Loading...
13-150.00 Cat's Eye Excavating: Bettman-Dickey Stormwater Upgrades,i #' r !FT�4 Public Works Department Stormwater Utility 11707 E Sprague Ave Suite 106 0 Spokane Valley WA 99206 509.921.1000 0 Fax: 509.921.1008 0 cityhatt@spokanevalley.org Date: September, 2013 a ,ec+ 10, To: Eric Guth From: Ryan Brodwater Re: Change Order 2 Bettman Dickey Stormwater Upgrade Project Project # 13 -018 Budget Account No. 403.000.000.595.40.63.00 Cat's Eye Excavating, Inc. Change Order 2 adjusts estimated quantities to as -built quantities. Original Contract amount = $164,000.95 Previous Change Order Cost = $15,552.00 Change Order #2 Cost = $8,911.00 Project Cost including Change Orders = $188,463.95 Max Public Works Director Contract authority =15% of Original Contract amount = $24,600.14 Change Order Cost to date = $24,463.00 Remaining P.W. Director Contract Authority after CO #2 $137.14 Public Works Director Cc: City Manager Finance Department Project Manager (!,D13-kCjo CHANGE ORDER TO "CONSTRUCTION CONTRACT NO: 13 -018 { i PROJECT:` ✓` Betttnan Dickey Stortmnrater Upgrade Project CONTRACT DATE: 7/9/2013 CONTRACTOR: Cats t e Excavating, Inc. CHANGE ORDER NO: 2 Public Works Project # 13-018 BID NO.: 13-018 s SEE Al u�aa.rar i w�� yr a.nrawc.� Order 2 adjusts original estimated quantities to as -built quantities. Description ED SUMMARY Unit Quantity Unit Price Total Amount of this Change Order (incl. Tax) Total $ 8,911.00 THESI' CHANGES RESULT IN =THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT _ _ $ 164,000.95 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT _ $ 15,552-00 TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER_ _ _ _ $ 179,552.95 NET THIS CHANGE ORDER _ _ $ 8,911.00 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 188,463.95 CONTRACTOR ACCEPTANCE The contractor hereby accepts this !adjustment u r the terns of the original contract for all work perfomed. i t RECOMMENDED BY: s i APPROVED BY: { t c Guth; Public Works Drector DATE: DATE: DATE: —A&— APPROVED BY: i l DATE: Mike Jackson, Cdy'Manager g ATTACHMENTS: ORIGINALS TO: Contractor, City of Spokane Valley Clerk's Office, PW Project File r plSb�i tY COPIES T0: PW Project Fite Bettman Dickey Stormwater Upgrade, Change Order 2 Summary Item No Description Unit Quantity Unit Price Total SCH 136 SAWCUT ASPHALT CONCRETE PAVEMENT SY -398 $ 0.65 $ (258.70) SCH 137 SAWCUT ASPHALT CONCRETE PAVEMENT SY 808 $ 0.65 $ 525.20 SCH 138 REMOVE ASPHALT CONCRETE PAVEMENT SY -147 $ 6.00 $ (882.00) SCH 139 REMOVE ASPHALT CONCRETE PAVEMENT SY 166 $ 6.00 $ 996.00 SCH 140 REMOVE CEMENT CONC. CURB LF -50 $ 10.00 $ (500.00) SCH 141 REMOVE CEMENT CONC. CURB LF 64 $ 10.00 $ 640.00 SCH 142 ADS N -12 HP PIPE 18 IN. DIAM. LF -1621 $ 28.00 $ (45,388.00) SCH 143 ADS N -12 HP PIPE 18 IN. DIAM. LF 1599 $ 28.00 $ 44,772.00 SCH 144 ADS N -12 HP PIPE 30 IN. DIAM. LF -292 $ 70.00 $ (20,440.00) SCH 145 ADS N -12 HP PIPE 30 IN. DIAM. LF 300 $ 70.00 $ 21,000.00 SCH 146 D.I. STORM SEWER PIPE 12 IN. DIAM. LF -69 $ 50.00 $ (3,450.00) SCH 147 D.I. STORM SEWER PIPE 12 IN. DIAM. LF 80 $ 50.00 $ 4,000.00 SCH 148 STORM DRAIN ENCASEMENT LF -40 $ 45.00 $ (1,800.00) SCH 149 STORM DRAIN ENCASEMENT LF 0 $ 45.00 $ - SCH 150 SCHEDULE A CULV. PIPE 12 IN. DIAM. LF -176 $ 17.25 $ (3,036.00) SCH 151 SCHEDULE A CULV. PIPE 12 IN. DIAM. LF 180 $ 17.25 $ 3,105.00 SCH 152 18 IN. DEEP "V" DITCH CONSTRUCTION LF -307 $ 9.75 $ (2,993.25) SCH 153 18 IN. DEEP "V" DITCH CONSTRUCTION LF 329 $ 9.75 $ 3,207.75 SCH 154 ASPHALT CURB TYPE C LF -502 $ 8.00 $ (4,016.00) SCH 155 ASPHALT CURB TYPE C LF 394 $ 8.00 $ 3,152.00 SCH 156 CEMENT CONC. CURB TYPE A LF -50 $ 25.00 $ (1,250.00) SCH 157 CEMENT CONC. CURB TYPE A LF 63 $ 25.00 $ 1,575.00 SCH 158 CRUSHED SURFACING TOP COURSE, 0.5' DEPTH SY -307 $ 16.00 $ (4,912.00) SCH 159 CRUSHED SURFACING TOP COURSE, 0.5' DEPTH SY 539 $ 16.00 $ 8,624.00 SCH 160 HMA CL. 1/2 IN. PG 64 -28. 0.17' DEPTH SY -307 $ 20.00 $ (6,140.00) SCH 161 HMA CL. 1/2 IN. PG 64 -28. 0.17' DEPTH SY 619 $ 20.00 $ 12,380.00 Change Order 2 Total: $ 8,911.00