Loading...
12-137.00 WSDOT Sidewalk Infill Phase 1AGENCY U VIMI I M&O I staft .,gin Local Agency Agreement Supplement Agency Supplement Number City of Spokane Valley 2 Federal Aid Project Number Agreement Number CFDA No. 20.205 CM -9932 040 LA -7578 (Catalog of Federal Domestic Assistance The Local Agency requests to supplement the agreement entered into and executed on 9/14/2011 All provisions in the basic agreement remain in effect except as modified by this supplement. The changes to the agreement are as follows: Project Description Name Sidewalk Infill Project - Phase 1 Termini Various Description of Work ® No Change Length 1 Mile Phase 1 of the project includes construction of sidewalk and restriping to include a bike lane on Pines Road from 16th Ave to 23rd. Phase 2 of the project will include Sidewalk extensions on Farr Road and Perrine Road along with the six bus shelter pads. Reason for Supplement Requesting an increase in construction funds for phase 1 based off of the bid tabs. Does this change require additional Right of Way or Easements? ❑ Yes ® No Type of Work yp Estimate of Funding (1) Previous A reement/Su I. (2) Supplement (3) Estimated Total Pro'ect Funds (4) Estimated Agency Funds (5) Estimated Federal Funds PE a. Agency 99,5 0.00 99 500.00 19 900.00 79 600.00 80 0/0 b. Other 14,019.00 14 019.00 14 019.00 c. Other Federal Aid Participation d. State 1,000.00 1,000.00 200.00 800.00 Ratio for PE e. Total PE Cost Estimate (a +b +c +d) 114 519.00 114,519.00 34,119.00 80,400.00 Right of Way f. Agency 80 % .Other Federal Aid h. Other Participation Ratio for RW i. State J. Total RNV Cost Estimate (f +g +h +i) Construction k. Contract 313 796.00 62 043.00 375 839.00 75 168.00 300 671.00 I. Other 116 826.00 52 629.00 169 455.00 169,455.00 m. Other 80 % Federal Aid n. Other Participation o.Agency 42 790.00 8,461.00 51 251.00 10,250.00 41 000.00 Ratio for CN . State 1,000.00 1,000.00 200.00 800.00 g. Total CN Cost Estimate k+l+m+n+o 474 412.00 123 133.00 597 545.00 255 073.00 342t471.00 r. Total Project Cost Estimate e ' The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Official Washing on Sta =e De artment of Transportation BY BY Title 1�U/3L l irC%�✓Lrt S ��/Z �G% T,� Director of Highways and Local Programs Date Executed DOT Form 140 -041 EF Revised 03/2011 SEP 2 4 1012 co12 -i37