Loading...
13-114.00 Centurylink: Sullivan Bridge Drain Retrofit Conduit Hangers & Core HolesMEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF SPOKANE VALLEY AND CENTURYLINK CORPORATION FOR INSTALLING CONDUIT HANGERS AND DRILLING CORE HOLES AS PART OF THE CONSTRUCTION OF THE SULLIVAN ROAD BRIDGE DRAIN RETROFIT PROJECT, CIP 0150 I IIS MEMORANDUM OF UNDERSTANDING (MOU) is entered into on this -� day of 2013, by and between the City of Spokane Valley (the City) and CenturyLink brpor ion (CenturyLink). The City and CenturyLink are sometimes referred to individually as "Party" and collectively as the "Parties." WHEREAS, as part of the Sullivan Road Bridge Drain Retrofit Project (Retrofit Project), the City intends to install a storm drain system under the North Bound Sullivan Road Bridge over the Spokane River that will require hanger supports and drilling through pier cap diaphragms; WHEREAS, CenturyLink currently has fiber optic lines supported from poles along the west edge of the Sullivan Road right -of -way over the Spokane River; WHEREAS, the City has requested CenturyLink to relocate said communication lines; WHEREAS, CenturyLink has agreed to relocate said overhead communication lines and decided to relocate them to a conduit under the North Bound Sullivan Road Bridge; and WHEREAS, the purpose of this MOU is to define responsibilities and allocate costs for work related to the hanger supports and drilling for both CenturyLink and the City. NOW THEREFORE, the City and CenturyLink do hereby agree as follows: ARTICLE 1— RESPONSIBILITIES OF THE CITY 1. The City shall develop plans and specifications for the Retrofit Project, including plans and specifications for hanger supports and pier cap core drilling. 2. The City shall include in the bid schedule of the Retrofit Project a bid item paying for hanger support work ( "Hanger Bid Item ") and a bid item paying for pier cap core drilling, ( "Drilling Bid Item "). A. The Hanger Bid Item will include a trapeze support, sufficiently wide to install a 6 -inch conduit alongside of the stormdrain pipe; supported by hangers and anchors designed and sized to support a 6 -inch conduit with communication contents. B. The Drilling Bid Item will include sufficient room within the pier cap penetrations to route the 6 -inch conduit. C. The City will not install the following work underneath the north bound MOU Sullivan Road Bridge Drain Retrofit — CenturyLink Corporation 2013 Page 1 of 4 &0 I y bridge that will be required in the future to install the 6 inch communication conduits: a. Coredrill penetrations through either bridge abutment. b. Hanger assemblies south of the storm drain piping work. 3. The City anticipates opening bids for the Retrofit Project in Summer 2013, and intends to complete construction of the Retrofit Project, by Fall 2013. 4. The City shall review the Retrofit Project and will select the bidder with the lowest responsible bid for the entire project. 5. The City shall oversee the Retrofit- Project contractor during construction. 6. Upon awarding a contract for the Retrofit Project, the City shall have full control over the resultant construction contract and shall be the administrator for the Retrofit Project. The City shall indemnify and hold CenturyLink harmless from all actions, proceedings, and claims, which may be brought against CenturyLink by the City or a third party in relation to this MOU. The City shall install the storm drain system as part of the Retrofit Project. Nothing in this MOU shall prohibit the City from making any design or construction modifications to the storm drain system; provided the City shall ensure that any such changes still allow CenturyLink to install a 6 inch diameter conduit adjacent to the storm drain under the north bound Sullivan Road Bridge. ARTICLE 2 — RESPONSIBILITIES OF CENTURYLINK 1. CenturyLink shall relocate its overhead cable system and install a fiber optic line in a 6 -inch diameter conduit adjacent to the City's newly constructed storm drain under the North Bound Sullivan Road Bridge. 2. CenturyLink shall use the trapeze hanger support as shown on the attached Exhibit A. 3. CenturyLink shall obtain all necessary permits to perform its responsibilities under this MOU. ARTICLE 3 — ALLOCATION OF COSTS e),D CenturyLink shall, within -340--60 days of invoice from the City, compensate the City for the following costs: 50 a. One - sixth of the Hanger Bid Item costs; and b. One -third -sixth of the Drilling Bid Item costs. (SV 2. The City shall include with its invoice a copy of the final Retrofit Project Pay Application showing the final and original amounts for the Hanger Bid Item and Drilling Bid Item. MOU Sullivan Road Bridge Drain Retrofit — CenturyUnk Corporation 2013 Page 2 of 4 ARTICLE 4 — DURATION; AMENDMENT 1. This MOU shall become effective as of the date set forth above and remain in effect until the City has been reimbursed in accordance with Article 3. This MOU may only be terminated early by written mutual agreement of the parties. 2. This MOU may only be amended by written agreement of the parties. ARTICLE 5 — PARTY REPRESENTATIVES 1. CENTURYLINK'S REPRESENTATIVE. For purposes of this Agreement, CenturyLink's Representative is Dean Chiistens Blake Davis. rj0 2. THE CITY'S REPRESENTATIVE. For purposes of this Agreement, the City's Representative is Craig Aldworth, or current Retrofit Project, Project Engineer. ARTICLE 6 — INDEMNIFICATION 6.1 The City shall indemnify and hold harmless CenturyLink and its officers, agents, and employees, from any and all claims, actions, suits, liability, loss, costs, expenses, and damages of any nature whatsoever, by any reason of or arising out of any negligent act or omission of the City, its officers, agents and employees, relating to or arising out of performance of this MOU. In the event that any suit based upon such claim, action, loss, or damages is brought against CenturyLink, the City shall defend. the same at its sole cost and expense; provided that CenturyLink reserves the right to participate in said suit; and_ if final judgment in said suit be rendered ,against CenturyLink, and its officers, agents, and employees, or jointly against CenturyLink and the City and their respective officers, agents, and employees, the City shall satisfy the same. 6.2 CenturyLink shall indemnify and hold harmless the City and its officers, agents, and employees, from any and all claims, actions, suits, liability, loss, costs, expenses, and damages of any nature whatsoever, by any reason of or arising out of any negligent act or omission of CenturyLink, its officers, agents and employees, relating to or arising out of the performance of this MOU. In the event that any suit based upon such claim, action, loss, or damages is brought against the City, CenturyLink shall defend the same at its sole cost and expense; provided that the City reserves the right to participate in said suit if any principle of governmental or public law is involved; and if final judgment in said suit be rendered against the City, and its officers, agents, and employees, or jointly against the City and CenturyLink and their respective officers, agents, and employees, CenturyLink shall satisfy the same. 6.3 If the comparative negligence of the Parties and their officers and employees is a cause of such damage or injury, the liability, loss, cost, or expense shall be shared between the Parties in proportion to their relative degree of negligence and the right of indemnity shall apply to such proportion. MOU Sullivan Road Bridge Drain Retrofit — CenturyLink Corporation 2013 Page 3 of 4 6.4 Where an officer or employee of a Party is acting under the direction and control of the other Parry, the Party directing and controlling the officer or employee in the activity and/or omission giving rise to liability shall accept all liability for the other Party's officer or employee's negligence. 6.5 Each Party's duty to indemnify shall survive the termination or expiration of the MOU. 6.6 The foregoing indemnity is specifically intended to constitute a waiver of each Party's immunity under Washington's Industrial Insurance Act, chapter 51 RCW, respecting the other party only, and only to the extent necessary to provide the indemnified Party with a full and complete indemnity of claims made by the indemnitor's employees. The Parties acknowledge that these provisions were specifically negotiated and agreed upon by them. The parties have executed this Agreement this k day f , 2013. CITY OF SPOKANE VALLEY ce Jackso ity Manager ATTEST: ,Christine Bainbridge, City Clerk CENTURYLINK CORPORATION: T4-ke-- C� Blo.kP— �aui S By: Its: Authorized Representative APPROVED AS O FORM: Office qhe CitykAoAey MOU Sullivan Road Bridge Drain Retrofit — CenturyLink Corporation 2013 Page 4 of 4 UNWN shc; I IUN 1 Oor. 8' 1. CWRTRAC . Na M:i" ALL PPE tfNM% OMJN AND OIAPNMWA LOCATIONS MOR i OCWNNINO MN3m "*A 1. PIK MPUNO: C LL CC P0911 M TO NOT CONMI Wn 4mccP, OM4 OR OIAPNMCN LOCA ,] - w (r) 0 ru 1E x O LL. z 0 u 0150- SULUVAN BRIDGE OR" RETROFIT W- - mn pETULS B MpoRwid er vGm nix, wahroad ammmm u+wao IflW GN SgaOU� Nmuu SWM IDB PIPE HANGERANO BRACE PLAN SPtINAVC YkllY.'MA A9106 CM 4W1� 4 V 17 ��Al2Cy' BASE BID - SCHEDULE A el�C..: A 4-o MDtk --- �i------- - - - - - -� -- �" _ 4• rD,nwo 7 1D 7 1D vT w.1. • swmeu a � � eamwc eo Y GV� ]w SOUTH END DRAIN y CONNECTION DETAIL - - - -J: -- -_ -- — - - - -- °µms w,MN w� ITR.I 77 Ly� h�•.1Pl�IYC . M. i tlkW11a °flT I b tpyynE .w Yw s �ew1° a f f - - - - -- _ .��---- - - - -"— I - -- ---------- - --- - - - - -- NORTH END DRAM PtPE TRAPEZE HANGER a CONNECTION DETAIL z ASSEMBLY SECTION xri — xr, PIER DIAPHRAGM BRACESECTION 4 I I W4 ASSwM1Y I D D I I ]' H- IN PI[St AW - - - -J: -- -_ -- — - - - -- °µms w,MN w� ITR.I 77 Ly� h�•.1Pl�IYC . M. i tlkW11a °flT I b tpyynE .w Yw s �ew1° a f f - - - - -- _ .��---- - - - -"— I - -- ---------- - --- - - - - -- NORTH END DRAM PtPE TRAPEZE HANGER a CONNECTION DETAIL z ASSEMBLY SECTION xri — xr, PIER DIAPHRAGM BRACESECTION PIERDIAPHRAGM SECTION --- -- ---- W t!] - - --), r-- --7 r -- w --5 E I I � o LL �« I O D ii I 5 6 8 INTERMEDATE bIAPHRAGM — BRACE SECTION cAr oP SwWm Ydl.l l7l'iaSULLIVAMOGEBAIN R PETROFrt oieo en r ma o[uws w NB BRIDGE PIPING bETAILS �" I °�'"wjsn= l�uo9i40 BASE BID -SCHEDULE A m m 4 I I I j II I Y� I I I Ii, I` I - Euro°J Y Il �(q�.y�0.nC MpG °WIN VK — — — — — — — — — — — — — — — — — — PIER DLAPHRAGM CORE HCLEPLAN PIERDIAPHRAGM SECTION --- -- ---- W t!] - - --), r-- --7 r -- w --5 E I I � o LL �« I O D ii I 5 6 8 INTERMEDATE bIAPHRAGM — BRACE SECTION cAr oP SwWm Ydl.l l7l'iaSULLIVAMOGEBAIN R PETROFrt oieo en r ma o[uws w NB BRIDGE PIPING bETAILS �" I °�'"wjsn= l�uo9i40 BASE BID -SCHEDULE A m m x11 vure � ;�yU'� PLAN tl�,wSwa ruR: tLGVAI3VIN DIAPHRAGM BRACE ASSEMBLY 9 {A RE013Rm7 NR Emu MWINUH k 3/(aH—T -�1ff PpC 1z BRACE U -BOLT DETAIL Nm f�f r l 1 � TNw(T{ is PIPE TRAPEZE HANGER to ASSEMBLY xr, — L r� '7 t3lln'tA R I� nom' � -ff(!f 11/1tl- Npt _ jfjfr Etl�a�pRdtp 5MC NRC _ _ r 7 -3/4^ 2 -1/27 C-3/0' x_1/2• 7 -3/a" 3' 111 . A 73 TRAPEZE xm I o-u/1a- L tln4?llY• 1 � -t� ow varlet .olr: PLAN xa- i� d..nur vn� m AYr Anorc tl i ELEVATION NOTE: GALVANIZE AFTER FAMCATION BRACE ANCHOR PLATE DETAIL tt (9 REQUIRED) net NWE8; DRAIN FPE ALL 0MN ME AND FlINIC£. 9 ALL CMCM 10 A5111 M3, DTANDAAD .'ilOLl. PIPE SCH 40, OR APPRO MAL DRAIN PIPE F1T11NM :µN.0 f GRVVLDOO VRALI3c CH APMVED NUA, SIHGDTDRAL Sim AU. PIA . MRD AND Sll P .''M A30, n. M M THNCFDI:D ROD: A= A103 DRAM 0/, DR AS1M 0.440 DOLTMI AStM A323N NUM AOM M2R1, 6Rh0C 9N ALL SS PUM. DA(CI ANa SNAFW TO 3C aALVANRM AFfEA FAMICAt N N ACCORDM'CE MTH AA4 TD N111, ODLr, NLTM W� AND MR FA NW: M DE DALVANNCD IN ACLVRDANLE WH A'liM Al9 DIL AA!RRD MI3x. WELDING ALL WELDING ;:EAU DE PMCRMED DY CQi. 0 MnW1 NAMNO CVRRINT DPLRIEHCC IN TYPE."' ELF N'QD MOW ON ZRAINO OR NaS V E7C SERIF; law KmRacm Ezcm0 aytll:Naaa. vmv 015GWLUVAN BRIDGE DRAIN RETRCFIT 0.pwa.r3 0l YWtlo KaM tear Lwl lwaw•A.N», swo. lao PIPE HANGERANOBRACE DETAILS BASE B0- SCHEDULE A =11PFoPPY0u010 w O Q U 4 M 73 r -� Emu MWINUH k 3/(aH—T -�1ff PpC 1z BRACE U -BOLT DETAIL Nm f�f r l 1 � TNw(T{ is PIPE TRAPEZE HANGER to ASSEMBLY xr, — L r� '7 t3lln'tA R I� nom' � -ff(!f 11/1tl- Npt _ jfjfr Etl�a�pRdtp 5MC NRC _ _ r 7 -3/4^ 2 -1/27 C-3/0' x_1/2• 7 -3/a" 3' 111 . A 73 TRAPEZE xm I o-u/1a- L tln4?llY• 1 � -t� ow varlet .olr: PLAN xa- i� d..nur vn� m AYr Anorc tl i ELEVATION NOTE: GALVANIZE AFTER FAMCATION BRACE ANCHOR PLATE DETAIL tt (9 REQUIRED) net NWE8; DRAIN FPE ALL 0MN ME AND FlINIC£. 9 ALL CMCM 10 A5111 M3, DTANDAAD .'ilOLl. PIPE SCH 40, OR APPRO MAL DRAIN PIPE F1T11NM :µN.0 f GRVVLDOO VRALI3c CH APMVED NUA, SIHGDTDRAL Sim AU. PIA . MRD AND Sll P .''M A30, n. M M THNCFDI:D ROD: A= A103 DRAM 0/, DR AS1M 0.440 DOLTMI AStM A323N NUM AOM M2R1, 6Rh0C 9N ALL SS PUM. DA(CI ANa SNAFW TO 3C aALVANRM AFfEA FAMICAt N N ACCORDM'CE MTH AA4 TD N111, ODLr, NLTM W� AND MR FA NW: M DE DALVANNCD IN ACLVRDANLE WH A'liM Al9 DIL AA!RRD MI3x. WELDING ALL WELDING ;:EAU DE PMCRMED DY CQi. 0 MnW1 NAMNO CVRRINT DPLRIEHCC IN TYPE."' ELF N'QD MOW ON ZRAINO OR NaS V E7C SERIF; law KmRacm Ezcm0 aytll:Naaa. vmv 015GWLUVAN BRIDGE DRAIN RETRCFIT 0.pwa.r3 0l YWtlo KaM tear Lwl lwaw•A.N», swo. lao PIPE HANGERANOBRACE DETAILS BASE B0- SCHEDULE A =11PFoPPY0u010 w O Q U 4 M 73