12-200.00 Spokane Rock Products: 2012 Street PreservationSic. ` ' . Va11 ''•7 CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 12-017 DEPARTMENT OF PUBLIC WORKS PROJECT: 2012 Street Preservation Project - Phase 1 CONTRACT DATE: 6/2912012 CONTRACTOR: Spokane Rock Products, Inc CHANGE ORDER NO: 7 CAPITAL IMPROVEMENT PROJECT NO: 0160 BID NO.: 12 -017 DESCRIPTION OF CHANGES This Change Order pays for additional arrow boards and additional traffc control supervisor days. Item No Descrlatlon 1 Quan Unit IQW Sch C - 49 ARROW BOARD DAY 30 $35.00 $1,050.00 Sch C - 60 ADDITIONAL TRAFFIC CONTROL SUPERVISOR DAY 4 $256.00 $1.024,00 Total Amount of this Change Order ( Incl. Tax): $2,074.00 SUBSTANTIAL COMPLETION Original Date: 8/24/2012 Prior to this Change Order. 9/5f2012 Including this Change Order. 9/512012 Original Working Days: 26 Working Days Added by this CO: 0 Working Days including this CO: 3C THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT....._._._... ._...._...._ ................... ...... ......................... ».,... ,. ........ 630,799.53 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT « ». « __.... „ « « «»,„ . ».« , $ 91,415.90 TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER « «.».M. - $ 722,216.43 NET THIS CHANGE ORDER »«» ««», » „»»„»„»„ „» „»„ S 2,074.00 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 724,269.43 CONTRACTOR ACCEPTANCE: k ) •ET L The contractor hereby accepts this adjustment under the terms of the original RECOMMENDED BY: APPROVED BY: APPROVED BY: all work perfomed. ATTACHMENTS: CO 7 Cates DATE: 1 LZJ” DATE: /Z -6• 17— DATE: DATE: DlsfdbWon: ORIGINALS TO: Contractor, City of Spokane Valley Clerk's Office, PW Project File COPIES TO: PW Project File PRat cwaha utchai,stcoM6=7) W11-'Loo AONI S�'kan' ooValleyi DEPARTMENT OF PUBLIC WORKS DESCRIPTION .. C :2 /t► rW -9-4 019! S PSOJECTNO,-�j 2t�,� CALL. BY: G ,AL WOZ6114- DATE: '! 2-., s-, ) CHECKED BY; DATE: SHEET; NOTES: cc)? -,sca C- 4. An-ow Board Payment -- P4 z- t I - 191, I Z I.7 Z'* -5 The City will pay for arrow boards in advance of sidewalk shoulder work on University. Special Provision Section 107.23(1) required that "During sidewalk work the signal will remain in operation with traflic control using shoulder. olosure traffio control measures." Since a lane had to be closed for the sidewalk work on University the arrow board requirement was not included in the bid. Ploase break out the days an arrow boards were placed on University. The City will notpay for arrow boards In advance of work on Dishman -h ioa, Special Provision Section 1-07.23(l) required that "North of Schafer to 1611: Two lanes, one in each direction, shall be maintained at all times. " Sequential Arrow signs are required under Standard Plans K-26.20-00, K 30,40 -01, K- 32.20 -00, K 60,40 -00 (bound'in the Conimot documents), in advance of situations where the work area removes a vehicle travel lane, When an arrow board vas used to warn of a lane closure on Dishman -Mica, the requirement for an arrow board was shown lathe Contract documents and no additional payment will be made. 10 A9- GM es -OP -7 /z,�,l I z �w4 6�,T- 60-L-y rtitv�v►c wvru�- -7 - Z ?- I }�L cl •-�D P(- tj�llvF3lt?� j ' �ISI+I�•rC -!� 1M` � OYV - ��Tir3 V ` J I -z- t}lir 7i 5 i� r inJ GtIJI $ 5 . r z- Pt-Arc4t'-, M,l 5 , 4-0�' v - 41 , 27, Z B, 2,r113d L3 'ly? t "5- b AM 5 , ��bA z - 4/1 o o Ga -7 A-01Arw 13 � � Spokane Traffic Control, Inc. Mike &Tammy Beggs 7415 N Drumheller Street Spokane, WA 99208 Phone 509 - 951 -7341 Fax 509 - 325 -7341 M.SAX§02 864 & 0x74 To: �S / a �2I! . Le i Invoice Date Invoice # la Project Quantity Unit DeserlOtion Unit rotof PrIcae _ -_ y ,�/ a 2 flout- sr'o 4�4 '4� L-LI N C TOTAL $ MoA) .•"2 -30- Ia tug "4'S -i -� !7, %off. F're.i Sf -3- t� - ,-I Ac" - SP�-c�i— �3��2�1R.5 F oaI -5Pb �' tars �11aG- --SRim zl s LEA G - dr• - •5 a: Acts -rA . Sett T•cs- AQAGL)#x►c13 ILI SAS Ftkc. -S{"a1 ei 1311 1 -30 -tai` -Yk&'7 - :q,f"l1 �r S PST' f gas -Mu - i .cn-,SPo-� ^ it W. 'MU-1 A 3- 26 YEARS EXPERIENCE- EXCELLENT Safety Record j THANK YOU FOR YOUR BUSINESS! i { pa 0e DEPARTMENT OF PUBLIC WORKS S S ,,;of Valley- DESCRIPTION„ ,.il� - ,v_ PROJECTNO.: 6( ( lJ1i? CALC. BY: C- 14-6W I1M' DATE: 17- * S' i G- TITLE'.-4 z �5r. CHECKED BYLL— DATE SHEET: 60-?- T )Vp1 �-I f G '. Ab i>M OnOf z - `fR*r-Fl e /- -Ptiz- j1-14-1Z trkTa -SO 464 c,/�w� 6. Extra Payment for TCS for extra contract days I agree that additional payment for the TCS is appropriate for 4 additional days. Schedule A Temporary traffic control, Lump Sum= $1,800 Schedule B Temporary traffic control, Lump Sum = $1,800 Schedule C Temporary traffic control, Lump Sum =$2,8-00 Total Temporary Traffic Control Lump sum bid - $6,400 Total Original Contraot working days = 25 Temporary Traffio Control Cost per working day = $6,400/ 25 days = $256 /day Additional Compensation = 4 days x $256 /day = $1,024, �i t Field Note Record (Sketch) Project No.t��. ROW Data Work Completed. ` contractor lnapector rtlt c�T` Calculated By Checked By Station M -�r2 X � s �d0 oc A 0 tox�� r❑ Nam 1 I (a.cico ua� (o, oo wAa-0, . ( I 'UO.k ) Item No. Item Units Ownfl[[y asso ae a tie ence P..lpublle Workel0epftal PecieftStreet Project0162 - Preservation Projects 201210ansbuctlon AdmblsUallonlPhaso 11Pey Eallmateffog Seal Face Account Spreadsheet C. Aidworth � -�- 1d/17/2012 P� Valley 2012 Street Preservation Project - Phase 1 ,;oO Fog Sealing Force Account Spreadsheet For Traffic Control - Schedule C - 46 SUB CONTRACTOR "BOR Prey. Wage Rate inc. PA Labor Total Labor Trade Name Dale No. of Hours Tinge FICA/FUTAOUTA L &I' Rate 29% P &O Rate Total LeW Cott Flagger Ryan M -STC 23-Aug 4.6 31.01 3.31 1.89 36.21 10.60 46.71 210.20 Flagger RyanM -STC 28 -Aug 7 31.01 3.31 1189 36.21 10.60 46.71 328.08 Flagger Ryan M - STC 5 -Sap 6 31101 3.31 1.68 38.21 10.60 46.71 233.65 Flagger Dennis 0 • STC &•Sep 8 31.01 3.31 1.89 36.21 10.60 4e.71 x@0.27 Subcontractor Labor Total 1,051.00 12% Prima Markup 126.12 Total Labor Cost 1,177.11 SUB CONTRACTOR EQUIPMENT Total EQ Total Equipment Equipment Item No, Units Unit Qty Unit Type Unit Cost 210A P &O Rate Coil F250 Ford Truck STC 23-Aug 1 4.5 HR 13.34 2.00 16.14 72.64 F250 Ford Truk STC 28 -Aug 1 7.45 HR 13.34 2.00 16.14 121.06 F260 Fond Truck STC 5 -Sep 1 6 HR 13.34 2.00 16.14 96.86 Cones STC 23 -Aug 115 0.6 DAY 0.60 0.11 0.61 34.79 Cones STC 28 -Aug 230 1 DAY 0.60 0.11 0.81 139.16 Cones STC &Sep 45 1 DAY 0.60 0.11 0.01 27.23 No ParkSlgns STC 6 -Sep 12 2 DAY 0,26 0.05 0.30 Ln Subcontractor EQ Total 488.87 12% Prime Markup 59.08 Subcontractor Eq Cost 668.84 Total FA Cost 1,736.26