13-087.00 WM Winkler: Sidewalk Infill Ph 1SP af II0 CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 12 -023 DEPARTMENT OF PUBLIC WORKS PROJECT: Sidewalk Infill Project - Phase 1 CHANGE ORDER NO: 4 CONTRACTOR: WM Winkler Company CONTRACT DATE: 101112012 PROJECT NO: 149 PO #: 42961 DESCRIPTION OF CHANGES THE CONSTRUCTION OF THE SIDEWALK AT THE SOUTHEAST CORNER OF 17TH AVENUE AND PINES ROAD HAS BLOCKED SOME O THE NATURAL DRAINAGE PATHWAYS CREATING A PUDDLE AT THE BASE OF THE CURB RAMP. THIS CHANGE ORDER WILL REGRADE AND SHAPE THE AREA ALLOWING IT TO DRAIN. Item No Description Unit Quantity Unit Price Total A -1 RE- MOBILIZATION LS 1 $400.00 $400.00 A -2 CONSTRUCTION SURVEYING LS 1 $320.00 $320.00 A -3 TEMPORARY TRAFFIC CONTROL LS 1 $360.00 $360.00 A -9 REMOVE CURB AND GUTTER LF 30 $8.00 $240.00 A -10 SAWCUT ACP PAVEMENT LF -IN 385 $1.10 $423.50 A -11 REMOVE ASPHALT CONCRETE PAVEMENT SY 105 $10.00 $1,050.00 A -13 ROADWAY EXCAVATION INCLUDING HAUL CY 18 $100.00 $1,800.00 A -17 CRUSHED SURFACING TOP COURSE, 6 -IN DEPTH SY 105 $18.00 $1,890.00 A -18 HMA CL. 1/2" PG 64 -28, 0.25FT DEPTH SY 105 $28.75 $3,018.75 A -19 JOINT ADHESIVE LF 127 $1.25 $158.75 A -30 CEMENT CONCRETE CURB AND 18" C urTE1L LF 30 $16.70 $501.00 Total Amount of this Change Order: $ $10,162.00 SUBSTANTIAL COMPLETION Original Date: 11/9/2012 Prior to this Change Order. 121412012 Including this Change Order. 5/282013 Original Working Days: 34 Working Days Added by this CO: 4 Working Days including this CO: 38 CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $ 477,235.50 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 17,898.10 TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER (through CO# 4) $ 495,133.60 NET THIS TOTAL CONITRACT AMOUNT INCLUDING THIS CHANGE ORDER _ _ _$ 505,295.60 CONTRACTOR ACCEPTANCE: e The contractor hereby accepts this adjustment under 0 of the original contract for all work performed. DATE: -!�_1201/ 3 RECOMMENDED BY: DATE: / LD roject Manager APPROVED BY: DATE: It Eric Guth, Public Works Director APPROVED BY: N/A DATE: Mike Jackson, City Manager ATTACHMENTS: CO#5 Plan Sheet Distribution: ORIGINALS TO: City of Spokane Valley Clerk's Office, Contractor W� -3 `o9-7 9 TY OF11 00901N� OoKane ,,;oOValleyo Memorandum Date: May 20, 2013 To: Steve Worley, Eric Guth From: Erica Amsden EKN Public Works Department Capital Improvement Program 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhatt@spokanevalley.org Re: Change Order 4 for Sidewalk Infill Project, CIP 0149 Budget Account No. 303:303.149.595.30.63.00 WM Winkler Company Contract #12 -023 Change Order 4 corrects a drainage issue at the southeast corner of 17t' Avenue and Pines Road. The Natural Drainage Pathways were blocked and this change order re- grades and reshapes the area allowing it to drain. The total estimated cost (incl. tax) for this Change Order work is $10,162.00, paid for by a CMAQ grant and the City of Spokane Valley. See the attached 2013 Sidewalk Infill Project Spreadsheet. There are sufficient funds in the project budget to cover these costs. Original Contract amount = Previous Change Order Cost = Estimated Change Order 94 Cost (Includes Force Account Work) _ Project Cost including Change Order #4 = 15% of Original Contract amount = Max Public Works Director Contract authority = Change Order Cost to date = Remaining P.W. Director Contract Authority after CO #4 Cc: City Manager Finance Department $477,235.50 $9,498.10 $10,162.00 $496,895.60 0149 - Sidewalk Infill All Activity as of May 20 2013 - 3 �E£i�nd *303 kQriglnai !R6VENiIiS. {BifdRet ! fPrgjec! Adja�ste� (8 dget 'P.lfor Years 20fi ` `ctu " ct , 1 12013 ToiDa fAft�7ai` fActtla , . Avaiablgi E` c rn�eF` €d fFi9ri 3. Fed. -Aid Highway Program (indirect) 572,400.00 636.30 321,620.22 521.54 322,778.06 0.00 249,621.94 EECBG Grant 55,000.00 6,457.31 48,542.69 0.00 55,000.00 0.00 0.00 Project bid documents 0.00 0.00 0.00 0.00 0.00 0.00 0.00 IF Transfer From 302 143,100.00 756.98 101,826.97 93.25 102,677.20 0.00 40,422.80 IF Transfer From 311 131,040.00 0.00 27,042.91 0.00 27,042.91 0.00 103,997.09 IF Transfer From 402 38,415.00 0.00 31,314.07 0.00 31,314.07 0.00 7,100.93 Total Revenue 0.00 939,955.00 7,850.59 530,346.86 614.79 538,812.24 0.00 401,142.76 - "- E$PENDI RES iBud_eet ldusted f, _ i`B et' bears kl12 AiMI, 03 ' 6h& � Tabat6 4Eh' mbered; a- ae`bgna F�Tnd'st Preliminary Engineering Salaries & Wages 62,542.00 5,934.69 39,993.47 6,183.43 52,111.59 0.00 10,430.41 Overtime 0.00 0.00 540.93 0.00 540.93 0.00 - 540.93 Employee Benefits 21,890.00 1,915.90 14,260.95 1,517.58 17,694.43 0.00 4,195.57 FICA/401A OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Medicare OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 L &I OT 0.00 0.00 15.37 0.00 15.37 0.00 -15.37 PERS OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Engineering & Architectural 0.00 0.00 5,386.82 1,439.12 6,825.94 9,174.06 - 16,000.00 Prof. Svcs - Survey 30,000.00 0.00 25,618.94 2,010.95 27,629.89 2,681.29 - 311.18 Prof. Svcs. - Geotech 0.00 0.00 737.68 0.00 737.68 0.00 - 737.68 Advertising 1,500.00 0.00 1,144.40 0.00 1,144.40 0.00 355.60 Printing & Binding 2,500.00 0.00 440.45 0.00 440.45 0.00 2,059.55 Miscellaneous Services 5,000.00 0.00 290.73 0.00 290.73 0.00 4,709.27 PE Contingency 12,343.00 0.00 0.00 0.00 0.00 0.00 12,343.00 Total Prelim. Engineering 0.00 135,775.00 7,850.59 88,429.74 11,151.08 107,431.41 11,855.35 16,488.24 Right of Way Salaries & Wages 6,060.00 0.00 0.00 461.01 461.01 0.00 5,598.99 Employee Benefits 2,121.00 0.00 0.00 80.96 80.96 0.00 2,040.04 FICA/401A OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Medicare OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 L &I OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PERS OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Professional Services 15,000.00 0.00 0.00 517.80 517.80 32,785.30 - 18,303.10 ROW Acquisition 40,000.00 0.00 0.00 0.00 0.00 0.00 40,000.00 RW - Land Improvements 5,000.00 0.00 0.00 0.00 0.00 0.00 5,000.00 RW Contingency 6,819.00 0.00 0.00 0.00 0.00 0.00 6,819.00 Total Right of Way 0.00 75,000.00 0.00 0.00 1,059.77 1,059.77 32,785.30 41,154.93 Construction Construction 105,000.00 0.00 25,424.45 0.00 25,424.45 78,630.55 945.00 Construction - Drainage 38,415.00 0.00 30,119.50 0.00 30,119.50 612.25 7,683.25 Salaries & Wages 40,623.00 0.00 23,539.25 503.05 24,042.30 0.00 16,580.70 Overtime 15,835.00 0.00 3,492.33 0.00 3,492.33 0.00 12,342.67 Employee Benefits 14,218.00 0.00 5,388.24 116.70 5,504.94 0.00 8,713.06 Employee Benefits 0.00 0.00 321.87 0.00 321.87 0.00 - 321.87 Professional Services 0.00 0.00 1,966.23 0.00 1,966.23 0.00 - 1,966.23 Prof. Svcs - Survey 10,000.00 0.00 0.00 0.00 0.00 0.00 10,000.00 Prof. Svcs. Mat. Testing 20,000.00 0.00 12,016.86 0.00 12,016.86 0.00 7,983.14 Advertising 1,500.00 0.00 0.00 0.00 0.00 0.00 1,500.00 Construction 419,149.00 0.00 339,648.39 0.00 339,648.39 25,191.17 54,309.44 CN Contingency 64,440.00 0.00 0.00 0.00 0.00 0.00 64,440.00 Total Construction 0.00 729,180.00 0.00 441,917.12 619.75 442,536.87 104,433.97 182,209.16 Total Expenditures 0.001 939,955.00 7,850.59 530,346.86 12,830.60 551,028.05 149,074.62 239,852.33 LF CURB CHANNEL SHOWN REMOVE CURB AND,,GUTTER AND INSTALL SPILL G RB 8.4 LF STA, 27 +10.20, 18,5' R TC STA. 27 +17.23, 22.67' RTJ PAVEMENT G= 0.006 L=50' FiQ 9 SAWCUT, PATCH AND MATCH CTA i dR R 16:19' RT REMOVE AND INSTALL 9 LF OF CURB AND GUTTER �. CHANNEL STORM WATER AS SHOWN SAWCUT PER N DISTANCE SHOWN ON NOTES: LEGEND. THE PLANS. 3" HMA 1. PROTECT EXISTING SIDEWALK; CURB RAMPS; CURBS AND MODULAR BLOCK WALL. ? >> ACP 2. REGRADE AS SHOW, PLACE 6" CSTC AND COMPACT TO 95% UNDER HMA. 6" COMPACTED CSTC 3. AFTER PLACEMENT OF CSTC, CITY OF FLOW ARROW SPOKANE VALLEY SURVEY REPRESENTATIVES NATIVE SOIL WILL VERIFY GRADING PRIOR TO PAVING. COMPACTED TO 95% OF MODIFIED PROCTOR MAX DENSITY HMA PATCHBACK /WIDENING N TS' is