Loading...
13-145.00 CH2M Hill: Sullivan West Bridge ReplacementThe Local Agency of City of Spokane Valley, Washington desires to supplement the agreement entered into with CH2M HILL, INC. and executed on 11/8/2011 and identified as Agreement No. 0155 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: See Fvhihit A_1 attached current Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Completion Date is reviged to December 3l, 7014 Section V, PAYMENT, shall be amended as follows: as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: Roger W Flint By: zzz Consultant Signature DOT Form 140 -063 EF Revised 9/2005 pproving Authority Signa r Date % 1 2 -- 1 L�� EXHIBIT A -1 Scope of Work for Sullivan Road West Bridge Replacement - Supplemental Agreement No. 10 City of Spokane Valley, Washington FHWA Project No. BRM 4103(007) August 2013 1.0 Introduction This Supplemental Agreement No. 10 scope of work modifies the scope of CH2M HILL's professional engineering services and compensation for final design of the Sullivan Road West Bridge Replacement to include supplemental survey on the project site to locate observable springs along the banks of the Spokane River, and record the current river surface limits. In addition, legal descriptions and exhibits will be prepared for two separate land areas as defined as to be dedicated in the April 5, 2011 Hanson (Market Pointe II, LLC) Agreement with the City of Spokane Valley. Task 1: Surveying and Mapping 1.1 Surveying This task involves supplemental field surveying and topographic base mapping of areas within the project limits to capture observable springs along the banks of the Spokane River, together with the current river surface limits. 1.2 Mapping Provide revised project basemapping (AutoCAD 2011 format) to include: • Location of observable springs along the Spokane River banks. • Current Spokane River surface limits Deliverables: Revised project basemapping Task 11: Right -of -Way Plans and Descriptions 11.1 Right -of -Way Plans and Descriptions Additional legal descriptions and exhibits will be prepared for two distinct land areas as defined as to be dedicated in the April 5, 2011 Hanson (Market Pointe II, LLC) Agreement with the City of Spokane Valley. Deliverables: Legal descriptions and exhibits. 1 DOCUMENTS EXEMPT FROM PUBLIC DISCLOSURE The page entitled "Exhibit E -1" contains confidential cost and rate data and is withheld from public disclosure pursuant to 23 USC 112(2)(F). Prenotification; confidentiality of data. A recipient of funds requesting or using the cost and rate data shall notify any affected firm before such request or use. Such data shall be confidential and shall not be accessible or provided, in whole or in part, to another firm or to any government agency which is not part of the group of agencies sharing cost data under this paragraph, except by written permission of the audited firm. If prohibited by law, such cost and rate data shall not be disclosed under any circumstances. You may petition for a review of our findings pertaining to any redacted or withheld documents pursuant to Spokane Valley Municipal Code (SVMC) 2.75.080; and obtain judicial review pursuant to RCW 42.56.550.