13-131.00 WM Winkler: Sidewalk Infill Ph 1S pokane ,;00V01ey- DEPARTMENT OF PUBLIC WORKS CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 12 -023 PROJECT: Sidewalk Infill Project - Phase 1 CHANGE ORDER NO: 5 CONTRACTOR: WM Winkler Company CONTRACT DATE: 10/1/2012 PROJECT NO: 149 PO #: 42961 DESCRIPTION OF CHANGES This change order adds measurement guidelines to Roadway Excavation Including Haul to provide a way to measure and the unit bid item. In addition this change order modifies the price of Roadway Excavation Including Haul to adjust for the increase in quantitiy. Item No Description Unit Quantfty Unit Price Total A -61 Roadway Excavation Including Haul in excess of 125% CY 72.0 $48.00 Total Amount of this Change Order: $ $3,456.00 $3,456.00 SUBSTANTIAL COMPLETION Original Date: 11/9/2012 Prior to this Change Order: 6/3/2013 Including this Change Order: 6/3/201 Prior Working Days: 38 Working Days Added by this CO: 0 Working Days including this CO: 38 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $ 477,235.50 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 19,660.10 ..................................................................... ............................... TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER (through CO# 4) $ 496,895.60 .......... ............................... NET THIS CHANGE ORDER $ 3,456.00 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 500,351.60 �s��r I_Poi'i: GIRL C�� �1K Thecont factor -hereby-accepts this-adjustment -under- the - terms -ofthe- origirraficantraatforail work pe#orn%d- RECOMMENDED BY: LIMA '/I . (AhN.i Af 1" Project Manager APPROVED BY: ric Guth, Public Works Director APPROVED BY: N/A Mike Jackson, City Manager ATTACHMENTS: Roadway Excavation Specification Distribution: ORIGINALS TO: City of Spokane Valley Clerk's Office, Contractor COPIES TO: PW Project File, Finance dept DATE: DATE: t j I3 DATE: DATE: CO�3 -�31 2 3 4 5 6 7 8 9 10 11 DIVISION 2 EARTHWORK 2 -03.4 Measurement Add the following: Roadway Excavation Including Haul shall be by the neat line cubic yard required to build the project. This is defined as the calculated difference between the required subgrade elevation and the existing surface elevations after the existing pavement has been removed and the vegetation has been cleared and grubbed. City of Spokane Valley Change Order 2 Specifications Sidewalk Infill Project — Phase 1 2 SVPW Bid No 12 -023 '0 C'ICITYOF 3p6koaoone� ,:,oOValle, Public Works Department Capital Improvement Program 11707 E Sprague Ave Suite 1061 Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 4 cityhatt@spokanevalley.org Change Order Memo Date: July 24Y', 2013 By: Erica Amsden Eoj Re: Change Order 5 for Sidewalk Infill Project, CIP 0149 1. Describe the Change Change Order 5 reduces the cost of 'Roadway Excavation Including Haul' because the measured field quantity exceeded the Unit Bid Form Quantity by over 25 %. The anticipated quantity was approximately 50 cubic yards; the actual quantity was 134 cubic yards. The contractor will be paid as for the first 62.5 cubic yards at the bid cost of $100 /cubic yard per section 1 -04.6 of the WSDOT Standard Specifications. The change order was for the remaining 71.5 cubic yards of material. The change had been issued unilaterally. 2. Evolution of the Change The change is purely a cost reduction of `Roadway Excavation Including Haul' in excess of 125% because the unit bid price was approximately 2.7 times as much as the bid form quantity. 3. Payment The cost was based off of Unit Bid Prices in accordance with Section 1 -09.4 of the WSDOT Standard Specifications. See the attached CO 5 Cost Establishment. 4. Time No Additional time was granted by the change order because the contractor was already aware of the amount of roadway excavation from the plans. 5. Prior Approval Prior Approval was obtained from the Spokane Valley Public Works Director. 6. Attachments C05 and C05 Cost Establishment Spo ,,,:W,0Va11ey Sidewalk lnfill Project #0149 Change Order 5 Cost Justification Public Works Department Capital Improvement Program 11707.E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall @spokanevatley.org Items A -13 had field measured quantities over 2 times of that on the bid form. Because of this substantial increase in quantity we have adjusted the price for any quantity above 125 %. Cost was based on WSDOT's Database and a City of Spokane Valley Late Season Bid with the same Subcontractor and Prime. The Bid Item Unit Price and Bid Tab are attached. BID TABULATION Sldwralk and Tramtt Stop AmtolbMtq Prgtct - Moo 1 PTL+Jaot CIP No. 0154 &D OPENING DATE - Stptamtlar1. 201210:00 A.M. YiLLl � 1Q:11 - / A6dr4MNai0 SNNbd0 , Bp daD6w atamy6ond Omemt6lalA Ctltt111axmtl at7 A111aAd Ra1t11Mmamlt L800TM10 Raa8k0on CmtMOMen Mm011Mga611 %MbM Ye6 ra4 Yw Yell Ysa Ya Yoa YN Yes Yom 6,10% 6,00% er4t6mM4 wmato tam, wrot w ean"" C- .,.RMty. LLC. taa R ffm U6a Gt�tt r tw* PON TOM Cod WIT PAN Tout CNt Una P&* Total ood 0�, MMWa' M. aMmwiralk�Iryi ¢aeR, OMnagi`°�f11MVa1�ta6dlaaM 1 IlATgN +000040 S1D .aa lS s 0 T LS S15.340,00 ST ION NO LS 1 000 m SJ AO L.'. 160.00 R S2.000.00 3 P TEM TRAFFIC L 1 000.00 U: 50000.00 LS on 4 TRENCH VA 7Y S 7 360040 ti 1 $SOp 00 1 EROSION LS 1 Stow= S7000,00 LS 000.00 LS OOm 6 PLAN LS SSW= $600.40 U. SS00.00 LS 540om 7 R I LS 1 S500m 600.00 Ui 31200.00 L8 $2,500.00 REMOVE ALK! I A 110 1040 5000.00 St .00 $1820.00 10.00 _ $00040 REM CURS UTTER LF 000 57.30 $6730.00 m 1200.00 00 720040 10 SAVVCl1T ACP PAVED LF•W 600 $tm 34800.00 31.10 260.00 50,76 m 11 REM T PAVEMENT SY 780 1040 $1780040 20 110.16.00 10.00 517 00 .60 12 A V I 6 loom 600.00 316.00 324400 5100.00 5300 13 Y P IONM THOOC CY 6 /0040 30040 70.00 30.00 100.00 $600.00 "I SURF TN SV 100 /640 1 00 16.65 166500 10.00 1000 13 SNEO TOP 1W.19- S 1 20 S10m St3 00 40 12 .00 311.00 14520.00 1 P OEPTN SV 410 S/6m $7,M.00 522.00 0 .00 31140 10.00 17 NW. i/Y 64.24 .17 FT PTN SY 310 520.00 S6 m 315.60 A".00 740 37040 1e 1 404.28 $ PTN SY 100 6040 55000.00 SM.00 34400.00 344.00 S4 0040 1 JOIN 3M 1.530 140 $1 ,moo 1.13 S1.759.50 1.00 31 63040 20 MI% THE LC 1 _ S1.00 S1.0U CAT 51.00 CALL 51.00 27 PR CALC 1 •$im 51.00 CALC S1 IXI• L:AlC 1$1,00, 22 N 1 ER 1 30040 32 .00 .00 32 m 23 CONCRETE ET t EA 1 31 m 1200.00 2000,00 2000.00 00 m 24 SP Aa. SEPARATOR EA 1 S300M wwao .00 .OD .00 5300.00 25 T T A EA 7 S3000m 3000.00 023.00 026,00 00000 33000.00 T EA 3 S5N,00 1600.00 51000 1 ,00 $53400 5165040 ST R t01N. 4.641. LF 30 $7540 $2,290.00 107,00 10.00 3100.00 000.00 W 1 $1 m + OOOm 564400 0.00 1 500.00 t 600.00 XI EA 1 SWAG SS00.00 1000.00 54 .00 1000.00 100040 VAL EA 8 $150040 200.00 1 90.00 $J00.00 1 00.00 EN T 1 14 2040 000.00 360 1a 000 1220 17080.00 14.60 $10600m AV A S SJS.00 S/ 00 500 510 30.00 W Sr 70 Ao 16960.00 526.60 14502.40 00 32168000 11H T EA. a $1 m 0600. 1 .00 8000.00 100400 000.00 LaEITT aXte P A 2 51 m 500040 030. 1000.00 1000.00 200400 ENT CONCRETE 1 s/ .o0 7 00 5100000 1 .00 1000,00 1000.00 AND REI ALLf 1 m 300000 $42.00 200.00 560.00 S 000.0E MU S 3 1540 552500 516.00 5560P TYPES 130 sem 101 $0.00 1/7040 f0. RKMIA.CN SY 30 523.00 760.00 512.00 J60.00 10.00 ,00 01NS7ALUTION SY 1 16 51030.00 1.00 7J040 .00 32O LAVA a 30.00 5000 1500 7!6.00 520. 4J NAIL60x EA 0 00 S2 A00.00 +600 400.ao _ tTOTA A6dr4MNai0 SNNbd0 , Bp daD6w atamy6ond Omemt6lalA Ctltt111axmtl at7 A111aAd Ra1t11Mmamlt L800TM10 Raa8k0on CmtMOMen Mm011Mga611 %MbM Ye6 ra4 Yw Yell Ysa Ya Yoa YN Yes Yom 6,10% 6,00% Unit Bid Analysis- Standard Items Report ,f► Washington Stato T /f/' Department of Transpartaflon Standard http: / /www.wsdot. ova .govlbiz /contaa/uba/sreport.cfm (Newsl Search I Contact WSDOT I VVSDOT Home Bid Item Unit Price Tabulation Standard Items Region, Northwest Contracts awarded from 7/24/2011 thru 7/24/2013 Total records found: 23 New Search Item Unit of Job Contract Planned Low Second Third Number Measure Item Description Number Number AD Date Quantity Bid Bid Bid 0310 C.Y. ROADWAY EXCAVATION INCL. 10A046 008060 11/29!2011 9,815.00 $1020 $11.15 $11.00 HAUL 0310 C.Y. 11A013 008211 8/22/2011 20.00 $160.00 $95.00 $50.00 HRAOADWAYEXCAVATIONINCL. 0310 C.Y. INCL. 10A042 008222 10!3/2011 18,450.00 $11.70 $1120 $12.25 HRAOADWAYEXCAVATION 0310 C.Y. WCL. llAO07 008223 1013/2011 3,960.00 $11.50 $16.50 $26.00 tROOADWAYEXCAVAMON 0310 C.Y. INCL. llAO18 008233 1215/2011 103.00 $72.00 $65.00 $35.00 }ROOADWAYEXCAVATION 0310 C.Y. ROADWAY EXCAVATION INCL. IIA008 008236 12/12/2011 420.00 $28.75 $50.00 $100.00 0310 C.Y. RROOADWAYEXCAVATION INCL. lIA025 008268 3/12/2012 ,85.00_ i$60 .00`' $65.00 $32.00 UL 0310 C.Y. ROADWAY EXCAVATION INCL. llA026 008269 3/12/2012 200.00 $25.00 $12.00 $13.60 HAUL 0310 C.Y, ROADWAY EXCAVATION INCL. 11 .0015 008286 4128012 110,335.00 $9.00 $8.00 $9.00 HAUL 0310 C.Y. RROOADWAYEXCAVATION INCL. llAO04 008290 4/98012 9,238.00 $12.00 $6.25 $6.50 UL 0310 C.Y. ROADWAY EXCAVATION INCL. 12A005 008367 4/308012 X60.00 $68.00 $54.00 $65.00 HAUL 0310 C.Y. ROADWAY EXCAVATION INCL. 1IA020 008363 7130/2012 3,580.06 $15.00 $6.30 $6.30 HAUL C.Y. ROADWAYEXCAVATION INCL. 1iA009 008379 10/18012 782.00 $24.50 $29.00 $23.60 HAUL HAUL 0310 C.Y. RROOADWAYEXCAVA11ONINCL. 12A014 008381 10118012 1536.00 $21.00 $25.00 $20.00 UL 0310 C.Y. RO DWAYEXCAVATION INCL. 12AO22 006463 12/17/2012 30.00 $68.00 $19.15 $28.00 HAUL 6310 C.Y. RROADWAYEXCAVATION INCL. 12A021 008414 1122!2013 960.00 $0.01 $52.00 $85.00 FIAM 0310 C.Y. R_ OOADWAY EXCAVATION INCL. 12A615 008416 1828013 1,530.00 $14.36 $0.00 $0.00 0310 C,Y, ROADWAY EXCAVATION INC L. 12AO18 008418 1/22/2013 4,750.00 $8.50 $14.00 $15.00 0310 C.Y. INCL: 12A001 008423 2/48013 60.00 $16.65 $10.50 $25.00 FROOADWAYEXCAVATION UL 0310 C.Y. ROADWAY EXCAVATION INCL. 12AO23 008436 2858013 805.00 $11.00 $18.00 $13.40 HAUL 0310 C.Y. RROADWAYEXCAVATION INCL. 12A026 008445 3/48013 154.00 $130.00 $40.00 $60.00 HAUL 0310 C.Y. RROOADWAYEXCAVATION INCL. 12A016 008461 4118013 746.00 $46.00 $51.50 $76.00 UL 0310 C.Y. 12AO20 408486 5/138013 2,031.00 $18.00 $22.00 $39.45 tROOADWAYEXCAVATIONINCL. I of 2 7/2412013 9:23 AM Unit. Bid analysis- Standard Items Report Standard http://www.wsdot.wa.gov/biz/contaa/uba/sreport.cfm Item Unit of Job Contract Planned Low Second Third Number Measure Item Description Number Number AD Date Quantity Bid Bid Bid NWR AVERAGE LOW BID is $10.44 State AVERAGE LOW BID is $7.93 ew;, earch Copyright WSDOT© 2001 Traffic & Roads I Site Index I Contact WSDOT ( WSDOT Business l WSDOT Home 2 of 2 7/24/2013 9:23 AM