12-152.00 WM Winkler: Sidewalk Infill Ph 1S py /� ..;wOValleye Memorandum Public Works Department Capital Improvement Program 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhatt@spokanevalley.org Date: October 9, 2012 To: Steve Worley, Eric Guth From: a uk A�+nsd Re: Change Order 1 for Sidewalk Infill Project, CIP 0149 Budget Account No. 303.303.149.595.61.63.00 WM Winkler Company Contract #12-023 Change Order 1 makes a minor change to the specification at no cost or additional time. The original hydroseeding specification stated "Seed shall be `Dryland Mix' by Raineer Seeds or approved equal." This is no longer allowed in specifications for federally funded projects. The engineer must name at least 3 suppliers with the option for an approved equal or not specify any supplier. This change would normally be done by a contract clarification but WSDOT's local programs office is requiring that a change order be completed. Original Contract amount = Previous Change Order Cost = Change Order #1 Cost = Project Cost including Change Order #A1= 15% of Original Contract amount = Max Public Works Director Contract authority = Change Order Cost to date = Remaining P.W. Director Contract Authority after CO #Al Public �� orks Director Cc: City Manager Finance Department CC �.� roject Manager $477,235.50 $0 $477,235.50 $71,585.25 $71,585.25 $71,585.25 � ;�. Spo - 4� Kane Valley DEPARTMENT OF PUBLIC WORKS CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 12 - 023 PROJECT: Sidewalk.lnfill Project - Phase 1 CONTRACT DATE: 10/2/2012 CONTRACTOR: WM Winkler Company CHANGE ORDER NO: Al CAPITAL IMPROVEMENT PROJECT NO: 149 BID NO.: 12 -023 DESCRIPTION OF CHANGES This Change Order modifies the specification languange as shown on the attached Sheet 161 of the specifications. WM Winkler Company. agrees, by signing this document, that it is due no additional monetary compensation associated with this Change Order. Item No Description Unit Quantily Unit Price Total CO Al Miscellaneous Hydroseeding Specification Modifications LS 1 $0.00 $0.00 8.7% Tax $0.00 Total Amount of this Change Order( Incl. Tax): $0.00 SUBSTANTIAL COMPLETION Original Date: 11/9/2012 Prior to this Change Order: 11/912012 Including this Change Order: 11/9/2012 Original Working Days: 30 Working Days Added by this CO: 0 Working Days including this CO: 30 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $ 477,235.50 ... . . .................................... ..... ....................................................... ............................... TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 0.00 .................. ............................... TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ 477,235.50 NET THIS CHANGE ORDER $ 0.00 .................................. . ............ . ................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 477,235.50 CONTRACTOR ACCEPTANCE: - ;�� DATE: Io 8 ?A1RL The contractor hereby accepts this adjustmen under the t s of the original contract for all work perfomed. RECOMMENDED BY: APPROVED BY: 64AUaaaer PI-ID ATTACHMENTS: Revised Specification Distribution: DATE: 2(� DATE: U ( l ORIGINALS TO: Contractor, City of Spokane Valley Clerk's Office, PW Project File COPIES TO: PW Project File PRublic WofWPurchaing/CO (9/26/2007) 1 DIVISION 8 MISCELLANEOUS CONSTRUCTION 2 3 SECTION 8 -01 EROSION CONTROL AND WATER POLLUTION CONTROL 4 5 8- 01.3(2)B Seeding and Fertilizing Materials 6 7 Add the following: 8 9 10 11 12 Dryland Seed Mixture 13 14 1. Sheep Fescue 35% 15 2. Hard Fescue 35% 16 3. Armadillo Hybrid Bluegrass 20% 17 4. Perennial Ryegrass 10% 18 19 20 Mulching Material: at 2500 lbs. per acre for hydroseeding operations. 21 22 23 Water: Clean, fresh and free of substances or matter which could inhibit vigorous 24 growth of grass. 25 26 Herbicide: Prohibited from use on any part of this project. 27 28 Tackifier: at 50 lbs. per acre. 29 30 Dryland Seedmix: Seed shall be applied within the following windows only: 31 Spring Seeding: February 15 to March 15 32 Fall Seeding: September 15 to November 1 33 34 Hydroseeding: 35 • Apply seeded slurry with a hydraulic seeder at a rate of 7 lbs per 1000 sq ft 36 evenly in two intersecting directions. 37 • Mulch /tackifier to be applied as part of the slurry mix, and shall be applied to a 38 thickness of 1/8 inches. Maintain clear of shrubs and trees. 39 • Apply water with a fine spray immediately after each area has been mulched. 40 41 8 -01.4 Measurement 42 43 (March 1, 2008 COSV GSP) 44 Add the following: 45 46 "Erosion Control" Will not be measured for payment 47 48 "Seeding, Fertilizing and Mulching" shall be measured by the square yard. 49 City of Spokane Valley Sidewalk Infill Project — Phase 1 161 SVPW Bid No 12 -023