13-150.00 Cat's Eye Excavating: Bettman-Dickey Stormwater Upgrades,i
#' r !FT�4
Public Works Department
Stormwater Utility
11707 E Sprague Ave Suite 106 0 Spokane Valley WA 99206
509.921.1000 0 Fax: 509.921.1008 0 cityhatt@spokanevalley.org
Date: September, 2013
a ,ec+ 10,
To: Eric Guth
From: Ryan Brodwater
Re: Change Order 2 Bettman Dickey Stormwater Upgrade Project
Project # 13 -018
Budget Account No. 403.000.000.595.40.63.00 Cat's Eye Excavating, Inc.
Change Order 2 adjusts estimated quantities to as -built quantities.
Original Contract amount = $164,000.95
Previous Change Order Cost = $15,552.00
Change Order #2 Cost = $8,911.00
Project Cost including Change Orders = $188,463.95
Max Public Works Director Contract authority
=15% of Original Contract amount = $24,600.14
Change Order Cost to date = $24,463.00
Remaining P.W. Director Contract Authority after CO #2 $137.14
Public Works Director
Cc: City Manager
Finance Department
Project Manager
(!,D13-kCjo
CHANGE ORDER TO "CONSTRUCTION CONTRACT NO: 13 -018
{
i
PROJECT:`
✓` Betttnan Dickey Stortmnrater Upgrade Project CONTRACT DATE: 7/9/2013
CONTRACTOR:
Cats t e Excavating, Inc. CHANGE ORDER NO: 2
Public
Works Project # 13-018
BID NO.:
13-018 s
SEE Al
u�aa.rar i w�� yr a.nrawc.�
Order 2 adjusts original estimated quantities to as -built quantities.
Description
ED SUMMARY
Unit Quantity Unit Price
Total Amount of this Change Order (incl. Tax)
Total
$ 8,911.00
THESI' CHANGES RESULT IN =THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE:
ORIGINAL TOTAL CONTRACT AMOUNT _ _ $ 164,000.95
TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT _ $ 15,552-00
TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER_ _ _ _ $ 179,552.95
NET THIS CHANGE ORDER _ _ $ 8,911.00
TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 188,463.95
CONTRACTOR ACCEPTANCE
The contractor hereby accepts this !adjustment u r the terns of the original contract for all work perfomed.
i t
RECOMMENDED BY:
s
i
APPROVED BY:
{ t c Guth; Public Works Drector
DATE:
DATE:
DATE: —A&—
APPROVED BY: i l DATE:
Mike Jackson, Cdy'Manager
g
ATTACHMENTS:
ORIGINALS TO: Contractor, City of Spokane Valley Clerk's Office, PW Project File
r plSb�i tY
COPIES T0: PW Project Fite
Bettman Dickey Stormwater Upgrade, Change Order 2 Summary
Item No
Description
Unit
Quantity
Unit Price
Total
SCH 136
SAWCUT ASPHALT CONCRETE PAVEMENT
SY
-398
$
0.65
$
(258.70)
SCH 137
SAWCUT ASPHALT CONCRETE PAVEMENT
SY
808
$
0.65
$
525.20
SCH 138
REMOVE ASPHALT CONCRETE PAVEMENT
SY
-147
$
6.00
$
(882.00)
SCH 139
REMOVE ASPHALT CONCRETE PAVEMENT
SY
166
$
6.00
$
996.00
SCH 140
REMOVE CEMENT CONC. CURB
LF
-50
$
10.00
$
(500.00)
SCH 141
REMOVE CEMENT CONC. CURB
LF
64
$
10.00
$
640.00
SCH 142
ADS N -12 HP PIPE 18 IN. DIAM.
LF
-1621
$
28.00
$
(45,388.00)
SCH 143
ADS N -12 HP PIPE 18 IN. DIAM.
LF
1599
$
28.00
$
44,772.00
SCH 144
ADS N -12 HP PIPE 30 IN. DIAM.
LF
-292
$
70.00
$
(20,440.00)
SCH 145
ADS N -12 HP PIPE 30 IN. DIAM.
LF
300
$
70.00
$
21,000.00
SCH 146
D.I. STORM SEWER PIPE 12 IN. DIAM.
LF
-69
$
50.00
$
(3,450.00)
SCH 147
D.I. STORM SEWER PIPE 12 IN. DIAM.
LF
80
$
50.00
$
4,000.00
SCH 148
STORM DRAIN ENCASEMENT
LF
-40
$
45.00
$
(1,800.00)
SCH 149
STORM DRAIN ENCASEMENT
LF
0
$
45.00
$
-
SCH 150
SCHEDULE A CULV. PIPE 12 IN. DIAM.
LF
-176
$
17.25
$
(3,036.00)
SCH 151
SCHEDULE A CULV. PIPE 12 IN. DIAM.
LF
180
$
17.25
$
3,105.00
SCH 152
18 IN. DEEP "V" DITCH CONSTRUCTION
LF
-307
$
9.75
$
(2,993.25)
SCH 153
18 IN. DEEP "V" DITCH CONSTRUCTION
LF
329
$
9.75
$
3,207.75
SCH 154
ASPHALT CURB TYPE C
LF
-502
$
8.00
$
(4,016.00)
SCH 155
ASPHALT CURB TYPE C
LF
394
$
8.00
$
3,152.00
SCH 156
CEMENT CONC. CURB TYPE A
LF
-50
$
25.00
$
(1,250.00)
SCH 157
CEMENT CONC. CURB TYPE A
LF
63
$
25.00
$
1,575.00
SCH 158
CRUSHED SURFACING TOP COURSE, 0.5' DEPTH
SY
-307
$
16.00
$
(4,912.00)
SCH 159
CRUSHED SURFACING TOP COURSE, 0.5' DEPTH
SY
539
$
16.00
$
8,624.00
SCH 160
HMA CL. 1/2 IN. PG 64 -28. 0.17' DEPTH
SY
-307
$
20.00
$
(6,140.00)
SCH 161
HMA CL. 1/2 IN. PG 64 -28. 0.17' DEPTH
SY
619
$
20.00
$
12,380.00
Change Order 2 Total: $ 8,911.00