Loading...
13-158.00 CH2M HillSupplemental Agreement pp J Organization and Address CH2M HILL, INC. Number 9 717 W. Sprague Avenue, Suite 800 Spokane, WA 99201 -3911 Original Agreement Number Sullivan Road W Bridge Replacement #0155 Phone: (509) 747 -2000 Project Number Execution Date Completion Date BRM 4103 007 11/8/2011 12/31/2013 Project Title New Maximum Amount Payable SULLNAN ROAD WEST BRIDGE $ 1,588,608.00 Description of Work Professional services to design a latex modified concrete (LMC) overlay for the NB Sullivan Bridge, incorporate mitigation plantings required by environmental permitting into the project plans and contract documents, and design pedestrian lighting for the multi -use pathway on the southbound bridge and overlooks. The Local Agency of City of Spokane Valley, Washington desires to supplement the agreement entered into with CH2M HILL, INC. and executed on 11/8/2011 and identified as Agreement No. 0155 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: SeeF,xhihit A-] r ttnched 11 Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: N/A This is a zero time change. supplement 111 Section V, PAYMENT, shall be amended as follows: The tntai M.9ximum Amnnnt Paphle under the pXeement i, increaCed h34.V. 1,146 to P1 599,609 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: Roger W Flint Consultant Signature DOT Form 140 -063 EF Revised 9/2005 By: Mike Jackson pprp Authority Signature Date bo I� -1SAS EXHIBIT A -1 Scope of Work for Sullivan Road West Bridge Replacement - Supplemental Agreement No. 9 City of Spokane Valley, Washington FHWA Project No. BRM 4103(007) May 2013 1.0 Introduction This Supplemental Agreement No. 9 scope of work modifies the scope of CH2M HILL's professional engineering services and compensation for final design of the Sullivan Road West Bridge Replacement to include final design of: • Latex Modified Concrete (LMC) overlay for the northbound Sullivan Bridge • Required wetland and habitat mitigation elements • Pedestrian lighting for the multi -use pathway on the new bridge and overlooks Task 9: Final Bridge and Structures Design 9.10 LMC Overlay on Northbound Bridge Prepare drawings for the LMC overlay on the northbound Sullivan Bridge. Define limits of overlay, provide general and construction notes, overlay details, and details for replacement of expansion joints at the bridge ends. Anticipated plan sheets are as follows. Bridge Drawings - Existing Sullivan Road East Bridge EB -12 LMC Overlay Plan EB -13 LMC Overlay Details (1 of 2) EB -14 LMC Overlay Details (2 of 2) Review current (as of execution of this supplement 9) WSDOT Standard Specifications for LMC overlay and expansion joint replacement. Prepare project- specific special provisions as required. Include LMC Overlay items(s) in the 90% and 100% construction cost estimates. Assumptions • The overlay will be replaced after construction of the new West Bridge and vehicle traffic will be routed to the new bridge during overlay construction. Deliverables: Drawings and Special Provisions at the 90% and 100% levels of completion. Task 10: Property Restoration 10.7 Wetland and Habitat Management Mitigation Design Provide engineering plans and technical specifications for construction of the Sullivan Road West Bridge Replacement Project's wetlands and habitat mitigation. The plans and specifications will be based on the schematic plans shown in the Sullivan Road West Bridge Replacement, Wetlands Delineation and Conceptual Mitigation Plan and the Sullivan Road West Bridge Replacement, Habitat Management Plan that includes types of plants (species), number and mitigation location. Review the wetlands and habitat mitigation plans prepared for the Sullivan Road West Bridge Replacement Project. Develop layout plans and planting details for construction of land restoration elements. Anticipated plan sheets are as follows. Property Restoration Sheets PR -14 Mitigation Planting Plan - North PR -15 Mitigation Planting Plan - South PR -16 Mitigation Planting Details Review current (as of execution of this supplement 9) WSDOT Standard Specifications for plant selection including plant establishment. Prepare project - specific special provisions as required. Include mitigation planting(s) in the 90% and 100% construction cost estimates. Assumptions • Mitigation will be integrated with river bank grading and stabilization design, as required. • CH2M Hill will use existing base mapping for the wetlands and habitat mitigation design • The Sullivan Road West Bridge Replacement, Wetlands Delineation and Conceptual Mitigation Plan and the Sullivan Road West Bridge Replacement, Habitat Management Plan are the basis for this scope and estimate. • There will be no temporary irrigation systems required for the shoreline wetlands mitigation planting. Temporary irrigation may be required for upland plantings. No permanent irrigation systems are planned for mitigation plantings. Deliverables: Drawings and Special Provisions at the 90% and 100% levels of completion. Task 14: Miscellaneous Optional Services 14.4 Roadway Illumination 14.4.1 Pedestrian Lighting Prepare Lighting Analysis for lighting locations to meet lighting standards for joint use areas. Recommend recessed fixture for use. Prepare drawings to provide recessed pedestrian lighting for the multi -use pathway to be mounted in the bridge barrier. Prepare illumination plans and details of recessed lighting and recessed patterns in median traffic barrier. Anticipated plan sheets are as follows. Roadway Illumination RL -5 Pedestrian Lighting Details Coordinate details of light fixtures and electrical conduits in barrier with traffic drawings, specs, and bid items. Review current (as of execution of this supplement 9) WSDOT Standard Specifications for illumination and electrical. Prepare project- specific special provisions as required. Include pedestrian lighting item(s) in the 90% and 100% construction cost estimates. Assumptions • The median traffic barrier will not have added pilasters or blisters for the light fixtures. The overall barrier width will remain unchanged. Deliverables: Drawings and Special Provisions at the 90% and 100% levels of completion. DOCUMENTS EXEMPT FROM PUBLIC DISCLOSURE The page entitled "Exhibit E -1" contains confidential cost and rate data and is withheld from public disclosure pursuant to 23 USC 112(2)(F). Prenotification; confidentiality of data. A recipient of funds requesting or using the cost and rate data shall notify any affected firm before such request or use. Such data shall be confidential and shall not be accessible or provided, in whole or in part, to another firm or to any government agency which is not part of the group of agencies sharing cost data under this paragraph, except by written permission of the audited firm. If prohibited by law, such cost and rate data shall not be disclosed under any circumstances. You may petition for a review of our findings pertaining to any redacted or withheld documents pursuant to Spokane Valley Municipal Code (SVMC) 2.75.080; and obtain judicial review pursuant to RCW 42.56.550. M Washington State -IO Department of Transportation �� Qesc t vlA co 0� Supplemental Agreement p p g Organization and Address CH2M HILL, INC. Number 9 717 W. Sprague Avenue, Suite 800 Spokane, WA 99201 -3911 Original Agreement Number Sullivan Road W Bridge Replacement #0155 Phone: (509) 747 -2000 Project Number Execution Date 1 Completion Date BRM 4103 007 17/8/2011 12/31/2013 Project Title New Maximum Amount Payable SULLIVAN ROAD WEST BRIDGE $ 1,588,608.00 Descri ' )11 lk •ofessional services to revise the Sullivan Park water supply main design to include fire protection service to the estern Dance Hall facility. The Local Agency of 60PR'A�-Lu F,wl e City of Spokane Valley, Washington i e -sC'e" a;7 M f desires to supplement the agreement entered into with CH2M HILL, INC. and executed on 11/8/2011 and identified as Agreement No. 0155 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: 4 e Fxhihit A-] attached 11 Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: - 111 Section V, PAYMENT, shall be amended as follows: The total Maximum Amnnnt Payable under the ag[earnent is increased by 00.1 -346 to . 1,588,609 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: Roger W_ Flint onsultant Signature POT Form 140 -063 EF Revised 912005 015.5 CITY OF SPOKANE VALLEY PUBLIC WORKS INFORMATIONAL COVER SHEET FOR DOCUMENTS REQUIRING CITY MANAGER SIGNATURE Date: 6 -11 -13 Budget Account No.: 303.303.155.595.10.41.02 AGREEMENT TOPIC & BACKGROUND: Supplement 9, CH2MHILL Contract Sullivan Road W Bridge Replacement Project, CIP 0155 BACKGROUND: The Sullivan Road West Bridge Replacement Project is currently in the final design and environmental permitting phase. The project is scheduled to go to bid in November 2013. Construction is anticipated to start in early 2014 and continue through to the end of 2015. Several items have come up that staff believes should be included in the project plans. These items are not currently included in the scope of work with CH2M HILL for the final design of the bridge. Therefore, a supplement to their contract is required for this additional work. The following design work is included in Supplement No. 9 so they can be included in the final project plans and bid documents: 1. Latex Modified Concrete (LMC) Overlay for the NB Sullivan Bridge over the Spokane River: The existing NB bridge deck was surfaced with an overlay around 1987. This overlay is now cracked, delaminating and coming apart. This overlay should be replaced prior to this NB bridge being used as the detour route during the demolition and construction of the SB bridge. Incorporating the LMC overlay on the NB bridge as a component of the SB Bridge Replacement Contract will reduce public inconvenience and reduce the overall cost. 2. During the environmental permitting process it was determined, that additional trees and shrubs (plantings) are necessary to mitigate impacts to the shorelines area from the Sullivan Rd Bridge Project. These required mitigation plantings were determined to be necessary after negotiations with environmental permitting agencies. The plantings now need to be incorporated into the project plans and contract documents. 3. Pedestrian lighting for the Pedestrian /Bicycle Walkway: Staff has determined that it would be much safer for the public to include pedestrian lighting in the concrete barrier that would illuminate the walkway making it safer for pedestrians and bicyclists. This task was not included in the final design contract. The additional work described above is not included of the current scope of work. in CH2M HILL's contract and, therefore, requires the attached Supplement 9. SELECTION PROCESS: ❑ Small Works Roster ® RFQ ❑Consultant Roster ❑Formal Bid ❑N /A ❑ Other. BUDGET /FINANCIAL IMPACTS: The estimated fee for CH2M HILL to provide the additional design is $21,346. Typically the Management Reserve Fund -(MRF) is used to cover contract supplements such as this but there is not enough MRF remaining to cover this additional work. In accordance with city code, the City Manager has authority to amend contracts up to $200,000 or 15% of the original council- approved contract amount, whichever is less. Council approved a total of $1,567,261 for the original contract and two design amendments. Since 15% of this total contract amount exceeds $200,000, the City Manager's contract amendment authority is limited to $200,000. i- 674 a ti,S M Staff recommends that this Supplement #9 be authorized under the City Manager's authority and that the remaining MRF be available to fund smaller contract amendments should they arise. Table 1, below, is a summary of CH2M HILL'S contract for this project. Table 2 is a summary of the total project funding to date. Totals $1,555,010 $12,251 c Table 2 ILI Project Funding To Date BR Grant $8,000,000 FMSIB Grant (CN) $2,000,000 TIB (CN) $3,500,000 City matching funds $2,320,00& Total \ $15,820,000 l3 15 Department birector Da e Date Approved: ?.v'/3 LEI �" Contract Language ❑ Performance & Payment Bond Approval DISTRIBUTION: Original to Vendor Original to City Clerk Copy to Submitting Department Copy to Finance Department Mana'aer 1,56"/,161 Date ❑ Letter at Credit ® Federal debarment/suspension requirements met ❑ N/A Date Approved: L Finke ❑ Selection Process Approval ,Funding Source Approval Date A Approved: Risk Manager ❑ Insurance Coverage Reviewed ATTACHMENTS: 2 copies, Supplemental Agreement No. 9, CH2M HILL Contract Sullivan Road West Bridge Replacement Project #0155 Table 1 \ ',NV CH2M H[LL •n Contract Authorized Amt. MRF .. l Con Amount scwc - Original Contract — Topographic Survey $64,930 $6,500 $71,430 e� 1� Supplement #1— Preliminary Design $452,710 $45,271 $497,981 Supplement #2 - Subconsultant Fee $0 $0 $0 Supplement #3 — Expanded Preliminary Design $35,440 ($35,440) $0 t t Supplement #4 — Final Design & Bidding Services $907,135 $90,715 $997,850 i Supplement #5 — Biological Assessment $15,805 ($15,805) $0 \ ` Supplement #6 — Early Site Prep Bid Package $51,676 ($51,676) $0 KL Supplement #7 — Wetland Report Coordination $13,028 ($13,028) $0 Supplement #8 — Fire Protection Water Main Design $14,286 ($14,286) $0 Totals $1,555,010 $12,251 c Table 2 ILI Project Funding To Date BR Grant $8,000,000 FMSIB Grant (CN) $2,000,000 TIB (CN) $3,500,000 City matching funds $2,320,00& Total \ $15,820,000 l3 15 Department birector Da e Date Approved: ?.v'/3 LEI �" Contract Language ❑ Performance & Payment Bond Approval DISTRIBUTION: Original to Vendor Original to City Clerk Copy to Submitting Department Copy to Finance Department Mana'aer 1,56"/,161 Date ❑ Letter at Credit ® Federal debarment/suspension requirements met ❑ N/A Date Approved: L Finke ❑ Selection Process Approval ,Funding Source Approval Date A Approved: Risk Manager ❑ Insurance Coverage Reviewed ATTACHMENTS: 2 copies, Supplemental Agreement No. 9, CH2M HILL Contract Sullivan Road West Bridge Replacement Project #0155