.thereof 't FEE EXHIBIT A-1 revised 5-22-03 1030 hours 1 • 2. The above table is to be used to determine the building permit fees and plans check fees based on the I. B. C. O. Valuation Modifier for this part of the country. THIS MODIFIER FIGURE IS FOR SETTING FEES ONLY AND NOT TO DETERMINE THE EXACT VALUE OF THE BUILDING. This modifier is revised and published every April.by the International Conference of Building Officials and used by the City. The modifier of 1.0 is to be used. The WSBCC fee will apply, and is not refundable. .Except: The categories listed below in the.ICRO valuation modifier are changed to read as follows: a. Private garages (Wood frame) $19.00 sq.ft. b. Private garages (Masonry) $22.00 sq.ft. c. Pole.Buildings $19.00 sq.ft. d. Open carport, decks,porches $15.00 sq.ft Sheds under 200 square feet $45.00. Apartment Houses and dwellings in the ICBO valuation modifier will use the AVERAGE cost per square foot. Minimum basic building permit fee $35.00 3. PLANS REVIEW FEES are to be collected at the time of receiving th.e application for permit if the plans review fee is over$50.00. if the plans review fee is under$50.00 it can be collected at the time of permit issuance. This fee is to be 65% of the cost of the basic building permit fee as set by the Building Code and the City of Spokane Valley for all building occupancies except Group R-3 and Group U. Plans review fees are not refimdable, except under certain conditions set by the Building Official. (See Operating Policy#29 and Section 107.3 of the U.B.C.) This fee is in addition to the full basic fee. The WSBCC fee is to be collected at this time. If a set of plans already checked and approved is resubmitted by the owner or his J her agent, an hourly rate of$47.00 will be applied for the re-review. Other plans review fees are as follows: Group R-3 Occupancies (single family under 7,999 sq.ft.) 40% of permit fee Group R-3 Occupancies (over 8,000 sq. ft.) 65% of permit fee Group U-1 and U-2 Occupancies (sheds—barns- etc) 25% of permit fee Temporary tent or structure 25% of permit fee 4. THE BUILDING CODE FEES are collected at the time of the issuance of the building permit. Other fees are also to be collected at the time of the issuing of the building permit. (i.e.; fire department fees not already collected, plumbing and mechanical code fees, planning fees, public works fees, and fees in lieu, etc.) Each department for whom the fee is collected is to advise the permit specialist of fees due. ADDITIONAL PLANS CHECK FEES MAY BE ASSESSED IF CONSIDERABLE CHANGES OR REVISIONS NEED TO BE MADE IN THE P.LANNS .PRIOR TO APPROVAL FEE EXHIBTT A-1 wised 5-22-03 1030 hours 2 5. Early Start Agreements (Foundations) 25% of Building Permit Fee 6. Temporary Certificate of Occupancy $ 50.00 7. Fast Track Permits Not Allowed 8. Hourly rate set for City Employees $ 47.00 SIGN FEES 1. Fees collected for a sign permit and a plans check fee for signs erected in accordance with the Uniform Sign Code. The below fee plus the WSBCC fee of $4.50. Signs mounted on buildings $45.00 Sign and pole mounting $65.00 PLUMBING CODE The fees outlined below are to be collected at the time of issuing a plumbing permit. If the plumbing is included in the Building Permit the unit costs are to he added but not the basic permit fee. A. Basic fee for issuing each permit $ 35.00 Basic for each supplemental permit $ 7.50 B. Unit fees (in addition to the basic fee) 1. For each plumbing fixture on a trap ( including garbage disposals, dish washers, back flow device, drainage, hot tubs, built in water softener, water closets, lavatories, sinks, drains, etc) $ 6.00 2. Private sewage disposal system $ 20.00 • 3. Water heater, each $ 6.00 4. Industrial waste pretreatment interceptor including its trap and vent, except kitchen type grease interceptors functioning as fixture traps. $ 15.00 5. Repair or alteration of water piping, drainage or vent piping, each fixture $ 6.00 6. Lawn sprinkler system on any one meter • including baekflow protection devices, each $ 25.00 7. For atmospheric type vacuum breaker each $ 6.00 8. Backflow protective device other than atmospheric type vacuum breakers, each $ 6.00 9. Medical. Gas, per. outlet $ 6.00 10. Interceptors, each $ 6.00 MECHANICAL CODE The fees outlined below will be used and collected at the time of issuing a mechanical permit. if the mechanical is included in the Building Permit the unit costs are to be added but not the basic permit fee. • FEE EXHIBIT A-1 revised 5-22-03 1030 hours 3 • A. Basic Fee for issuing a permit • $ 35.00 Basic fee for each supplemental permit $ 7.50 B. Unit fee (in addition to the basic fee)Refer to the Uniform Mechanical fee list (Table 1-A.) for explanation of each Category. Furnaces & suspended heaters - Installation or relocation up to and including 100,000 btu $ 12.00 over 100,000 btu $ 15.00 Duct work system S 10.00 Heat pump & air conditioner-0 to 3 tons S 12.00 3 to 15 tons $ 20.00 over 15 to 30 tons $ 25.00 over 30 to 50 tons $ 35.00 • over 50 tons $ 60.00 Gas water heater $ 10.00 Gas piping system Each outlet $ 1.00 Gas log, fireplace, and gas insert installation $ 10.00 Appliance vents installation- relocation- Replacement $ 10.00 each Repairs or Additions-of appliance controlled by the UMC. $ 1 5.00 Boilers, Compressors, and Absorption systems 3 hp- 100,000 btu or less $ -12.00 • 3 to 15 hp- 100.000 to 500,000 btu $ 20.00 • 15 -30 hp- 500,000 to 1,000,000 btu $ 25.00 over 30 lip- 1,000,000 to 1,750,000 btu $ 35.00 over 50 hp-over 1,750,000 btu $ 60.00 Air Handlers Each unit up to 10,000 cfin, including ducts See UMC for exception S 12.00 Each unit over 10,000 cfni S 15.00 Evaporative Coolers (other than portable) $ 10.00 Ventilation and exhaust Each fan connected to a single duct $ 10.00 Each ventilation system $ 12.00 Each hood served by mechanical exhaust $ 12.00 Incinerators Installation or relocation of residential $ 19.00 Installation or relocation of commercial $ 22.00 Appliances, each $ 10.00 Unlisted appliances under 400,000 btu $ 50.00 Over 400,000 btu $100.00 Hood; type I $ 50.00 Type II S 10.00 • FEE EXHIBir A-1 revised 5-22-03 1030 hours 4 I L P Storage tank $ 10.00 Wood or Pellet stove insert $ 1.0.00 Wood stove system— free standing $ 25.00 ENIiRGY CODE Energy Code Plans check fee is also established to check to meet the requirements of RCN/ 51-11 WAC. These are in addition to the Building Code Fees. If City inspectors are assigned to verify Energy Plans the following fees will be invoked. If an outside energy inspector is required that fee will be determined by the outside agency. Residential Remodel./Addition $ -0- New Single Family $ -0- • Tenant Improvement 0 to 10,000 square feet $ 35.00 10,001 and up $ 45.00 Multi -Family per building $ 60.00 New Commercial and industrial $ 90.00 W.S.B.C.C.SURCHARGE • A flat fee of$4.50 will be collected on each permit for approved plans or any other permit that is issued in accordance with the Uniform Building Code. EXCEPT: For multi - family projects the'fee is $4.50 for the•first living unit and $2.00 for each additional unit. This fee is to be forwarded to the Washington State • Building Code Council on a quarterly basis by the Finance Department. DEMOLITION PERMIT Single Family Residence $ 44.00 * Commercial buildings $125.00 * + $20. for garage or out buildings +$10..for each septic or underground flammable tanks: See Fire Department fee schedule for removal of flammable liquids tank (s). MISCELLANEOUS FEES For City personnel 1. A) Hourly rate for miscellaneous inspections $47.00 per hour Hourly rate for miscellaneous plans check $47.00 per hour Hourly rate for permit specialist $42.00 per hour Hourly rate for planners $47.00 per hour. B) Overtime charges for: 1) Plans checker 1 1/2 times their 2) Inspector regular rate 3) Permit Specialist 4) Planners FEE EXH113rr A-1 rwised 5-22-03 1030 hours 5 • C Hourly fees for cant-acted services will be according to the contract rate. D) Hourly rate for special called inspections. $47.00 • 2. See Fee Exhibit A-2 3. Delete 4. Mobile home location permit and inspection 1. Temporary mobile home $ 60.00 2. Manufactured home inspection per section $ 50.00 plus basement f;ee. 5. House Moving A) Class J, 11 and 111 Moving Permit $ 60.00 Inspection fee $ 60.00 * * Plus $47.00 per hour after the first hour and$.50 per mile if the building to be moved into the City is outside the Ci Class IV - If already permitted by the County or Spokane City $ -0- 6. Minimum Housing Inspection fee $ 55.00 * * Plus $47.00 per hour after the first hour. 7. Work on any housing or building without a permit ( A) See section 107.5.2 of the U. B. C. (Which says "An investigation fee, in addition to the permit • fee, shall be collected rvhether or not a permit is then issued • or subsequently issued. The minimum investigation fee shall be the same as the minimum fee set forth in table .1-A."This then doubles the building permit fee.) 1. An investigative inspection fee $ 55.00 8. Special inspections (requested by owner or tenant). A.) Fire, wind, mud slide or flood damage S 60.00 B) Mini Day Care $ 60.00 C) Nursing Homes, hospitals, et at $ 60.00 * * Plus $ 47.00 per hour after the first hour D) Special Occupancies $ 60.00 9. Excess inspections created by contractor for a given project created by the developer of contractor.. • Per Inspection $ 47.00 • • Reinspections—residential/commercial $ 47.00 10. Condominium conversion plans review and inspection fee: This fee will be based on the value of the conversion and the U..B.C. valuations FEE EX.HiBrr A-1 rcviscd 5-22-03 1030 hours 6 1 • 11 Tern.ora tents cano)ies and air su. orted structures A) Plans check fee $ 1 3.00 B) Basic permit fee $ 60.00 12. Enclosing of an existing deck or patio. A) Basic permit fee (The valuation of the project with the minimum _ valuation of$3,000. to be used ) B) 40% of the basic fee for plans examination. 13. Swimming pools (Over 5,000 gallons) Basic fee $ 50.00 Plus plumbing fees 14. Reroof Permit Value of project 15. Change of Use permit $47.00 16. Unusual structures such as towers, elevated tanks, antennas. Value of project GRADING A) The descriptions outlined in Table 33-A and Table 33-B of the U. B. C. Appendix Chapter 33 will be used for both permit and review fees. Permit Fees • 50 Cubic Yards or less $ 20.00 51 to 100 Cu. Yd. $ 20.00 101 to 1,000 Cu. Yd For the first 100 Cu. Yd $ 20.00 Plus $7. for each additional 100 Cu. Yd. 1,001 to 1.0,000 Cu.-Yd. For the first 1,001 Cu. Yds. $ 83.00 Plus $ 6. for each additional 1,000 Cu. Yd. 10,001 to 100,000 Cu. Yd. For the first 10,000 Cu. Yds. $147.00 Plus $ 15. for each additional 10,000 Cu. Yds. 100,001 to 200,000 Cu. Yds. For the 1St 100,000 C. Y. $368.00 Plus$ 15. for each additional 100,000 Cu. Yds. 200,000 or more Cu. Yds. For the 1St 200,000 yds. $503.00 Plus $15.00 for each additional 200,000 Cu. Yds. • Plans Checking Fees 50 Cubic Yards or less No Fee 51 to 100 Cu. Yds. • $ 12.00 101 to 1,000 Cu. Yds. $ 20.00 1,001 to 10,000 Cu. Yds. $ 25.00 10,001 to 100,000 Cu. Yds. For first 10,000 Cu. Yds. $ 25.00 • Plus $ 7.00 for each additional 10,000 Cu. Yds. • 100.001 to 200,000 Cu. Yds. 'S 98.00 FIE EXHIBIT A-1 rcviscd 5-22-03 1030 hours 7 Plus $6.00 for each additional 100,000 Cu. Yds. 200.001 Cu. Yds or more $158.00 13) Land Clearing only- (without earth being moved) $ 65.00 • • • FEE EX1-1113Cr A-1 revised 5-22-03 1030 hours 8 **********l:***k'1***** ***f:************.******k*****************k R'***}.'** FIRE CODE FEES **-k ****x********:t*1:*********:E******************:t***•***********k******* 1. Fees for fire code permits will be in accordance with. attachment B, if deemed to be required by the Fire Marshal and/or the Building Official. 2. False Alarm fees In concurrence with the Uniform Fire Code amendment the following fees are set for repeated malfunctioning false alarms in a given six month period. 1st alarm no charge 2nd alarm $ 30.00 3rd alarm $ 70.00 4th alarm $ 120.00 5th alarm Require a hired fire watch 3. Fireworks Public Displays $100.00# # Max. per RCW 70.77 This city Resolution also requires a performance bond or cash deposit of$500.00 for clean up purposes and a liability insurance policy of$1,000,000.00. 4. Plans check and review fees by the Bureau of Fire Prevention. (if conducted) A. Plans check and inspection fee for new commercial $ 40.00 projects not mentioned elsewhere. B. Fire Watch Service(three hours minimum) $140.00 Plus hourly thereafter C. Hourly fee for after hour inspections, plans review, consultations for projects that do not require a permit, and other special services. , Time and a half of the hourly rate D. Hourly rate $ 47.00 5. Plans check and review fees, inspections, and permit for installation of separate fire alarm system or sprinkler system applications, and other fire protection. systems. A. Commercial—Fire alarm systems I. Permit, plans check and Inspection • Based on value B. Fire alarm systems -residential l. All zones $ 40.00 2. Permit Fee $ 35.00 C. $prinkler systems Tenant Improvements-less than 10 heads $ 65.00 -11 or more heads $ 85.00 FEE EXHIBIT A-I revised 5-22-03 1030 hours 9 New systems 1. Commercial a. Plans check, inspection, &permit Based on value 2. Residential-each riser $ 60.00 plus each plug or head $ 1.10 • D. Fire extinguishing system: (other than sprinklers) 1. Fire extinguishing system $ 50.00 plus each nozzle $ 1.50 E. Standpipe installation: Class I and Class [1 $ 58.00 Class III $ 70.00 F. Fire Pump Installation: $ 55.00 G. Power generators installation: • $ 55.00 H. Flammable and combustible liquids storage tanks installation: 1.. Underground, 1st tank $ 55.00 plus each additional tank on same site $ 35.50 • 2. Above ground tank $ 55.00 plus each additional tank on the same site $ 35.00 3. Annual permit fee for storage $ 30.00 I. Hazardous materials storage tanks installation: 1. Less than.500 gallons - each • $ 75.00 2. 500 - 1,199 gallons each $104.00 3. 1,200 gallons or more $147.00 J. Liquefied petroleum tanks: installation 1. Less than 500 gallons $ 84.00 2. 500 - 9,999 gallons $104.00 3. 10,000 gallons or more $147.00 • K. Gaseous oxygen systems installation: 1. Less than 6,000 cubic feet $ 78.00 2. 6,000 - 1.1,999 cubic feet $ 90.00 3. 12,000 cubic feet or more $118.00 L. Nitrous systems installation: $ 95.00 1. plus each outlet 12.00 FEE EXN II3IT A-1=sisal 5-22-03 1030 hotirs 10 • • M. Medical gas systems installation: 1. Gaseous system $ 90.00 plus each outlet $ 12.00 2. Liquefied system $ 95.00 plus each outlet $ 1.2.00 N. Hazardous material recycling system installation: 1. 110 gallons or less per day capacity $ 95.00 2. More than 110 gallons per day capacity $117.00 O. Vapor recovery system installation: (per tank) 1. Phase i- tank truck and tank $ 90.00 2. Phase II - vehicle fueled and tank $115.00 P. Cryogenic tank installation: (1st tank) $ 95.00 Each additional tank on same site $ 35.00 Q. Removal or abandonment, or any combination thereof, of flammable or combustible liquid storage tanks: • 1. First tank(commercial) $ 84.00 2. Each additional tank on the same site (commercial) $ 47.50 3. Contractors permit for removal or abandonment of residential under-ground fuel tanks $ 75.00 • R. Fire Department fee for inspections and follow up. For initial inspection,plans check and follow up inspections as called for in the Fire Code the fire department will be paid 65% of the fee collected for the permit. This payment will be paid quarterly. S. Annual fire department fees for permits to maintain, store, use or handle materials or conduct a process which produce conditions hazardous to life and property are listed in attachment A of the Building Department Operating Policy number 23 and listed in the Uniform Fire Code. The categories listed may or may not require a permit depending on the determination of the Building Official or the Fire Marshal. FEE EXHIBIT A-1 revised 5-22-03 1030 hours 1 1 PUBLIC WORKS 1. Hourly rate (See Fee Exhibit A-2 2. Public Right of Way. (See Fee Exhibit A-2) 3. Traffic Impact fees Not available 4. Storm Water system review fees $250.00 Plus $50.00 per hour for engineering and field • Inspection based on actual time. 5. Water and sewer fees Will require a certificate of availability for water and sewer From water and sewer purveyors. May require a city street use Permit. • 6. Flood Plains Permit $30.00 7. SPECIAL INSPECTIONS: A. Field monitoring or inspections of grading non residential sites. a. Commercial, multifamily, and multi lot sites— Four hour minimum $200.00 plus hourly b. Industrial or mineral industrial sites $225.00 plus hourly B. Conditional Use permits $200.00 Plus inspection fee C. Variances Hourly rate D. Shoreline permits $250.00 plus hourly 7. Site engineering review—for road design, drainage, erosion, • sedimentation control, right of way improvements, etc. • A. Commercial construction $250.00 plus hourly Rate after 5 hours. B. Residential construction $150.00 plus hourly • Rate after 3 hours C. Subdivisions, short divisions and planned unit Developments, right of way'use and grading and clearing Permits (including alteration or vacation of final short Hats and plats). Hourly rate FEE EXHIBIT A-1 revised 5-22-03 1030 hours 12 COMMUNITY DEVELOPMENT *******************J A******************************kit******************* CATEGORY 1. Subdivisions (See Fee Exhibit A-2) * Certificate of exemption $ 95.00 • Zero lot line $ 100.00=$10./lot 2. SEPA checklist (See Fee Exhibit A-2) • 3. Shoreline - * Substantial Development Permit $ 800.00 * Conditional use $ 800.00 * Variance $ 800.00 (The above three permit applications may be consolidated. Ti multiple permit applications are made,the applicant will be charged the full fee for the application with the highest fee and 50%of the established fee for each of the other applications) * Appeal—local $ 100.00 4. Administrative interpretation Appeal of decision $ 250.00 5. Appeals of.Hearing Examiners findings $ 300.00 6. Binding site plan $1,500.00 • 7. Binding site plan modification $ 1,300.00 * Change of Conditions $ 650.00 8. Combining district $1,000.00 9. Comprehensive plan amendment $1,500.00 10.. Conditional Use permit $ 500.00 11. Lot line adjustment $ 100.00 12. Lot line elimination $ 100.00 13. Plan Unit development (See Fee Exhibit A-2) • 14. Pre application conference (Fee Exhibit A-2) FEE EXHIBIT A-1 revisal 5-22-03 1030 horns 13 15. Signs Review of permanent sign $ 150.00 Review of temporary sign $ 75.00 16. Home occupation permit $ 300.00 17. Temporary use O to 30 days $ 100.00 31 to 90 days $ 250.00 18. Variances Administrative $ 300.00 Single family residence $ 300.00 Signs and all.others $ 750.00 19. Zoning map amendments (rezone) $1,500.00 20 Zoning and Subdivision code text change $ 500.00 NON APPLICATION FEES 1. Site plan review $ 250.00 General. layout Landscaping Off street parking 2. Environmental Impact Statement (See Fee Exhibit A-2) 3. Code enforcement violation approval to Hearing Examiner $ 250.00 • • FEE EX IIBIT A-1 revised 5-22-03 1030 hours 14 ADNINISTRATTON 1. Copy fees a. Copies of audio tapes, video tapes, photos, maps, or other records needing reproduction. At cost b. Copies of written records $ 00.15 per page c. Copies of annual budget $ 10.00 e. Copies of full documents may be purchased from Kinko's 2. Other fees a. NSF check $ 25.00 b. Use of Public Property; permit for 3. Franchise fees (If any) ' a. Natural Gas $ b. Telephone c. Cable company $ d. Disposal company $ 4. Impact fees Of any) a. Sewer late comer fees b. Roads c. Schools • FEE EXHIBIT A-1 revised 5-22-03 1030 hours 1 5 *********************************ski:**************************i•i ti-ti-!•i-*** PARKS ANA) RECREATION 0. Basic Administrative Fees to be considered when applying rates Administrative Fee $ 30.00 Refuse Fee $ 50.00 1. Picnic Shelter(<200 people) $ 30.00 Picnic shelter(200 plus people) * $ 1.50.00 Refundable deposit(<200) $ 50.00 Refundable deposit(200 +) $ 250.00 2. Events $150.00 Non-Profit applications $ 80.00 or Free with sponsorship ** Applications for joint sponsorship with,the City of Spokane Valley will be considered by the Spokane Valley Parks Department. 3. Mirabeau Small shelter and waterfall $150. (4 hours) Mirabeau Meadows Shelter (<200 people) $ 80.00 • Mirabeau Meadows Shelter(200+People) $150.00 Refundable deposit(<200 people) $ 50.00 Refundable deposit(200+people) $250.00 4. Field Use youth—no lights $ ** youth—lights $ ' adults—no lights $ ** adults—lights $ ** League use $ ** 5. Aquatics Pool Admission (age 5 +) $ 1.00 Pool Admission (under 5 ) Free Pool punch pass (25 swims) $20.00 • Weekend family.discount (one child under 13 free with paying adult) Reservation. (< 50) $100.00 per hour(min 2 hrs) Food Fee $25.00 Reservation ( 50 to 100) $125.00 per hour(Min 2 hrs) Food Fee $50.00 Reservation (101 to 150) $150.00 per hour (Min 2 hrs) Food Fee $75.00 FEE DCHIBrr A-1 revisal 5-22-03 1030 hours 16 6. Photography Family still and video $ **- Non family and non commercial still and video $ ** Commercial still (except weddings and graduations) $ ** • Short commercial video $ ** Motion picture and film $ *=r. 7. indoor use Open gym admission $ 2.00 • Indoor playground Program admission ** $ 20.00 Admission to open carnivals/ events ** $ 0.00 Admission to dances Room rentals ** $10./hour, min.3 hours Gym rentals—practice, games .F* $15./hour, min 2 hours Gym rentals—events, dances **$100.00 per hr. Rental of Western Dance Hall Now Handled by WDH 8. Recreation classes different each Session 9.. Trips Seniors, teens, etc different each trip Includes administrative'fee ($30.), refuse fee($50.), additional staff preparation and/or additional tables '* Subject to revisitation as we acquire more data on the use of our facilities. • • FEE EXHIBIT A-1 revised 5-22-03 1030 hours 17 • r l City of Spokane Valley EXHIBIT A-2 FOR RESOLUTION 03-021 MASTER FEE SCHEDULE FOR BITILDI? G&FIRE CODES, AND DEPARTMENTS OF PUBLIC WORKS, PLANNING, PARKS AND RECREATION, AND ADMINISTRATION. Fees for permits and services will he set by this resolution for the City of Spokane Valley All fees are to be collected and listed on a finance department receipt under the proper BARS code number so that each fee can he accounted for. BU]T DING DEPARTMENT • MISCELLANEOUS FEES 2 Pre-application - Building Department—if called for by the applicant. (This is separate from the Plan n.ing pre-application meeting) Fees for pre-application review and evaluation: Group 1. Small, simple and easy to administer applications including residential mechanical,registered plans, extensions, and l3asic accessories and residential revisions: $61.00 • Group 2. Applications more complex that group 1, including Already built construction, fire service permits, accessories to Residence, shell modifications, commercial mechanical, signs, Additions, mobile homes, and other applications not included in groups 1 and 3: $80.00 Group 3. Applications more complex that groups 1 and 2, Including new residences, small non building permits, com- mercial tenant improvements and revisions, permits issued "subject to field inspection"and agricultural building: S 100.00 Group 4. Applications more complex and difficult than the other groups, including small and large commercial new commercial buildings, multiple family buildings, large building structures or other permits with complex processing such as commercial site plans: $145.00 If called for by the Building Department for City benefit: N / C FEE EXHIBIT A-2 5-22-03 1035 HOURS 1 • COMMUNITY DEVELOPMENT 1. Subdivisions ^ Tentative plat $250.00 A Preliminary plat $2,000.00+ $25. per lot A Final plat $1,000.00 +S10. per lot A Short plat 2-4 lots $500.00 A Short plat 5-9 lots • Tentative plat $250.00 Preliminary plat $1,000.00+ $25.00 per lot Final Plat $ 800.00 + $10.per lot Short plat appeal $200.00 . A Plat modification Regular plat $650.00 Short plat $265.00 2. SEPA checklist A For a single dwelling(when required) $1 00.00 A For all other developments $300.00 A Appeal of SEPA.determination $250.00 13. Plan Unit Development A PUD tentati.vesplan $250.00 A PUD plan $1,500.00+ $25. per lot A PUD modification Minor. $250.00 Major $750.00 • 14. Pre application conference $ 61.00 • NON APPLICATION FEES 2. Environmental Impact Statement—one time cost $2,000.00 A If contracted out by applicant—Total.cost to be born by applicant. A One time cost is for staff review of consultant's work. FEE I?X}tiRIT A-2 5-22-03 1035 HOURS 2 • ****4-4.4-5i:*********************************************************4.44.4.********* PUBLIC WORKS 1. Hourly Rate $50.00 2. Public Right of Way. a, Obstruction Permit $16.00 Plus review & inspection fee at hourly rate b. Utility Right of Way permit $16.00 Plus review & inspection fee at hourly rate c. Approach Permit $25.00 Plus review & inspection fee at hourly rate d. Cash, certified check or bond for right of way cleaning $1,000.00 • • • • FEE EXHIBIT A-2 5-22-03 1035 HOURS 3 f Cray of SPOKANE VALLEY EXHIBIT BIT B ANNUAL FIRE CODE FEES FOR MATERIALS DEFINED BY THE FTRE CODE FOR PERMITS TO MAINTAIN, STORE, USE OR HANDLE MATERIALS OR CONJ)ITCT PROCESSES WHICH PRODUCE CONDITIONS HAZARDOUS TO LIFE AND PROPERTY. Attachment A to the fee schedule adopted by the City Council of the City of Spokane Valley, Resolution 03-021 No permit or fee shall be required for the use of candles in ceremonies by non- profit organizations. (State RCW) The following categories of operations may or may not require a permit depending on the determination of the Building Official or the Fire Marshal. Section 105 of the Uniform Fire Code requires permits for the following numbered operations. Many of the items are not conducted in Spokane Valley, some are covered by another agency or another code, and some are a rare occurrence . The rest should be maintained in this exhibit. Annual Fee,Installation fee or each Occasion fee as noted 1. Aerosol Products (in excess of 500 pounds) S 35.00 annual 2. Aircraft Refueling Vehicles . $ 95.00 void • 3. Aircraft Repair hanger $105.00 void 4. Asbestos removal $ 85.00 void 5. Automobile wrecking yard $ 35.00 annual 6. Battery systems using lead acid batteries S 35.00 annual 7. Bowling pin or alley refinishing $ 45.00 occurrence 8. Carnivals and fairs $45.00 occurrence 9. Cellulose nitrate film handling and storage (in excess of 25 pounds) $45.00 void 10. Combustible fiber storage (in excess of 100 cubic feet) S 35.00 annual 11. Combustible material storage $35.00 annual • 5-VFF rb 5-19-03 ( in excess of 2,500 cubic feet) 12. Compressed gases (in excess of table 105-A) $35.00 annual 13. Commercial rubbish-handling operation $ 90.00 void 14. Cryogens (in excess of table 105-B) $ 70.00 installation 15. Dry cleaning plants using hazardous solvents S 45.00 annual 16. Dust Producing operations S 45.00 annual 17. Explosives or blasting agents (use of) Yearly fee S 95.00 OR each occasion $ 35.00 18. Fireworks (see Main fee schedule) $100.00 occurrence 19. Flammable or combustible liquids $ 45.00 annual a. residential fuel tanks $ 20.00 void 20. Fruit ripening $124.00 void 21. Fumigation or thermal insecticidal fogging. $ 45.00 occurrence 22. Hazardous materials $ 45.00 annual 23. High piles combustible storage $ 45.00 annual • 24. Hot work operations (welding and cutting) $ 35.00 annual on construction site $ 30.00 25. Liquefied petroleum gases - commercial $ 35.00 annual 26. Liquid or gas fueled vehicles or equipment in • assembly areas $ 35.00 plus $10 per vehicle occurrence 27. Lumber yards $ 35.00 annual 28. Magnesium working(in excess of 10 pounds per day) 5 40.00 annual 29.. Mall, covered (certain uses) (i.e.; open flame use, display booths ) $ 45.00 occurrence 30. Organic coating manufacture : $ 90.00 installation 31. Ovens; industrial baking or drying $ 75.00 installation S-VFEEb 5-19-03 32. Parade Floats N/A. 31 Places of assembly- commercial $ 35.00 occurrence non-profit -0- 34. Pyrotechnical special effects material $ 70.00 occurrence 35. Radioactive materials $ 70.00 annual 36. Refrigeration equipment (regulated by article 63) $ 35.00 void 37 Rifle Ranges $ 40.00 annual 38. Repair Garages $ 35.00 annual 39. Spraying or dipping $ 70.00 annual' 40. Special reinspection fee for any permit $ 47.00 41. Temporary membrane structures, tents, or canopies (less than 90 days) $ 45.00 void (91 to 120 days) $ 85.00 void 43. Tire storage (in excess of 1,000 cubic feet) $ 40.00 annual 3 of • • S-VFEEb 5-19-03