HomeMy WebLinkAboutResolution 13-006 TIP for 2014-19 CITY OF SPOKANE VALLEY
SPOKANE COUNTY,WASHINGTON
RESOLUTION NO. 13-006
A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY,
WASHINGTON, ADOPTING THE 2014-2019 SIX YEAR TRANSPORTATION
IMPROVEMENT PROGRAM FOR THE CITY OF SPOKANE VALLEY, AND OTHER
MATTERS RELATED THERETO.
WHEREAS, to provide for the proper and necessary development of the street system within the
City of Spokane Valley, the City shall, as required by State law, develop and adopt annually a Six-Year
Transportation Improvement Program ("TIP") with such program acting as a guide for the coordinated
development of the City's transportation system; and
WHEREAS, the TIP of the City shall specifically set forth those projects and programs of both
City and regional significance that benefit the transportation system and promote public safety and
efficient vehicle movements; and
WHEREAS, the Six Year TIP shall be consistent with the City Comprehensive Plan and be
adopted following one or more public hearings before the City Council; and
WHEREAS, a draft copy of the Six Year TIP was submitted to the Washington State Department
of Commerce and has been reviewed and approved prior to the scheduled adoption of the TIP in
accordance with RCW 36.70A.106; and
WHEREAS, the City Council conducted a public hearing on May 28, 2013, for the purpose of
inviting and receiving public comment on the proposed Six Year TIP.
NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane
County, Washington, as follows:
The City Council hereby adopts the attached Six Year TIP for the City of Spokane Valley
for the purpose of guiding the design, development and construction of local and regional
transportation improvements for the years 2014 through 2019. The City Clerk is directed
to file the 2014-2019 Six-Year Transportation Improvement Program with the
Washington State Secretary of Transportation not later than June 30. The TIP shall be
reviewed at least annually for the purpose of determining the work to be accomplished
under the program and the City transportation requirements.
Adopted this l 1`h day of June, 2013. City of Sp k a nl e?'Valley
_I J�
Thomas E. Towey, Mayor
`— 17ristine Bainbridge, City Clerk
Approved as to m:
Office o&.the City Attorney
Resolution 13-006, Adopting Six-Year TIP
Tpolian' e
ey`
City of Spokane Valley
Public Works Department
ro
2014 - 2019 Six Year
Transportation Improvement Program
Resolution 13-006, Adopted on June 11, 2013
Funding Sources:
• ARRA
• BR
• City
• CDBG
• CMAQ
• Developers
• EECBG
• FHWA
• FMSIB
• HUD
• REET
• Other Fed
• Other RR
• Other State
• SP
• SRTS
• SW
• STA
• STP(E)
• STP(U)
• TA
• TIB
• UAP
• UGP
• WSDOT
• WTSC
• WUTC
City of Spokane Valley
Department of Public Works
2014 — 2019 Six-Year
Transportation Improvement Program
Glossary & Abbreviations
American Recovery & Reinvestment Act
Bridge Replacement Program
City Funds
Community Development Block Grant
Congestion Management/Air Quality
Private Developer Funds
Energy Efficiency and Conservation Block Grant
Federal Highway Administration
Freight Mobility Strategic Investment Program
Housing & Urban Development
Real Estate Excise Tax
Misc. Federal Funding Sources
Railroad Funding
Misc. State Funding Sources
TIB Sidewalk Program
Safe Routes to School
City Stormwater Funds
Spokane Transit Authority
Surface Transportation Program (Enhancement)
Surface Transportation Program (Urban)
Transportation Alternatives
Transportation Improvement Board
TIB Urban Arterial Program
TIB Urban Corridor Program
Washington Department of Transportation
Washington Traffic Safety Commission
Washington Utilities & Transportation Commission
Funding Status:
• S Project Funding is Secured
• P Project Funding is Planned. The Most
Probable Funding Sources have been
Identified.
Project Phases:
• PE Preliminary Engineering
• RW Right-of-Way
• CN Construction
Construction Type:
• PCC Portland Cement Concrete
• HMA Hot Mix Asphalt
• ITS Intelligent Transportation System
(Integrated Traffic Signal Control Systems)
Street Functional
Urban:
• 14
• 16
• 17
• 19
Classifications:
Principal Arterial
Minor Arterial
Collector Arterial
Local Access
Project!Description I Current Status
2014 - 2019
Six-Year Transportation Improvement Program
Dollars in Thousands
Length PE RW CN Total
Funding
Sources
2014 2015 2016 2017 2018 2019 Total
Argonne Road-190 to Trent
S
0.38 0 0 582 582 City 79 79
CMAQ 503 503
Revise Signal Phasing,Add NB Right Turn Lane at Montgomery,Intersection Improvements at Knox
Funding Secured(SRTC 06-31),City Project#0060
Project Total 582 582
2 Mission Ave.- Flora Rd.to Barker Rd. (PE/RW) 1 148 400 0 548 City 74 74
S STP(U) 474 474
Reconstruct with curb,sidewalks,bike lanes and stormwater facilities;
PE&RW Funding Secured,(SRTC#09-01) City Project#0123,
Project Total 548 548
3 Spokane Valley-Millwood Trail-SCC to
s Evergreen Rd (PE)
Construct Shared Use Pathway on abandoned Railroad Right-of-way
PE Funded;SRTC#TE10-04;City Project#0145
6.5 440 0 0 440 City
STP(E) 440 440
Project Total 440 440
4 Sullivan 1 Euclid Concrete Intersection (PE)
S
Reconstruct intersection in concrete pavement
Funding secured for PE&RW,(SRTC#09-06);City Project#141
0 53 0 0 52 City 7
STP(U) 45
7
45
Project Total 52 52
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,an
are not intended by the City to be relied upon by property owners or developers in making development decisions.
6/3/2013 Page 1
Project 1 Description/Current Status
2014 - 2019
Six-Year Transportation Improvement Program
Dollars in Thousands
Funding
Length PE RW CN Total Sources
2014 2015 2016 2017 2018 2019 Total
5 Sullivan Road West Bridge
S
Reconstruct and widen west(southbound)bridge
Recv"d FMSIB, BR&TIB grants;City Project#0155
0.08 0 0 16,880 16,880 BR 2,852 2,852 5,704
City 893 893 1,786
FMSIB 1,000 1,000 2,000
Other 1,945 1,945 3,890
Fed
UCP 1,750 1,750 3,500
Project Total 8,440 8,440 16,880
6 Mansfield Ave Connection-Pines (SR-27)to 0.21 0 0 951 951 City 13 13
S 200-ft East of Houk Rd CMAQ
UCP 792 792
Construct 3-lane arterial gap connection from Pines to Houk,w/sidewalk,curb,and stormwater facilities Develop 146 146
ers
PE/RW funded by CMAQ(SRTC#10-12),CN Funded by TIB(#9-E-208(003)-1),City Project#0156
Project Total 951 951
7 Adams St Resurfacing Project-4th to Sprague 0.25 0 0 195 195 City 27 27
S CDBG 168 168
Pavement Resurfacing&ADA upgrades
CDBG Funded;City Project
Project Total 195 195
8 Citywide Traffic Sign Project
S
Replacement of regulatory&warning signs throughout City
QRSP funded,City Project*0181
0
0 0 100 100 City
Other 100 100
Fed
Project Total 100 100
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,an.
are not intended by the City to be relied upon by property owners or developers in making development decisions..
6/3/2013 Page 2
Project 1 Description!Current Status
201 4 - 2019
Six-Year Transportation Improvement Program
Dollars in Thousands
Funding
Length PE RW CN Total Sources 2014 2015 2016 2017 2018 2019 Total
9 SR-27(Pines) &Grace Ave. Intersection Safety
S
Safety Improvements,Add left turn-lane
1-ISIP funded;City Project#0166
0.25 0 0 523 523 City
Other 523 523
Fed
Project Total 523 523
10 Sullivan Road Corridor Traffic Study-1-90 to
s Wellesley
Conceptual Planning for Sullivan Road corridor improvements
STP Funded;City Project#0177
2 80 0 0 80 City 11 11
STP(U) 69 B9
Project Total 80 80
11 2014 Street Preservation Project
P
0 50 0 1,950 2,000 City 2,000 2,000
Euclid Ave Reconstruction-Flora to E City limits;Evergreen Rd Resurfacing-Sprague to Mission;Mullan Rd
Resurfacing-Dishman-Mica to Broadway;Sprague Ave Resurfacing-Vista to Argonne
Project Total 2,000 2,000
12 Appleway Trail Phase 2-University to
p Evergreen (RW&CN)
Construct Shared Use Pathway along abandoned Railroad Right-of-Way
PE funded with City Funds
2
0 0 2,542 2,542 City 343
CIUTAQ 2,199
343
2,199
Project Total 2,542 2,542
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,an
are not intended by the City to be relied upon by property owners or developers in making development decisions.
6/3/2013 Page 3
Valle
y
Project/Description/Current Status
2014 - 2019
Six-Year Transportation Improvement Program
Dollars in Thousands
Funding
Length PE RW CN Total Sources 2014 2015 2016 2017 2018 2019 Total
13 ITS Infill Project, Phase 1
P
0 26 0 302 328 City 4 41 45
CMAQ 22 261 283
Install ITS controllers and fiber along Broadway, University and Argonne/Mullan routes with existing conduit
Project Total 26 302 328
14 Sidewalk Infill Program-Phase 3
P
Complete gaps in sidewalk system throughout City,ADA upgrades
0 38 25 592 655 City 12 7 70 89
CMAQ 75 46 445 566
Project Total 87 53 515 655
15 Sprague Ave Resurfacing-Argonne to Herald 0.6 60 0 665 725 City 98 98
S STP(U) 627 B27
Grind/Overlay;OCI:33.28
STP Funded
Project Total 725 725
16 Sprague Ave Resurfacing-Vista to Argonne
S
Grind/Overlay;OCI:34.04
STP funded
0.5 41 0 629 670 City 91
STP(U) 579
91
579
Project Total 670 670
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,an
are not intended by the City to be relied upon by property owners or developers in making development decisions.
6/3/2013 Page 4
Workane
Project 1 Description/Current Status
2014 - 2019
Six-Year Transportation Improvement Program
Dollars in Thousands
Funding
Length PE RW CM Total Sources 2014 2015 2016 2017 2018 2019 Total
17 2015 Street Preservation Project
P
0 50 0 1,950 2,000 City 2,000 2,000
Dishman-Mica Resurface-Sands to Thorpe;Euclid Ave Recon-West end of City to Sullivan;Flora Rd Recon-Euclid
to Trent;Madison Rd Recon-40th to Thorpe;Mission Ave Resurface-Argonne to Herald;Mullen Rd Resurface-
Broadway to Mission
Project Total
2,000 2,000
18 Appleway Trail Phase 3-Evergreen to Corbin 2.35 214 0 2,860 3,074 City 29 386 415
P CMAQ 185 2,474 2,659
Construct Shared Use Pathway along abandoned Railroad Right-of-Way
Project Total
214 2,860 3,074
19 Appleway Trail Phase 4-University Rd.to
p Balfour Park
Extend Shared Use pathway to Balfour Park
0.5 100 400 700 1,200 City 68 94 162
TA 432 606 1,038
Project Total
500 700 1,200
20 Bowdish Sidewalk-8th to 12th
P
Construct sidewalk along both sides of Bowdish
0.25 64 65 472 601 City 14 68 82
SRTS 83 436 519
Project Total
97 504 601
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,am
are not intended by the City to be relied upon by property owners or developers in making development decisions.
6/3/2013 Page 5
Project 1 Description I Current Status
2014 - 2019
Six-Year Transportation Improvement Program
Dollars in Thousands
Funding
Length PE RW CN Total Sources
2014 2015 2016 2017 2018 2019 Total
21 Mission Ave.- Flora Rd_to Barker Rd. (CN)
1 0 0 3,416 3,416 City 683 683
P UAP 2,733 2,733
Widen&Overlay with curb,sidewalks,bike lanes and stormwater facilities
Project Total 3,416 3,416
22 Park Road#1 Sidewalk Project-Sinto Ave.to 0.44 15 25 416 456 City 5 56 61
p Indiana Ave. SRTS 35 360 395
Construct sidewalk along east side of Park Road from 200-ft S.of Sinto to Indiana Ave.and 165-ft gap on Mission Ave.
east of Park Rd
Project Total 40 416 456
23 Sullivan Corridor ITS-Indiana to Trent(SR 290) 1/5 105 0 809 914 City 14 109 123
P CMAQ 91 700 791
Extend ITS conduit and contols along Sullivan Corridor
Project Total
105 809 914
24 Sullivan Road Resurfacing-Broadway to
s Mission
Grind/Overlay;OCI:32.49
STP Funded
0.17 30 0 0 30 City 4 4
STP(U) 26 26
Project Total
30 30
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,an
are not intended by the City to be relied upon by property owners or developers in making development decisions.
6/3/2013 Page 6
Project/Description 1 Current Status
2014 2019
Six-Year Transportation Improvement Program
Dollars in Thousands
Length PE RW CN Total
Funding
Sources
2014 2015 2016 2017 2018 2019 Total
25 Sullivan Road Resurfacing-Sprague to
s Broadway
Grind/Overlay;OCI:31.2
STP Funded
0.5 52 0 788 840 City 113 113
STP(U) 727 727
Project Total
840 840
26 2016 Street Preservation Project
P
0 50 0 1,950 2,000 City 2,000 2,000
Appleway Blvd Resurface-Vista to Dishman-Mica;Dishman-Mica Rd Resurface-Thorpe to S City limits;Euclid Ave
Recon-Sullivan to Marietta;Farr Rd Recon-4th to 8th;Progress Rd Recon-Wellesley to Crown
Project Total
2,000 2,000
27 Barker Road/BNSF Grade Separation (PE& 0 3,000 1,600 0 4,599 City 101 256 263 620
p RW Only)
Construct Grade Separation at Barker/BNSF RR/Trent(SR290)
FY09 Federal Earmark for$720K million,$10M received from FMSIB for CN phase
Other 180 540 720
Fed
Other 611 1,368 1,049 3,028
Fed
Other- 38 95 98 231
RR
Project Total
750 1,899 1,950 4,599
28 Broadway Improvement Project- Flora to
p Barker
D 543 1,000 4,163 5,706 City 309 833 1,142
Extend Broadway arterial to Barker Rd,Realign Broadway connection east of Barker
UAP
1,234 3,330 4,564
Project Total
1,543 4,163 5,706
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,an
are not intended by the City to be relied upon by property owners or developers in making development decisions.
6/3/2013 Page 7
Walley
Project 1 Description/Current Status
2014 - 2019
Six-Year Transportation Improvement Program
Dollars in Thousands
Funding
Length PE RW CN Total Sources 2014 2015 2016 2017 2018 2019 Total
29 2017 Street Preservation Project
P
0 30 0 1,370 1,400 City 1,400 1,400
Euclid Ave Recon-Marietta to Flora;Evergreen Rd Resurface-I90 to Indiana; Farr Rd Recon-Appleway to 4th;Sprague
Ave Resurface-Flora to Corbin;Sprague Ave Resurface-Park to Vista;Sprague Ave Resurface-Sullivan to Conklin
Project Total
1,400 1,400
30 Barker Rd-Spokane River to Euclid
P
Reconstruct and widen to 3-lane urban section
0.53 378 25 2,899 3,302 City 81 580 661
UAP 322 2,319 2,641
Project Total
403 2,899 3,302
31 Broadway @ Argonne/Mullan Concrete
p Intersections (CN Only)
Reconstruct intersections in concrete pavement
0 0 0 2,110 2,110 City 285 285
STP(U) 1,825 1,825
Project Total
2,110 2,110
32 Park Road#2-Broadway to Indiana(RW&CN) 0.75 0 150 2,877 3,027 City 20 388 408
STP(U) 130 2,489 2,619
Reconstruct to a 3-lane section with curb,sidewalks,bike lanes and stormwater facilities
Project Total
150 2,877 3,027
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,an
are not intended by the City to be relied upon by property owners or developers in making development decisions.
6/3/2013 Page 8
lokane
Project I Description/Current Status
2014 - 2019
Six-Year Transportation Improvement Program
Dollars in Thousands
Length PE RW CN Total
Funding
Sources 2014 2015 2016 2017 2018 2019 Total
33 Sullivan I Euclid Concrete Intersection (RW/CN)
P
Reconstruct intersection in concrete pavement
0
0 0 1,562 1,562 City 211 211
STP(U) 1,351 1,351
Project Total
1,562 1,562
34 2018 Street Preservation Project
P
0 30 0 1,370 1,400 City 1,400 1,400
Project Total
1,400 1,400
35 Argonne Road Concrete Pavement- 1-90 to
p Montgomery
Reconstruct pavement in concrete;OCI:40.35(2012)
0.25 359 0 2,749 3,108 City
359 2,749 3,108
Project Total 359 2,749 3,108
36 Spokane Valley-Millwood Trail-SCC to 6.5 0 100 2,140 2,240 City 14 289 303
p Evergreen Rd (RW&CN) STP(E) 86 1,851 1,937
Construct Shared Use Pathway on abandoned Railroad Right-of-way
Project Total 100 2,140 2,240
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,am
are not intended by the City to be relied upon by property owners or developers in making development decisions.
6/3/2013 Page 9
IlOaxle
4.000Valley
Project I Description I Current Status
2014 - 2019
Six-Year Transportation Improvement Program
Dollars in Thousands
Length PE RW CN Total
Funding
Sources
2014 2015 2016 2017 2018 2019 Total
37 2019 Street Preservation Project
P
0 30 0 1,370 1,400 City
1,400 1,400
Project Total
38 Barker Rd-Euclid to 0.1 mi. S.of Trent Ave 0.75 471 100 0 571 City
P (SR290) UAP
Reconstruct Barker to 3-lane urban section
1,400 1,400
114 114
457 457
Project Total
571 571
Totals: 6,456 3,890 61,882 72,228 17,961 16,037 10,097 11,687 9,585 6,860 72,227
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,an
are not intended by the City to be relied upon by property owners or developers in makang development decisions.
6/3/2013 Page 10
2014 - 2019
Six-Year Transportation Improvement Program
Six-Year Transportation Improvement Program Totals
Secured Projects Planned Projects Totals
Year Federal State Other City Total Federal State Other City Total Federal State Other City Total
2014 $8,325 $3,542 $146 $1,293 $13,306 $2296 $0 $0 $2,359 $4,655 $10,621 $3,542 $146 $3,652 $17,961
2015 $5,550 $2,750 $0 $1,010 $9,310 $1,133 $2,733 $0 $2,861 $6,727 $6,683 $5,483 $0 $3,871 $16,037
2016 $0 $0 $0 $0 $0 $5,632 $1,234 $38 $3,193 $10,097 $5,632 $1234 $38 $3,193 $10,097
2017 $0 $0 $0 SO $0 $4,854 $3,652 $95 $3,086 $11,687 $4,854 $3,652 $95 $3,086 $11,687
2018 $0 $0 $0 $0 $0 $4,164 $2,319 $98 $3,004 $9,585 $4,164 $2,319 $98 $3,004 $9,585
2019 $0 $0 $0 $0 $0 $1,851 $457 SO $4,552 $6,860 $1,851 $457 SO $4,552 $6,860
Total $13,875 $6,292 $146 $2,303 $22,616 $19,930 $10,395 $231 $19,055 $49,611 $33,805 $16,687 $377 $21,358 $72,227
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,an.
are not intended by the City to be relied upon by property owners or developers in making development decisions.
6/3/2013 Page 1
City of Spokane Valley
Department of Public Works
Six-Year TIP Unfunded List
Projects w/No Currently Identified Funding Within Existing Resources
Dollars in Thousands
Project Name Project Description Total Cost
Arterial Improvement Projects
Bowdish Road-16th to Sprague Sprague to 8th:Inlay&Enhancement;8th to 16th:Reconstruct $2,858
as 2-lane section wlcurb,sidewalk,bike lanes and new
stormwater facilities
Bowdish Road-24th to 16th Reconstruct Roadway as 2-lane section wit curb,sidewalk and $2,846
new stormwater facilities;
Bowdish Road-32nd to 24th Reconstruct Roadway as 2-lane section w/curb,sidewalk and $2,637
new stormwater facilities;
Sullivan Road North Extension(Bigelow Reconstruct and widen the Sullivan Road extension north also $55
Gulch) known as Bigelow Gulch Road to a 4-lane roadway with 8-foot
shoulders and a 12-foot two way left turn lane.
Wellesley Realignment @ Barker/SR290 Realign connection of Wellesley to Barker Rd and SR290,3-lane $5,187
section,Part of Barker/BNSF Grade Separation
Bridge Projects
Barker Road 1 BNSF Grade Separation(CN Construct Grade Separation at Barker/BNSF RR/Trent(SR290) $44,500
Only)
Park Road I BNSF Grade Separation Reconstruct Park Road to separate the grades of Park Road and $16,520
the BNSF railroad tracks.
Pines Rd I BNSF Grade Separation Construct grade separation at Pines Rd(SR-27)I Trent Ave(SR $45,000
290)/BNSF RR
Sullivan Rd/BNSF Grade Separation Upgrade and widen grade separation at SullivanfBNSFlTrent $45,000
Improvements (SR290)
Congestion Improvement Projects
Pines Corridor ITS-Sprague to 16th Traffic Signal Control System for Corridor $785
Saltese/Sullivan Traffic Signal Improvements to intersection,Install Traffic Signal(in $586
coordination w/Spokane County)
Sprague I Barker Traffic Signal Install Traffic Signal $594
SR-27(Pines)!Mirabeau Parkway Traffic Install Traffic Signal $575
Signal
Pedestrian/Bicycle Projects
Bowdish Sidewalk-12th to 16th Construct Sidewalk along both sides of Bowdish $557
Greenacres Trail-Sullivan to E City Limits Construct Shared Use Pathway on abandoned railroad right-of-
(RW&CN) way $1,095
Park Road#2 Sidewalk Project-Marietta Ave. Construct sidewalk along one side of Park Road and 160-ft gap
to Buckeye Ave. on north side of Buckeye Ave east of Park Road $143
Projects listed here have been identified as needed projects,but don't currently have funding identified. Funding
for these projects will be pursued as grant opportunities become available.
6!312013 1 of 2
Reconstruction Projects
Sprague/Fancher Concrete Intersection Reconstruct Intersection In concrete pavement $1,572
Sullivan/Kiernan Concrete Intersection Reconstruct Intersection in concrete pavement $1,423
Sullivan/Marietta Concrete Intersection Reconstruct intersection in concrete pavement $1,493
Sprague IThterman Concrete Intersection Reconstruct intersection in concrete pavement $1,243
Sprague/University Concrete Intersection Reconstruct intersection in concrete pavement. $1,660
Sprague/Argonne-Mullan Concrete Reconstruct intersections in concrete pavement $2,342
Intersections
Street Preservation Projects
Pavement Management Program-Local Annual street preservation projects $11,664
Access
$190,335
Projects listed here have been identified as needed projects,but don't currently have funding identified. Funding
for these projects will be pursued as grant opportunities become available.
6/3/2013
2of 2
City of Spokane Valley
Department of Public Works
Six Year Transportation Improvement Program
Projects Listed by Category for the 2014-2019Six-Year TIP
Dollars in Thousands
Arterial Improvements
Project Name Description Start Year City Cost Total Cost
Mission Ave.-Flora Rd.to Barker Reconstruct with curb,sidewalks, 2014 $74 $548
Rd.(PE/RW) bike lanes and stormwater facilities;
Mission Ave.-Flora Rd.to Barker Widen&Overlay with curb, 2015 $683 $3,416
Rd.(CN) sidewalks, bike lanes and
stormwater facilities
Broadway Improvement Project- Extend Broadway arterial to Barker 2016 $1,142 $5,706
Flora to Barker Rd,Realign Broadway connection
east of Barker
Barker Rd-Spokane River to Euclid Reconstruct and widen to 3-lane 2017 $661 $3,302
urban section
Park Road#2-Broadway to Indiana Reconstruct to a 3-lane section with 2017 $408 $3,027
(RW&CN) curb,sidewalks,bike lanes and
stormwater facilities
Barker Rd-Euclid to 0.1 mi.S.of Reconstruct Barker to 3-lane urban 2019 $114 $571
Trent Ave(SR290) section
Total; $3,082 $16,570
Bridge Projects
Project Name Description Start Year City Cost Total Cost
Sullivan Road West Bridge Reconstruct and widen west 2014 $1,786 $16,880
(southbound)bridge
Barker Road/BNSF Grade Construct Grade Separation at 2016 $620 $4,599
Separation(PE&RW Only) Barker/BNSF RR/Trent(SR290)
Total: $2,406 $21,479
Projects and timeframes identified in the TiP are to be considered estimates only that may change due to a variety of circumstances,and are not
intended by the City to be relied upon by property owners or developers in making development decisions.
Monday,June 03,2013 Page 1 of 5
City of Spokane Valley
Department of Public Works
Six Year Transportation Improvement Program
Projects Listed by Category for the 2014-2019Six-Year TIP
Dollars in Thousands
Congestion Improvements
Project Name Description Start Year City Cast Total Cast
Argonne Road-190 to Trent Revise Signal Phasing,Add NB 2014 $79 $582
Right Turn Lane at Montgomery,
Intersection Improvements at Knox
Mansfield Ave Connection-Pines Construct 3-lane arterial gap 2014 $13 $951
(SR-27)to 200-ft East of Houk Rd connection from Pines to Houk,wl
sidewalk,curb,and stormwater
facilities
Sullivan Road Corridor Traffic Study- Conceptual Planning for Sullivan 2014 $11 $80
1-90 to Wellesley Road corridor improvements
Total: $103 $1,613
Pedestrian/Bicycle Program
Project Name Description Start Year City Cost Total Cast
Spokane Valley-Millwood Trail-SCC Construct Shared Use Pathway on 2014 $0 $440
to Evergreen Rd(PE) abandoned Railroad Right-of-way
Appleway Trail Phase 2-University Construct Shared Use Pathway 2014 $343 $2,542
to Evergreen(RW&CN) along abandoned Railroad Right-of-
Way
Sidewalk Infill Program-Phase 3 Complete gaps in sidewalk system 2014 $89 $655
throughout City,ADA upgrades
Appleway Trail Phase 3-Evergreen Construct Shared Use Pathway 2015 $415 $3,074
to Corbin along abandoned Railroad Right-of-
Way
Appleway Trail Phase 4-University Extend Shared Use pathway to 2015 $162 $1,200
Rd.to Balfour Park Balfour Park
Bowdish Sidewalk-8th to 12th Construct sidewalk along both sides 2015 $82 $601
of Bowdish
Park Road#1 Sidewalk Project- Construct sidewalk along east side of 2015 $61 $456
Sinto Ave.to Indiana Ave. Park Road from 200-ft S.of Sinto to
Indiana Ave.and 165-ft gap on
Mission Ave.east of Park Rd
Spokane Valley-Millwood Trail-SCC Construct Shared Use Pathway on 2018 $303 $2,240
to Evergreen Rd(RW&CN) abandoned Railroad Right-of-way
Total: $1,455 $11,208
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not
intended by the City to be relied upon by property owners or developers in making development decisions.
Monday,June 03,2013 Page 2 of 5
City of Spokane Valley
Department of Public Works
Six Year Transportation Improvement Program
Projects Listed by Category for the 2014-2019Six-Year TIP
Dollars in Thousands
Safety Program
Project Name Description Start Year City Cost Total Cost
Citywide Traffic Sign Project Replacement of regulatory&warning 2014 $0 $100
signs throughout City
SR-27(Pines)&Grace Ave. Safety Improvements,Add left turn- 2014 SO $523
Intersection Safety lane
Total: $0 $623
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not
intended by the City to be relied upon by property owners or developers in making development decisions.
Monday,June 03,2013 Page 3 of 5
City of Spokane Valley
Department of Public Works
Six Year Transportation Improvement Program
Projects Listed by Category for the 2014.2019Six-Year TIP
Dollars in Thousands
Street Preservation Projects
Project Name Description Start Year City Cost Total Cost
Adams St Resurfacing Project-4th Pavement Resurfacing&ADA 2014 $27 $195
to Sprague upgrades
2014 Street Preservation Project Euclid Ave Reconstruction-Flora to 2014 $2,000 $2,000
E City limits;Evergreen Rd
Resurfacing-Sprague to Mission;
Mullen Rd Resurfacing-Dishman-
Mica to Broadway;Sprague Ave
Resurfacing-Vista to Argonne
Sprague Ave Resurfacing-Argonne Grind/Overlay;OCI:33.28 2014 $98 $725
to Herald
Sprague Ave Resurfacing-Vista to Grind/Overlay;OCI:34.04 2014 $91 $670
Argonne
2015 Street Preservation Project Dishman-Mica Resurface-Sands to 2015 $2,000 $2,000
Thorpe; Euclid Ave Recon-West
end of City to Sullivan;Flora Rd
Recon-Euclid to Trent;Madison Rd
Recon-40th to Thorpe;Mission Ave
Resurface-Argonne to Herald;
Mullan Rd Resurface-Broadway to
Mission
Sullivan Road Resurfacing- Grind/Overlay;OCI:32.49 2015 $4 $30
Broadway to Mission
Sullivan Road Resurfacing-Sprague Grind/Overlay;OCI:31.2 2015 $113 $840
to Broadway
2016 Street Preservation Project Appleway Blvd Resurface-Vista to 2016 $2,000 $2,000
Dishman-Mica;Dishman-Mica Rd
Resurface-Thorpe to S City limits;
Euclid Ave Recon-Sullivan to
Marietta; Farr Rd Recon-4th to 8th;
Progress Rd Recon-Wellesley to
Crown
2017 Street Preservation Project Euclid Ave Recon-Marietta to Flora; 2017 $1,400 $1,400
Evergreen Rd Resurface-190 to
Indiana;Farr Rd Recon-Appleway to
4th;Sprague Ave Resurface-Flora to
Corbin;Sprague Ave Resurface-Park
to Vista;Sprague Ave Resurface-
Sullivan to Conklin
Projects and timeframes Identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not
intended by the City to be relied upon by property owners or developers in making development decisions.
Monday,June 03,2013 Page 4 of 5
City of Spokane Valley
Department of Public Works
Six Year Transportation Improvement Program
Projects Listed by Category for the 2014-2019Six-Year TIP
Dollars in Thousands
2018 Street Preservation Project 2018 $1,400 $1,400
2019 Street Preservation Project 2019 $1,400 $1,400
Total: $10,533 $12,660
Street Reconstruction Projects
Project Name Description Start Year City Cost Total Cost
Sullivan/Euclid Concrete Reconstruct intersection in concrete 2014 $7 $52
Intersection(PE) pavement
Broadway @ ArgonnefMullan Reconstruct intersections in concrete 2017 $285 $2,110
Concrete Intersections(CN Only) pavement
Sullivan/Euclid Concrete Reconstruct intersection in concrete 2017 $211 $1,562
Intersection(RVV/CN) pavement
Argonne Road Concrete Pavement- Reconstruct pavement in concrete; 2018 $3,108 $3,108
1-90 to Montgomery OCI:40.35(2012)
Total: $3,611 $6,832
Traffic Operations and Maintenance
Project Name Description Start Year City Cost Total Cost
ITS Infill Project, Phase 1 Install ITS controllers and fiber along 2014 $45 $328
Broadway, University and
Argonne/Mullan routes with existing
conduit
Sullivan Corridor ITS-Indiana to Extend ITS conduit and contols along 2015 $123 $914
Trent(SR 290) Sullivan Corridor
Total: $168 $1,242
Overall Total: $21,358 $72,227
Projects and timetrames identified In the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not
intended by the City to be relied upon by property owners or developers in making development decisions.
Monday,June 03,2013 Page 5 of 5
City of Spokane Valley
Department of Public Works
Six Year Transportation Improvement Program
2014 - 2010
Dollars in Thousands
2014
Item# Project Name Primary Source City Amount Total Amount
1 Argonne Road- 190 to Trent CMAQ 79 582
2 Mission Ave. - Flora Rd.to Barker Rd. (PEIRW) STP(U) 74 548
3 Spokane Valley-Millwood Trail-SCC to STP(E) 0 440
Evergreen Rd(PE)
4 Sullivan/Euclid Concrete Intersection (PE) STP(U) 7 52
5 Sullivan Road West Bridge BR 893 8,440
6 Mansfield Ave Connection-Pines(SR-27)to UCP 13 951
200-ft East of Houk Rd
7 Adams St Resurfacing Project-4th to Sprague CDBG 27 195
8 Citywide Traffic Sign Project Other Fed 0 100
9 SR-27(Pines) &Grace Ave. Intersection Safety Other Fed 0 523
10 Sullivan Road Corridor Traffic Study-1-90 to STP(U) 11 80
Wellesley
11 Appleway Trail Phase 2- University to CMAQ 343 2,542
Evergreen (RW&CN)
12 ITS lnfill Project, Phase 1 CMAQ 4 26
13 Sidewalk lnfill Program- Phase 3 CMAQ 12 87
14 Sprague Ave Resurfacing-Argonne to Herald STP(U) 98 725
15 Sprague Ave Resurfacing-Vista to Argonne STP(U) 91 670
16 2014 Street Preservation Project City 2,000 2,000
2014 Totals; $3,652 $17,961
2015
Item# Project Name Primary Source City Amount Total Amount
5 Sullivan Road West Bridge BR 893 8,440
12 ITS lnfill Project, Phase 1 CMAQ 41 302
13 Sidewalk lnfill Program- Phase 3 CMAQ 7 53
17 Appleway Trail Phase 3- Evergreen to Corbin CMAQ 29 214
18 Appleway Trail Phase 4- University Rd. to TA 68 500
Balfour Park
19 Bowdish Sidewalk-8th to 12th SRTS 14 97
20 Mission Ave. - Flora Rd. to Barker Rd. (CN) UAP 683 3,416
21 Park Road 111 Sidewalk Project- Sinto Ave. to SRTS 5 40
Indiana Ave.
22 Sullivan Corridor ITS-Indiana to Trent(SR 290) CMAQ 14 105
23 Sullivan Road Resurfacing- Broadway to Mission STP(U) 4 30
24 Sullivan Road Resurfacing-Sprague to STP(U) 113 840
Broadway
25 2015 Street Preservation Project City 2,000 2,000
2015 Totals: $3,871 $16,037 --
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not
intended by the City to be relied upon by property owners or developers in making development decisions,
Added Projects are shown in Green Rescheduled Projects shown in Orange Funded Projects are shown in Blue
Monday,June 03,2013 Page 1 of 2
2010
Item# Project Name Primary Source City Amount Total Amount
13 Sidewalk Infill Program- Phase 3 CMAQ 70 515
17 Appleway Trail Phase 3- Evergreen to Corbin CMAQ 386 2,860
18 Appleway Trail Phase 4- University Rd. to TA 94 700
Balfour Park
19 Bowdish Sidewalk-8th to 12th SRTS 68 504
21 Park Road#1 Sidewalk Project- Sinto Ave. to SRTS 56 416
Indiana Ave.
22 Sullivan Corridor ITS- Indiana to Trent(SR 290) CMAQ 109 809
26 Barker Road/ BNSF Grade Separation (PE & Other Fed 101 750
RW Only)
27 Broadway Improvement Project-Flora to Barker UAP 309 1,543
28 2016 Street Preservation Project City 2,000 2,000
2016 Totals: $3,193 $10,097
2017
Item# Project Name Primary Source City Amount Total Amount
26 Barker Road/BNSF Grade Separation (PE& Other Fed 256 1,899
RW Only)
27 Broadway Improvement Project- Flora to Barker UAP 833 4,163
29 Barker Rd-Spokane River to Euclid UAP 81 403
30 Broadway @ Argonne/Mullen Concrete STP(U) 285 2,110
Intersections (CN Only)
31 Park Road#2 - Broadway to Indiana (RW& CN) STP(U) 20 150
32 Sullivan I Euclid Concrete Intersection (RW/CN) STP(U) 211 1,562
33 2017 Street Preservation Project City 1,400 1,400
2017 Totals: $3,086 $11,687
2018
Item# Project Name Primary Source City Amount Total Amount
26 Barker Road I BNSF Grade Separation (PE& Other Fed 263 1,950
RW Only)
29 Barker Rd-Spokane River to Euclid UAP 580 2,899
31 Park Road#2 - Broadway to Indiana (RW& CN) STP(U) 388 2,877
34 2018 Street Preservation Project City 1,400 1,400
35 Argonne Road Concrete Pavement- 1-90 to City 359 359
Mon tg ornery
36 Spokane Valley-Millwood Trail-SCC to STP(E) 14 100
Evergreen Rd(RW&CN)
2018 Totals: $3,004 $9,585
2018
Item# Project Name Primary Source City Amount Total Amount
35 Argonne Road Concrete Pavement- 1-90 to City 2,749 2,749
Montgomery
36 Spokane Valley-Millwood Trail- SCC to STP(E) 289 2,140
Evergreen Rd (RW&CN)
37 2019 Street Preservation Project City 1,400 1,400
38 Barker Rd- Euclid to 0.1 mi. S.of Trent Ave UAP 114 571
(SR290)
2019 Totals: $4,552 $6,860
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not
intended by the City to be retied upon by property owners or developers in making development decisions.
Added Projects are shown in Green Rescheduled Projects shown in Orange Funded Projects are shown in Blue
Monday,June 03,2013 Page 2 of 2
City of Spokane Valley
2014 - 2019 Six Year TIP
0.
Progress Road Reconstruction
113=A� Wellesley to Crow�
i!�' a
Sullivan Roatl Corritlor
i aoic Study
1-90 to Wellesley -- �
Sullivan/Euclid
Concrete Intersection
Euclid Ave Reconstruction
Sullivan to Marietta
Spokane Valley-Millwood irai
SCC to Evergreen
SR 27(Pines)a Grace Ave
Intersection Safety
Euclid Ave Reconstruction
West End to Sullivan
Mansfield Ave Connection
SR 27 to 200 feet east of Houk
Sullivan Corridor ITS
Indiana to Trent(SR 290
Argonne Road
Concrete
1-90 to Montgomery
)
Flora Road
Reconstruction
Euclid to Trent
Euclid Ave
Reconstruction
Flora to E City Limits r
Ail
11/11�IIItt.1111.1
Barker Road
Euclid to 0.1 mile south
of Trent(SR 290)
Euclid Ave Reconstruction
Marietta to Flora
Barker Road
Spokane River to Euclid
Park Road-#1 Sidewalk
Sinto to Indiana
Montgomery
Mission
Mission Ave Resurfacing
Argonne to Herald
Evergreen Road Resurfacing
I-90 to Indiana
Broadw y/
Argonne a Mullan
Concrete lnt Isections
Mullan Road Resurf acing
Broadway to Mission
Ever green Road Resurfacing
-�
KmAtlams St king �••• ••�
Sprague Mission
Sprague Ave Resurfacing
Vista to Argonne
Mullan Road Resurfacing tlay
-,
Dishman M ica to Broaw,
Sprague Ave Resurfacing
Argonne to Herald
Sullivan Road Resurfacing
Sprague to Broadway
Sprag a Ave Resurfacing
Park to Vista
mama
Farr Road Reconstruction
Appleway to 4th
Appleway Trail Phase 2
university to Evergreen
Appleway Trail Phase 3
Evergreen to Corbin
Sprague Ave Resurfacing�1
Sullivan to Conklin J 1
Appleway Blvd Resurfacing
Vista to Dishman Mica
iii5kane
Valle
Dishman Mica Resurfacing
Sa ds to Thorpe
June 11,2013
Madison Road Reconshuction
40th to Thorpe
Dishman Mica Resurfacing
Thorpe to South City Limit
Legend
Project Year
2014
2015
2016
Note:
Citywide Traffic Sign Projects,ITS
Infill Project,Sidewall Infill Program,
and 2018/2019 Street Preservation
Projects not shown on this map.
2017
2018
2019