Loading...
13-035.00 Sargent Engineers: Bridge 4507 Deck Resurfacing�rT 4aOG riti ERE�? s Formal Task Assignment Document Task Number 001 The general provisions and clauses of Agreement A] 3102.000 shall be in full force and effect for this Task Assignment Location of Project: City of Spokane Valley, WA Project Title: Bridges 4507 Deck Resurfacing Maximum Amount Payable this Task Assignment: Current hourly rates to a maximum of $4,800.00. Completion Date: 03/29/2012 Description of Work: (Note attachments and give brief description) • Provide initial budgetary level cost estimate to the City. • Provide the technical Special Provisions, review City front end specifications, provide Final Plans and Estimate for removing and replacing the existing LMC overlay on the bridge. • A traffic control plan is not included in this scope of work. Traffic control would be the responsibility of the contractor similar to the bridge joint replacement projects. • Once the contract documents are complete, we will seal the documents. The City will perform the following tasks. • Provide original plans of the bridges. • Provide "front -end" specifications. • Conduct bidding. • Conduct construction administration. Agency Approving Authority: � Date: 2121 3 Printed Name/Title:iG Consultant Signature: 45 Z Date: 1 Martin / Principal DOT Form 140 -089 EF Formal Task Assignment Revised 6/05 C-0I3`0:3 S SA RGENT Sargent Engineers, Inc. 320 Ronlee Lane NW Olympia, Washington 98502 -9241 Tel 360 867 -9284 Fax 360 867 -9318 www.sargentengineers.com February 8, 2013 Mr. Pete Fisch City of Spokane Valley - Public Works 11707 E. Sprague, Suite 106 Spokane Valley, WA 99206 RE: Bridges 4507 Surface Repair Project Project No.: A13102.001 Dear Mr. Fisch: You have asked us to develop the plans, technical specials, and estimates for the deck resurfacing of Bridge 4507. You plan on hydro - milling to remove the existing latex modified concrete (LMC) on the decks of the bridge and placing a new LMC overlay. Scope of Work You have asked us to assist you with this project. Our scope of work includes the following items: • Provide the technical Special Provisions, review City front end specifications, provide Plans, and Estimate for removing and replacing the existing LMC overlay on the bridge. • A traffic control plan is not included in this scope of work. Traffic control would be the responsibility of the contractor similar to the bridge joint replacement projects we completed previously. • Once the contract documents are complete, we will seal the documents. City Scope of Work The City will perform the following tasks. • Provide original plans of the bridges. • Provide "front -end" specifications. • Conduct bidding. • Conduct construction administration. Consultant Fee We estimate that the maximum fee that we will expend is approximately $4,800 as detailed below: SA* RCEM Mr. Pete Fisch Page 2 February 8, 2013 City of Spokane Valley - Bridge 4507 Mill and Overlay Engineering Services Proposal Senior Senior Project Project Design Principal Engineer Engineer Engineer Engineer Drafterli Clerical Task Cost Rate: $153.51 $127.93 $121.53 $110.34 1 $87.95 $83.15 $65.56 1. Coordination with City 4. .1.014 2. Specials 2 8 $1,126 3. Drawings _ 1 4 12 $1,561 4. Estimate 1 4, $563 ; 5. Checking and Final Coordination of Documents 1; 4 4 $927. Sub -Total 5 0 4 20 0 16 0 $4.791 Total Direct Salary Cost 5 0 4 20 0 16 0 $4,791 Direct Costs (for site visit) Mileage (0 trips @ 700 miles ea. @ $0.565 per mile) $0.00 Per Diem (0 days @ $146 /day) $0.00 Subconsultants $0.00 Total Direct Costs $0 Total - Bridge Mill and Overlay $4,791 We look forward to assisting you with this project. Please call if you need anything else. Sincerely, Sargent Engineers, Inc. Erik C. Martin Principal ECM PAUF les\A13102.0014507 Overlay\Correspondence\Bridge Ovedays.docx S pskace�� ILliv) Public Works Department Capital Improvement Program a ey 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhatt@spokanevalley.org Memorandum Date: February 25, 2013 To: Eric Guth, P.E., Public Works Director From: Pete Fisch, Engineering Tech. P17 I IX J Re: SVPW Contract #13 -006, On -Call Bridge and Structural Consulting Services with Sargent Engineers, Inc. — Task 1: Bridge #4507 Surface Repair Project In November, 2012, the City received a Federal grant for $286,142 to resurface the Sullivan SB Bridge over the UPRR. The City has an On -Call Consultant Contract with Sargent Engineers, Inc. for Bridge and Structural Consulting Services for an amount up to $80,000. We would like to issue the attached Task Order 1 for assistance in preparing the bid package for the Sullivan Bridge Resurfacing work. The Project Scope includes hydro - milling the deck surface to remove the existing latex modified concrete (LMC) and placing a new LMC overlay. The attached Task Order 1 in the amount of $4,791 will include technical Special Provisions, Plans, and an estimate for removing and replacing the existing LMC overlay on the bridge. Sargent Engineers, Inc. will also review the City of Spokane Valley front end specifications. With approval of this Task Order 1 work, the total remaining amount in the on -call contract is $75,209. On -Call Contract with Sargent Engineers, Inc. $80,000 Task Order 1 $4,791 Remaining Contract Amount $75,209 Recommend execution of this Task Assignment. Bridge #4507 Existing bridge surface