Loading...
12-122.00 Shamrock Paving: Evergreen Reconstructionp"01 ape ,;oOValley- DEPARTMENT OF PUBLIC WORKS CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 12-009 PROJECT: Evergreen Rd Reconstruction Project CONTRACT DATE: 5/16/2012 CONTRACTOR: Shamrock Paving, Inc CHANGE ORDER. NO: Al CAPITAL IMPROVEMENT PROJECT NO: 0160 BID NO,: 12-009 DESCRIPTION OF CHANGES This Change Order pays for following miscellaneous work under WSDOT Force Account procedures for labor, equipment and materials: 1- Lowering 27th Avenue culvert - 2 hours 2 - Lowering Storm Drain piping SD 0, SDI, SD2 & SD3,12 Inches - 4 hours 3 -24th Avenue Curb Restaking -2 hrs . 4 - CenturyLink Phone Line lowering Evergreen Rd -Sta 59 +80 RT to -Sta 61 +65 RT- 8 hrs Shamrock Paving, ina agrees, by signing this document, that It is due no additional monetary compensation beyond the force account amount associated with the time granted by this Change Order. The change order grants 2 additional days. Item No Descrwtion Unit Quantity Unit Price Total CO Al -1 F. A. Cost to lower 27th Ave Culvert (2 hrs) Est 1 $1,000.00 $1,000.00 CO Al -2 F. A. Cost to tower Storm Drains 800, 1, 2, & 3 (4 hrs) Est 1 $3,000,00 $3,000.00 00 A1-3 24th Avenue Curb Staking (2 hrs) LS 1 $0,00 $0.00 COA1 -4 Century Link Phone Lowering (8 hrs) LS 1 $0.00 00 -Total-Amount of this-Change Order(incL-Tax); $4-,000:00 SUBSTANTIAL COMPLETION Original Date: 8/23/2012 Prior to this Change Order: 8/2312012 Including this Change Order. 8!3112012 Original Working Days; 45 Working Days Added by this CO: 2 Working Days Including this CO: 53 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT _ _ _ _ $ 1,503,303.67 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT.__ „ „ „„ _ .$ 8,055.29 TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER _ m _ S 1,508,358.96 NET THIS CHANGE ORDER $ 4,000.00 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 1,512,358.96 CONTRACTOR ACCEPTANCE: DATE: The contractor hereby accepts this ad)ustmeht under the terms of tha original contract far all work perfumed. oeo RECOMMENDED BY: r DATE: 613v APPROVED BY: DATE; Pld Mrks Director APPROVED BY: DATE: City Manager ATTACHMENT&. D/strtbutfon: ' ORIGINALS T0: Contractor, City of Spokane Valley Clerk's Office, PW Project File CAPiES TO PW Pro act File PAW (9126M07) k ” I'Z- l22 Craig Aldworth From: Craig Aldworth Sent: Monday, August 13, 2012 4:45 PM To: 'Scott Willms' Cc: 'Tim Hurley; Amanda Anderson Subject: Evergreen Recon - Request to lower Storm drain System inverts 1.0 foot at 32nd & Evergreen Attachments: Evergreen Recon - Storm Drain invert Revisions 8- 13- 12.pdf Scott This morning at 9:00 AM I directed Jeff Kerr of Murphy Brothers to lower the inverts of Storm Drain pipes SD), SD1, SD2 and SD3. See the attached portion of Sheet 10. This will allow the upstream invert of SD Pipe 0 to mesh with the new ditch on the west side of Evergreen Rd. Jeffs crew had already installed the last stick of SD3 and grouted it into existing Drywell 2. 1 agreed to pay for the revised work by Force Account procedures that will include manhours and equipment cost to A) remove and relay SD 3 ; brick and mortar the old core hole; place the new SD3 outfall in the body of Drywell 2; furnish and install 12 inch collars at CBI, CB2 and CB 3. Craig Aldworth Project Engineer 720 -5001 .ND GRATE It' RT TYPE 'C' CURB AP STA 62 +01.21, 24' L�- w�-w�. -� SD O RT p�v FORM 3124 S. BOLIVAR 45263.5210 \ e TYPE 'C' CURB — \ 12 Pc STA 62 +52.02, 24' RT \ K SEE SHEET 11 .A. Id 2 10" DI TYPE 'C' CURB 4 SD 1 12 3 PT ASPHALT 10" DI ( 32ND STA 70+55.90, DRIVEWAY 1 I 24' LT AREA -317 A SO 3 \ 16 Col 1 10" DI I COSV STD PLAN S -121 16 OCSV STD PLAN S- 121 W/RECTANGULAR FRAME 12 -BEGIN N j 2 W/RECTANGULAR FRAME AND GRATE. TYPE 'C' CU B � c n AND, GRATE. I I W/ SPILL. CONTROL Q STA 61 +51.2 ' °- CI RIM= 2016.47 1 SEPERATOR 18' LT \ + STA 62 +70.39, MOVE 3.5' RIM - 2016.34 4 \ < m 29'24' RT NORTH 32ND STA 70+55.90, 23.15' LT a a EXISTIN DR LL 12 N 13815 E. 32ND 7 RIM = 2017.37 o cap 45274.1221 1 INSTALL HMA OVERLAY a 32ND STA 70 +20, 10 SPILLWAY 22.34' LT ......... ......... ......... ..... ......... .......... .....� I..... ......... ...... .. ....a j ........ .......:. ..... .1. J. K. t, •.i...... ......... . . . . . . ¢ • 4 4- - REC NSTRUCTION: . . . • . . . . . . . . . . . . . . .. ......... . . . . . . . . . 8' If dF 2040 . . . . . . . . . . . . . . . . . . . SE : . .LINE . . . . . . . ��'lu1J ITF- Sf'l��i� f0 moc crucni u F �k PIPE INVERT EL(IN) INVERTEL.(OUT) GRADE LENGTH SD O 2e)14.8? 201'-1. I q 0.0119 53" SDI ZOILN09 Za13,5 .0.0100 51' SD2 Zo13,lf8 2o13.2S 0.0082 28' 0015,16 ,2O1Z,�] j00133 36' SD 3 iNVEdr,T5 LoWF�� l,tl 4j-13 1ZiG.A�dw CATCH WITH F FRAME GRATE 2' MIN. ` 4" MIN. 4 = •_47 SHAMROCK- PAVING- INC. 'QUALITY PAVES OUR FUTURE' N. 110 .HAYFORD ROAD P.O. SOX 19263 SPOKANE, WA 99219 -9263 (509) 244 -2800 FAX (509) .244 -2949 August 29, 2012 Craig.Aldworth, P.-E. City of Spokane Valley 11707.Fast.Sprague Avenue, Suite 106' Spokane Valley, WA 99206 RE:- shallow phone line on 31st and Evergreen Contractors Reg # SHAMRPC090LM Craig, On August 22, 2012, we uncovered a shallow phone line in the sub- grade. Ryan Kelly, our Project Manager.began making phone calls to get ]t taken care of. The line was lowered to the proper depth on August 27, 2.012 at 5:00 p:m. This slowed our operations and at times completely stopped'our trucks from entering the job site i nd prevented our grade crews from working. We are.requesting additional days 'be added to our contract because of this ynforoseen condition. Sincerely, . Scott 1Nillms General .Manager