Loading...
Resolution 03-021 Adoption of Master Fee Schedule CITY OF SPOKANE VALLEY SPOKANE COUNTY, WASHINGTON RESOLUTION NO. 03-021 A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY, ADOPTING A MASTER FEE SCHEDULE WHEREAS, the City Council desires that all fees that the City collects be set forth in one document; WHEREAS the City Council desires that the amount of such fees be adjusted on an annual basis to reflect increases or decreases in the cost of living; NOW, T IMREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane County, Washington, as follows: Section 1. Adoption of Fee Schedule. The Master Fee Schedule attached hereto as Exhibit A and Exhibit 13 is hereby adopted as if fully set forth herein. Section 2. Grant of Authority. City staff are hereby granted the authority to collect the fees in the amount and manner as set forth in the Fee Schedule. Section 3. Future Adjustments. It is the intent of the City Council that the Master Fee Schedule shall be reviewed and updated annually in March of 2004 and in March of each succeeding year. To the extent that it is practical, such annual adjustments should reflect the percentage of cost recovery that is determined by the City Council to be appropriate for each function, program or service. If sufficient information is not available to determine actual cost of a service, the adjustments may reflect an increase or decrease not to exceed the annual percentage change in the Consumer Price Index for Urban Wage Earners and Clerical Workers for the period ending in June of the previous year rounded to the nearest$0.05. Section 4. City Manager Authority. In order to ensure full recovery of the cost of any Parks and Recreation activity or program not identified on Exhibit A, the City Manager is authorized to establish a fee not to exceed $2,000.00. Section 5. Severability. Should any section, paragraph, sentence, clause or phrase of this Resolution, or its application to any person or circumstance, be declared unconstitutional or otherwise invalid for any reason, or should any portion of this Resolution be pre-empted by state or federal law or regulation, such decision or pre- emption shall not affect the validity of the remaining portions of this Resolution or its application to other persons or circumstances. Resolution No.03-021,Master Fee Sched.With escalator 1 Section 6. Effective Date. This Resolution shall be in full force and effect on March 31, 2003, provided that the terms of this resolution shall also be in effect during the interim period. Adopted this Aday of March, 2003 CITY OF SPOKANE VALLEY ) Mayor Michael Tie leming ATTEST: Interim City Clerk, Ruth Muller Approved as to Form: teri !ity or y, Stanl M. Schwartz Resolution No.03421.Master Fee Sched.With escalator 2 • • City of SPOKANE VALLEY EXHIBIT A FOR RESOLUTION /no, 03-0a/ • MASTER FEE SCHEDULE FOR BUILDING& FIRE CODES, AND DEPARTMENTS OF PUBLIC WORKS, PLANNING, PARKS AND RECREATION, AND ADMINISTRATION. Fees for permits and services will be set by this resolution for the • City of Spokane Valley • All fees are to be collected and listed on the finance department receipt under the proper BARS code number so that each fee can be accounted for. BUILDING CODE . • 1. Building Permit fees for each project is set by the following fee schedule and item 2 below. . TOTAL VALUATION _ FEE $1 to $500 $23:50 $501 to_$2,000 $23.50 for the first$500 plus $3.05 for each additional $100, or fraction thereof, to-and including$2,000 $2,001 to $25,000 $69.25 for the first $2,000 plus $14 for each • additional $1,000, or fraction thereof, to and including S25,000 $25,001 to $50,000 .• $391.25 for the first $25,000 plus $10.10 for each additional $1,000, or fraction thereof, to and including $50,000 $50,001 to.$100,000 : $643.75 for the first$50,000 plus $i for each • additional $1,000, or fraction thereof, to and including $100,000 $100,001 to $500,000 $993.75 for the first S100,000 plus $5.60 for • . each additional $1,000, or fraction thereof, to and including $500,000 $500,001 to$1,000,000 $3,233.75 for the first$500,000 plus$4.75 for • each additional $1,000, or fraction thereof, to and including S1,000,000 $1,000,000 and up $5,60$.75 for the first$1,000,000 plus $3.15 for each additional $1,000, or fraction thereof • • 1 • 2. The above table is to be used to determine the building permit fees and plans check fees based on the 1. B. C. O. Valuation Modifier for this part of the country. THIS MODIFIER FIGURE IS FOR SETTING FEES ONLY AND NOT TO DETERMINE THE EXACT VALUE OF THE BUILDING. This modifier is revised and published every April by the International Conference of Building Officials and used by the City. The modifier of 1.0 is to be used. Decks and Porches to be valued at the same rate as "Open Carports". Any separate deck or porch permit for less than $3,000.00 will have a permit fee of$72.00 and a plan check fee of $47.00. Over$3,000.00 will be at the rate shown in the schedule. The WSBCC fee will apply, and is not refundable. Except: The hourly rates will be as follows in this Resolution. 3. PLANS REVIEW FEES are to be collected at the time of receiving the application for permit. This fee is to be 65% of the cost of the basic building permit fee as set by the City of Spokane Valley. Plans review fees are not refundable, except under certain conditions established by the Building Official. (See Operating Policy# 29 and Section 107.3 of the U. B. C.) This fee is in addition to the full basic fee. Energy Code Plans check and the WSBBC fee is also to be collected at this time. If a set of plans already checked and approved is resubmitted by the owner or his/her agent, an hourly rate of$ 47.00 will be applied for the re-review. 4. THE BUILDING CODE FEES are collected at the time of the issuance of the building permit. Other fees are also to be collected at the time of the issuing of the building permit. (i.e.; fire department fees not already collected, plumbing and mechanical code fees, planning fees, public works fees, and fees in lieu. etc.) Each department for whom the fee is collected is to advise the permit specialist of fees due. A.DDITION.AL PLANS CHECK FEES MAY BE ASSESSED IF CONSIDERABLE CH.A.NGES OR REVISIONS NEEI.) TO BE MADE IN THE PLANS PRIOR TO APPROVAL. 5. Hourly rate set for City Employees $ 47.00 SIGN FEES 1. Fees collected for a sign permit and a plans check fee for signs erected in accordance with the Uniform Sign Code will be collected in accordance with the Table i.n Item 1 under Building Code in this resolution based on the evaluation established by the owner or the installer. The fee schedule will start at the $3,000.00 valuation mark. Signs valued for less that $3,000.00 will have a permit fee of$72.00 and a plans check fee of $47.00. Plus the WSBCC fee of$4.50. PLUMBM CODE 1. The fees outlined below are to be collected at the time of issuing a plumbing permit. If the plumbing is included in the Building Permit the unit costs are to be added but not the basic permit fee. 2 • A. Basic fee for issuing each permit $ 35.00 Basic for each supplemental permit $ 17.00 B. Unit fees (in addition to the basic fee) 1. For each plumbing fixture on a trap ( including . garbage disposals, dish washers, back flow device, drainage, hot tubs, built in water softener, water closets, lavatories, sinks, drains, etc) $ 6.00 2. For each private sewage disposal system $ 20.00 3. For each water heater and/vent (gas or electric) $ 10.00 4. For each industrial waste pretreatment interceptor including its trap and vent, except kitchen type grease interceptors functioning as fixture traps. $ 15.00 5. For each repair or alteration of water piping, drainage or vent piping, each fixture • - $ 6.00 6. For each lawn sprinkler system on any one meter including back.iow protection devices $ 25.00 7. For atmospheric type vacuum breakers not included in item 6. l to 5 . ' $ 25.00 over 5, each $ 6.00 • 8. For each backflow protective device other than atmospheric type vacuum breakers $ 6.00 9. For each gray water system $ 20.00 MECHANICAL CODE 1. The fees outlined below will be used and collected at the time of issuing a • mechanical permit. If the mechanical is included in the Building Permit the unit costs are to be added but not the basic permit fee. A. Basic Fee for issuing a permit '$ 35.00 Basic fee for each supplemental permit $ 7.50 • B. Unit fee (in addition to the basic fee) Refer to the Uniform Mechanical fee list (Table 1-A ) for explanation of each • Category/ ' • • • 3 Furnaces & suspended heaters - Installation or relocation up to and including i 00,000 btu $ 15.00 over 100,000 btu 19.00 Duct work system $ 10.00 . Wood stcye system $ 25.00 • Heat pump &,air conditioner— 0 to 3 tons $ 1.2.00 3 to 15 tuns . $ 20.00 over 15 to 30 tons 25-00 over 30 to 50 tons $ 35-00 over 50 torts S 60-00 Gas water heater $ 10.00 Gas piping system — 1 —4 outlets Chapter 13 & 14) 5.00 Each additional outlet 5 1.00 Gas log installation 10.00 • Appliance vents installation- relocation- ! Replacement • $ . 750 each • Repairs or Additions—of appliance controlled by the UM . 5 15,00 Boilers, Compressors, and Absorption systems 3 hp— 100,000 btu or less 15.00 3 to 15 hp— 100-000 to 500,000 btu $ 28.00 15 — 30 hp— 500,000 to 1,000,000 btu 39-00 over 30:hp— 1,000,000 to 1,750,000 btu $ 57-00 over 50 hp —over 1,750,000 btu . S 95.00 ' Air Handlers . • . Each unit up to 10,000 cfm, including ducts See LAIC for exception . $ 12.00 . Each unit over 10,000 cfra .. � $ 19.00 .. . Evaporative Coolers (other than portable) 5 12-00 Ventilation and exhaust •• Each fan connected to a single duct $ $-p Each ventilation system 5 12.00 E • ach hood served by mechanical exhaust . $ 12,00 Incinerators . installation or relocation of residential .5 19.00 Installation or relocation of'commercial $ 22,00 . . i 4 ENERGY CODE Energy Code Plans check fee is also established to check to meet the • requirements of RCW S1-11 WAC. These are in addition to the Building Code Fees. Residential Remodel /Addition $ 35.00 New Single Family S 45.00 Tenant Improvement 0 to 10,000 square feet $ 55.00 10,001 and up $ 75.00 Multi - Family per building Si 1 0.00 New Commercial W.S.B.C.C. SURCHARGE A flat fee of$4.50 will be collected on each permit for approved plans or any other permit that is issued in accordance with the Uniform Building Code. EXCEPT: For multi - family projects the fee is $4.50 for the first living unit and $2.00 for each additional unit:This fee is to be forwarded to the Washington State Building Code Council on a quarterly basis by the Finance Department. • DEMOLITION PERMIT $125.00 Plus fees for the removal of underground storage tank for flammable liquids. (Mechanical fee) MISCELLANEOUS FEES For City personnel ' 1. A) Hourly rate for miscellaneous inspections $47.00 per hour :' Hourly rate for miscellaneous plans check $47.00 per hour Hourly rate for permit specialist $42.00 per hour Hourly rate for planners • $47.00 per hour 13) . Overtime charges for: 1) Plans checker - • 1 1/2 times their 2) Inspector regular rate 3) Permit Specialist IP 4) Planners C Hourly fees for contracted services will be according to the contract rate. D) Hourly rate for special called inspections. $47.00 2. Preapplication -building division. Fees for preapplication review and evaluation. Group 1: Small, simple and easy to administer applications • including residential mechanical, registered plans, extensions, basics and basic accessories and residential revisions: $ 65.00 5 Group 2: Applications more complex than group 1, including already built construction, fire service permits, accessories to residence, sign, shell modifications, commercial mechanical, additions, mobile homes, and other applications not included in groups 1 and 3: $110.00 Group 3: Applications more complex than groups 1 and 3, including new residences, small non building permits, com- mercial tenant improvements and revisions,permits issued "subject to field inspection" and agricultural buildings: $150.00 Group 4: Applications more complex and difficult than the other groups, including small and large new commercial • buildings, multifamily buildings, large non building structures or other permits with complex processing such as commercial site plans: $225.00 plus a per hour rate over six hours 3. Preapplication fees - land services division. Fees for preapplication review and evaluation and counter service fees Group 1. Small simple applications, affidavits, including short plats, revisions, shoreline exemptions, right-of-way use, lot line adjustments, all extensions, road and drainage variances and other miscellaneous services: $ 65.00 Group 2. Applications more complex than group 1, including clearing and grading, final plats and final public utility district applications, alterations to final plats, or public utility districts and engineering plans: $110.00 Group 3. Applications more complex than groups 1 and 2, including variances, shoreline, preliminary short plats, and SAO utility exceptions: $150.00 Group 4: The most complex applications, including preliminary plats,variances, conditional use permits, special use permits, and zone and shoreline reclassification: $225.00 4. Mobile home location permit and inspections. 1. Mobil home permit and inspection $ 110.00 2. Temporary mobile home $ 90.00 3. Manufactured home inspection per section S 50.00 5. House Moving - A) Class I and II Moving Permit $ 65.00 Inspection fee $ 65.00 * * Plus $47:00 per hour after the first hour and $.50 per mile if the building to be moved into the City is outside the City. 6 B) Class III and IV Moving permit $ 65.00 6. Minimum Housing Inspection fee $ 65.00 * * Plus $47.00 per hour after the first hour. 7. Work on any housing or building without a permit A) See section 107.5.2 of the U. B. C. - (Which says "An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then issued or subsequently issued The minimum investigation fee shall be the same as the minimum fee set forth in table IA." This then doubles the building permit fee.) a. An investigative inspection fee . $ 65.00 8. Special inspections (requeted). A) Fire, wind, mud slide or flood damage S 65.00 • B) Mini Day Care $ 65.00 • C) •Nursing Homes, hospitals, et al $ 65.00 * * Plus $ 47.00 per hour after the first hour • D) Special Occupancies $ 65.00 9. Excess inspections created by contractor for a given project created by the developer of contractor.. Per Inspection $ 47.00 Reinspections -residential $ 47.00 commercial $ 47.00 10. Condominium conversion plans review and inspection fee: • This fee will be based on the value of the conversion and the U.13.C valuations. I 1 Temporary tents, canopies. and air supported structures • A) Plans check fee S 71.50 B) Basic permit fee $ 11 0.00 12. Enclosing of an existing deck or patio. A) Basic permit fee (The valuation of the project with the minimum • valuation of$5,000. to be used ) B) 65% of the basic fee. • 13. Swimming pools Basic fee $ 50.00 Plus plumbing fees • GRADING A) The descriptions outlined in Table 33-A and Table 33-B of the U. B. C. Appendix Chapter 33 wilt be used for both permit and review fees. • 7 • Permit Fees 50 Cubic Yards or less $ 20.00 • 51 to 100 Cu. Yd. $ 35.00 101 to 1,000 Cu. Yd For the first 100 Cu. Yd $ 35.00 Plus $10. for each additional 100 Cu. Yd. 1,001 to 10,000 Cu. Yd. For the first 1,001 Cu. Yds. $125.00 Plus $12. for each additional 1,000 Cu. Yd. 10,001 to 100,000 Cu. Yd. For the first 10,000 Cu. Yds. $233.00 Plus $ 15. for each additional 10,000 Cu. Yds. 100,001 to 200,000 Cu. Yds. For the 1s' 100,000 C. Y. $368.00 Plus $ 15. for each additional 100,000 Cu. Yds. 200,000 or more Cu. Yds. For the l st 200,000 yds. $503.00 Plus $7.00 for each additional 200,000 Cu. Yds. Plans Checking Fees 50 Cubic Yards or less No Fee 51 to 100 Cu. Yds. $ 18.00 101 to 1,000 Cu. Yds. $ 22.00 1,001 to 10,000 Cu. Yds. $ 35.00 10,001 to 100,000 Cu. Yds. For first 10,000 Cu. Yds. $ 35.00 Plus $ 7.00 for each additional 1.0,000 Cu. Yds. 100.001 to 200,000 Cu. Yds. $ 98.00 Plus $10.00 for each additional 100,000 Cu. Yds. 200.001 Cu. Yds or more $188.00 13) Land Clearing only - (without earth being moved) $120.00 • • • R *********************************************************************** • FIRE CODE FEES ***********************************k*********************************** 1. Fees for fire code permits will be in accordance with attachment B, if deemed to be required by the Fire Marshal and/or the Building Official. 2. False Alarm fees In concurrence with the Uniform Fire Code amendment the following fees are set for repeated malfunctioning false alarms in a given six month period. lst no charge 2 alarm $ 30.00 3rd alarm 4`h alarm $ 80.00 $ 120.00 5th alarm Require a hired fire watch. 3. Fireworks Public Displays • $100.00 # # Max.. per RCW 70.77 • T.his city Resolution also requires a performance bond or cash deposit of$500.00 for clean up purposes and a liability insurance policy of$1,000,000.00. 4. Plans check and review fees by the Bureau of Fire Prevention. A. Plans check and inspection fee for new commercial projects $ 70.00 • B. Fire Watch Service(three hours minimum) $140.00 Plus hourly thereafter C. Hourly fee for after hour inspections, plans review, consultations for projects that do not require a permit, • and other special services. • Time and a half of the hourly rate D. Hourly rate $ 47.00 6. • Plans check and review fees for separate fire alarm system or sprinkler system applications, and other fire protection systems. • • A. Plans check fee-Commercial—Fire alarm 1. One to four zones $ 104.00 2. Each additional zone $ 27.00 B. Fire alarm systems - residential 1. One to four zones $ 75.00 2. Each additional zone • $ 27.00 • C. Sprinkler systems 9 Tenant Improvements-less than 10 heads $ 85.00 -11 or more heads $125.00 New systems I. Commercial-each riser $180.00 plus each head or plug $ 2.70 2. Residential-each riser $ 90.00 plus each plug or head $ 1.90 3. Special water main extension or replacement $ 90.00 • D. Fire extinguishing system: (other than sprinklers) 1. Fire extinguishing system $ 90.00 plus each nozzle $ 15.00 F. Standpipe installation: Class 1 and Class II $ 98.00 Class ITT $115.00 F. Fire Pump Installation: $105.00 G. Power generators installation: $ 85.00 H. Flammable and combustible liquids storage tanks installation: 1. Underground, 1st tank $124.00 plus each additional tank on same site $ 75.50 2. Above ground tank $100.00 plus each additional tank on the same site $ 70.00 T. Hazardous materials storage tanks installation: 1. Less than 500 gallons - each $124.00 2. 500 - 1,199 gallons each $154.00 • • 3. 1,200 gallons or more $187.00 • J. Liquefied petroleum tanks: installation 1. Less than 500 gallons . $!24.00 2. 500- 9,999 gallons • $154.00 3. 10,000 gallons or more $187.00 K. Gaseous oxygen systems installation: 1. Less than 6,000 cubic feet $ 88.00 2. 6,000 - 11,999 cubic feet $140.00 3. 12,000 cubic feet or more $168.00 L. Nitrous systems installation: $120.00 • 1. plus each outlet 12.00 M. Medical gas systems installation: 10 • 1. Gaseous system $100.00 • plus each outlet $ 12.00 2. Liquefied system $120.00 plus each outlet $ 12.00 N. Hazardous material recycling system installation: 1. 110 gallons or less per day capacity $110.00 2. More than 110 gallons per day capacity $147.00 O. Vapor recovery system installation: (per tank) 1. Phase I - tank truck and tank $110.00 2. Phase II - vehicle fueled and tank $165.00 P. Cryogenic tank installation: (1st tank) $110.00 Each additional tank on same site $ 45.00 Q. Removal or abandonment, or any combination thereof, of flammable or. combustible liquid storage tanks: 1. First tank(commercial) $154.00 2. Each additional tank on the same site(commercial) $ 57.50 3. Contractors permit for removal or abandonment of residential under-ground fuel tanks $125.00 R. Fire Department fee for inspections and follow up. For initial inspection., plans check and follow up inspections as called for in the Fire Code the fire department will be paid 65% of the fee collected for the permit. This payment will be paid quarterly. S. . Annual fire department:fees for permits to maintain, store, use or handle materials or conduct a process which produce conditions hazardous to life and property are listed in attachment A of the Building Department Operating Policy - number 23 and listed in the Uniform Fire Code. The - categories listed may or may not require a permit depending on the • determination of the Building Official or the Fire Marshal. • • 11 **********:*************4************************************************ PUBLIC WORKS ************************************************************************ 1. Hourly rate $ 50.00 2. Construction permit for work in the Public Right of Way. $200.00 Plus $5.00 per lineal foot or$10.00 per lineal foot for Crossings, plus $50.00 per hour for inspection based On actual time. Cash, certified check or bond for right of way cleaning $1,000.00 3. Traffic Impact fees Not available 4. Storm Water system review fees $250.00 Plus $50.00 per hour for engineering and field Inspection based on actual time. 5. Water and sewer fees Will require a certificate of availability for water and sewer From water and sewer purveyors. May require a city street use Permit. 6. SPECIAL INSPECTIONS: A. Field monitoring or inspections of grading non residential sites. a. Commercial, multifamily, and multi lot sites— Four hour minimum $200.00 plus hourly b. Industrial or mineral industrial sites $225.00 plus hourly B. Right of Way permits Hourly rate C. Conditional Use permits $200.00 D. Variances Hourly rate E. Shoreline permits $250.00 plus hourly • 7. Site engineering review—for road design, drainage, erosion, sedimentation control, right of way improvements, etc. A. Commercial construction $250.00 plus hourly Rate after 5 hours. B. Residential construction $150.00 plus hourly • Rate after 3 hours 12 C. Subdivisions, short divisions and planned unit Developments, right of way use and grading and clearing Permits (including alteration or vacation of final short Plats and plats). Hourly rate • • • • 13 COMMUNITY DEVELOPMENT **********************, ************************************************* APPLICATION FEE SCHEDULE FOR PLANNING CATEGORY • 1. Subdivisions * Tentative plat $ 250.00 * Preliminary plat $2,500.00+$50. per lot * Final plat $1,500.00+$20. per lot * Short plat 2-4 lots $ 500.00 * Short plat 5-9 lots Tentative plat $ 250.00 Preliminary plat $1,000.00+$50. per lot Final plat $1,000.00+$20. per lot Short plat appeal $ 200.00 * Plat modification minor 'A of plat fee major %2 of plat fee * Certificate of exemption $ 95.00 * Zero lot line $ 325.00 + $10./lot 2. SEPA checklist * For a single dwelling $ 200.00 * For all other developments $ 700.00 * SEPA modification $ 150.00 * Exempt determination $ 200.00 * Appeal of SEPA determination • $ 200.00 • 3. Shoreline 0 • * Substantial Development Permit $1,000.00 * Conditional use $1,200.00 * Variance • (The above three permit applications may be consolidated_If multiple permit applications are made,the applicant will be charged the full fix for the application with the highest fee and 50%of the established fee for each of the other applications) _ Appeal—local 1,200.00 4. Administrative interpretation # Appeal of decision $ 250.00 5. Annexation review and handling $ 1,700.00 Final binding site plan $ 1,300 00 • • 14 6. Appeals of hearing examiner findings $ 300.00 7. Binding site plan $ 500.00 8. Binding site plan modification $ 350.00 9. Combining districts $1,500.00 10. Comprehensive Plan Amendment $1,500.00 11. Comprehensive plan text amendment $1,500.00 12. Conditional Use permit $1,200.00 13. Lot line adjustment $ 300.00 14. Lot line elimination $ 100.00 15. Plan Unit development PUD tentative plan $ 250.00 PUD plan $2,500.00+$50. per lot PUD plan modification Minor $ 250.00 Major $ 750.00 16. Pre application conference $ 250.00 17. Sigms Review of permanent sign $ 150.00 Review of temporary sign $ 75:00 18. Home occupation permit $ 300.00 - 19. Temporary use 0 to 30 days $ 100.00 31 to 90 days $ 250.00 20. Variances Administrative $ 300.00 Single family residence $ 300.00 Signs and all others $ 750.00 21. Zoning map amendments (rezone) $1,500.00 22 Zoning and Subdivision code text change $ 500.00 15 NON APPLICATION FEES 1. Site plan review $ 250.00 General layout Landscaping Off street parking 2. Environmental Impact Statement To be contracted out. Cost to be born by the applicant Staff review of consultant's work $2,000.00 • • • 16 • FINANCE DEPARTMENT 1. Copy fees a. Copies of audio tapes, video tapes,photos, maps, or other records needing reproduction. At cost b. Copies of written records $ 00.15 per page c. Copies of annual budget $ 10.00 d. NSF check $ 25.00 e. Copies of full documents may be purchased from Kinko's 2. Franchise fees (If any) • a. Natural Gas $ b. Telephone $ • c. Cable company $ • d. Disposal company $ 3. Impact fees (If any) a. ' Sewer late corner fees • b. Roads c. Schools • • • 17 • • ******k******** !•****?sY:FsF•9Fir**tt****i!•*** k****:F*icic***-kI:*******: ***ilk***:'k**:h PARKS AND RECREATION 1. Picnic Shelter(<200 people) $ 30:00 Picnic shelter (200 plus people) * $ 150.00 Refuse fee for shelter use $ 50.00 •Refundable deposit(<200) $ 50.00 Refundable deposit(200 +) $ 250.00 • 2. Weddings * $ 150.00 3. Field Use youth—no lights $ ** youth—lights $ ** adults—no lights $ ** adults—lights S ** League use $ ** 4. . Pool.Admission $ 1.00 • weekend family discount one child free with paying adult Reservation (<50) . ' $100.00 per hour . Reservation (50 to 100) - $125.00 per hour Reservation (101 to 150) • $1 50.00 per hour • ) - 5. Photography • Family still and video - $ ** • Non family and non commercial still and video $ ** • Commercial still (except weddings and graduations) $ ** • Short commercial video $ ** ' Motion picture and film - $ ** 6. indoor use . • Open gym admission. $ 1.00 Admission to open carnivals/events $ 0.00 Admission to dances Square Dance 1 $ ? Square Dance 2 • $ ? Dance 1 $ 35.00 Dance 2 $ 35.00 Dance 3 • $35.00 Dance 4 • $ 35.00 Room rentals ** $10./hour, min.3 hours • • Gym.rentals—practice, games ** $15./hour, min 2 hours Gym rentals— events, dances .** $100.00 Rental of Western Dance Hall Now Handled by WDH Recreation classes different each Class 18 • • • . : • . . • • • 7. Outdoor Playground $ 20.00 . .", 8. Trips Seniors, teens, etc different each trip 9. Preschool Class 1 $ 45.00 Class .2 $ 45.00 • • Class 3 $ 45.00 Class 4 $ 45.00 10. Camps . Day camp 1 $ 80:00 Day camp 2 $ 80.00 Day camp 3 $ 80.00 • Day camp 4 • $ 80.00 Day camp 5 $ 80.00 Day camp 6 $ 80.00 • Skyhawks camp 1 $ 93.00 • Skyhawks carnp 2 $ 93.00 • .Skyhawks camp 3 0 $ 93.00 • Skyhawks camp 4 - $ 93.00 • Skyhawks camp 5 • $ 93.00 (;...) • • Skyhawks camp 6 $ 83.00 - Skyhawks •s camp 7 $ 83.00 • Includes administrative'fee ( $30.), refuse fee($50.), additional staff preparation and/or additional tables/benches. ** • Subject to revisitation as we acquire more data on the use of our facilities: • • 19 Peso/w`+;o n wo• Os - o a./ City of SPOKANE VALLEY EX EMIT 13 ANNUAL FIRE CODE FEES FOR MATERIALS DEFINED BY THE FIRE CODE FOR PERMITS TO MAINTAIN, STORE, USE OR HANDLE MATERIALS OR CONDUCT PROCESSES WHICH PRODUCE CONDITIONS HAZARDOUS TO LIFE AND PROPERTY. - Attachment A to the fee schedule adopted by the City Council of the City of Spokane Valley No permit or fee shall be required for the use of candles in ceremonies by non- profit organizations. (State RCW) The following categories of operations may or may not require a permit depending on the determination of the Building Official or the Fire Marshal. Annual Fee 1. Aerosol Products (in excess of 500 pounds) $ 95.00 2. Aircraft Refueling Vehicles S95.00ca. • 3. Aircraft Repair hanger $105.00 4. Asbestos removal • • $ 85.00 5. Automobile wrecking yard $ 95.00 6. Battery systems using lead acid batteries $ 95 00 7. Bowling pin or alley refinishing $ 95.00 8. Carnivals and fairs $124.00 9. Cellulose nitrate film handling and storage (in excess of 25 pounds) $105.00 10. Combustible fiber storage(in excess of 100 cubic feet) S 85.00 11. Combustible material storage(in excess of 2,500 cubic feet) S105.00 . 12. Compressed gases (in excess of table 105-A) S124.00 S-VFEEb 14. Cryogens (in excess of table 105-B) $124.00 15. Dry cleaning plants using hazardous solvents $105.00 16. Dust Producing operations $105.00 17. Explosives or blasting agents (use of) S 95.00 18. Fireworks (see Main fee schedule) $100.00 19. Flammable or combustible liquids $145.00 a residential fuel tanks $ 20.00 20. Fruit ripening $124.00 21. Fumigation or thermal insecticidal fogging. $ 90.00 22. Hazardous materials $124.00' 23. High piles combustible storage $124.00 24. Hot work operations (welding and cutting) $ 90.00 25. Liquefied petroleum gases - commercial $124.00 26. Liquid or gas fueled vehicles or equipment in assembly areas $ 90.00 27. Lumber. yards $ 90.00 28. Magnesium working (in excess of l 0 pounds per day) $ 90.00 29.. Mall, covered (certain uses) (i.e.; vehicle parking, open flame use, display booths) S 95.00 30. Organic coating manufacture $ 90.00 31. Ovens; industrial baking or drying $ 75.00 32. Parade Floats N I A 33. Places of assembly - commercial $ 75.00 non-profit $ 15.00 34. Pyrotechnical special effects material S 90.00 2 of 3 35. Radioactive materials $ 95.00 36. Refrigeration equipment(regulated by article 63) S 75.00 37 Rifle Ranges S 90.00 38. Repair. Garages S 90.00 39. Spraying or dipping S 90.00 40. Special reinspection fee for any permit $ 47.00 41. Temporary membrane structures, tents, or canopies . $145.00 43. Tire storage(in excess of 1,000 cubic feet) S 90.00 3of3 • •