13-064.00 CH2M Hill: Sullivan West Bridge Replacement. lAFashaln
Supplemental Agreement
pp g
Organization and Address
CH2M HILL, INC.
Number 8
717 W. Sprague Avenue, Suite 800
Spokane, WA 99201 -3911
Original Agreement Number
Sullivan Road W Bridge Replacement #0155
Phone: (509) 747 -2000
Project Number
Execution Date
Completion Date
BRM 4103 007
11/8/2011
12/31/2013
Project Title
New Maximum Amount Payable
SULLIVAN ROAD WEST BRIDGE
$ 1,567,262.00
Description of Work
Professional services to revise the Sullivan Park water supply main design to include fire protection service to the
Western Dance Hall facility.
The Local Agency of City of Spokane Valley, Washington
desires to supplement the agreement entered into with CH2M HILL, INC.
and executed on 11/8/2011 and identified as Agreement No. 0155
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 1, SCOPE OF WORK, is hereby changed to read:
�,pe Fxhihit A-] attached
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read: N/A - This is a zero time change supplement
III
Section V, PAYMENT, shall be amended as follows:
C TT^ M HTLL is authorized to use up to %14,296 of the %26,537 management re -erve fiend halanea estahlished biz the original
Agreement and prior Supplemental Ab eements The total Maximum Amnnnt Payable tinder the agre ment is unchanged
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
By: Roger W Flint
r
Consultant Signature
DOT Form 140 -063 EF
Revised 9/2005
By: Fric Giitb, P F.
pproving Authority Signature
0 /i.3
Date
Go ► 3 -o�,, -i
EXHIBIT A -1
Scope of Work for Sullivan Road West Bridge
Replacement - Supplemental Agreement No. 8
City of Spokane Valley, Washington
FHWA Project No. BRM 4103(007)
March 2013
1.0 Introduction
This Supplemental Agreement No. 8 scope of work modifies the scope of CH2M HILL's
professional engineering services and compensation for the Sullivan Park Water Supply Main
design effort, authorized under Task 14.3, Supplemental Agreement No. 4, to include fire
protection service to the Western Dance Hall in Sullivan Park. This modification increases the
size of the proposed water supply main from 4 -inch diameter to 12 -inch diameter which
materially impacts CH2M HILL's level of effort.
Also included herein are additional project management and coordination work to assist the
City of Spokane Valley (City) in making its decision to include fire protection as part of the
project. In addition, the Supplemental. Agreement No. 4 authorization for Task 14.3 did not
include level of effort for design of the bridge- supported portion of the water supply main.
This prior omission is corrected in this Supplemental Agreement No. 8.
Task 14: Miscellaneous Optional Services
14.3 Sullivan Park Water Supply Main
14.3.1 Assistance to Compare 4 -Inch and 12 -Inch Water Main Alternatives
Provide coordination and information as requested to assist the City with its decision pertaining
to fire protection water service for the Western Dance Hall in Sullivan Park. Assistance will
include:
Coordinate with Consolidated Irrigation District No. 19, City Fire Department, and City
staff via email and telephone and review existing fire hydrant flow testing information
to assist with determining the extent of existing fire flow protection at the site and
identifying fire flow needs to meet existing (as of execution of this Supplement) City
standards or code requirements.
Prepare a comparative construction cost estimate for the 4 -inch and 12 -inch diameter
alternatives. Estimate sizes and quantities of features such as vaults, valves, pipe
lengths, and number of hydrants.
Assumption:
• Hydraulic analysis to confirm the 12 -inch diameter pipe size for the fire protection
alternative will be performed by others and is not included under this task.
Deliverables: Comparative cost estimate.
14.3.2 Water Main Design
Prepare revised plans sheets depicting the proposed 12 -inch water supply main instead of a 4-
inch water supply main from the existing water main on the north side of Indiana Avenue at
the Sullivan Road intersection to Sullivan Park and showing fire hydrant locations within
Sullivan Park.
Provide revised details for connection to the existing water main at Indiana Avenue, metering
and backflow prevention facilities, connection to the existing irrigation and domestic water
facilities within Sullivan Park.
Prepare Special Provisions for water main and fire protection elements of the design to
supplement WSDOT /APWA Standard Specifications for Road, Bridge, and Municipal
Construction and incorporate into the bid documents.
Assumptions:
• Fire protection for the Western Dance Hall will include up to two fire hydrants situated
within the area between the east face of the existing Western Dance Hall structure and
Sullivan Road. Locations will be as approved by the City Fire Department.
• No modifications will be made to the interior of the structure.
Deliverables: Revised drawings and Special Provisions at the 90% and 100% levels of
completion.
14.3.3 Bridge - Supported Water Main Design
Prepare plan, profile, and detail drawings for the bridge- supported water main. Evaluate and
design water main structural support system, thermal expansion and contraction provisions,
and freeze protection provisions.
Prepare Special Provisions for bridge- supported water main elements of the design to
supplement WSDOT /APWA Standard Specifications for Road, Bridge, and Municipal
Construction and incorporate into the bid documents.
Drawing List
Anticipated drawings required to detail the bridge- supported water main include:
WS-4 Bridge- Supported Water Main Plan and Profile
WS -5 Bridge- Supported Water Main Details
Assumptions:
• Thermal expansion and contraction evaluation and design will be based on 100 degree
Fahrenheit temperature differential.
• Freeze protection evaluation and design will be based on conditions that include
prolonged periods of no flow in the water main and subfreezing winter season
temperatures normal for the area.
Deliverables: Drawings and Special Provisions at the 90% and 100% levels of completion.
DOCUMENTS EXEMPT FROM PUBLIC DISCLOSURE
The page entitled "Exhibit E -1 / Sullivan Road West Bridge Replacement — Supplement No. 8"
contains confidential cost and rate data and is withheld from public disclosure pursuant to 23
USC 112(2)(F).
Prenotification; confidentiality of data. A recipient of funds requesting or using the cost
and rate data shall notify any affected firm before such request or use. Such data shall be
confidential and shall not be accessible or provided, in whole or in part, to another firm or to any
government agency which is not part of the group of agencies sharing cost data under this
paragraph, except by written permission of the audited firm. If prohibited by law, such cost and
rate data shall not be disclosed under any circumstances.
You may petition for a review of our findings pertaining to any redacted or withheld documents
pursuant to Spokane Valley Municipal Code (SVMC) 2.75.080; and obtain judicial review
pursuant to RCW 42.56.550.