13-171.00 AM Landshaper: Sullivan Park ImprovementsSPA &I ke Ya11ey$ CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 13 -031 DEPARTMENT OF PUBLIC WORKS PROJECT: Sullivan Park Improvement Project CONTRACT DATE: 9/12/2010 CONTRACTOR: AM Landsha er CHANGE ORDER NO: 1 CAPITAL IMPROVEMENT PROJECT NO: 0155 BID NO.: 13 -031 DESCRIPTION OF CHANGES This Change Order pays for removal of an additional Ponderosa Pine tree. This revised change order corrects the erroneous Contract amount and supercedes and replaces Change Order 1 executed, 9- 24 -13. Item No description Unit Quanfily. Unit Price Total 103 Tree Removal - Ponderosa Pine EA 1 $245.00 $245.00 8.7% Tax $21.32 Total Amount of this Change Order( Incl. Tax): $266.32 SUBSTANTIAL COMPLETION Original Date: 11/7/2013 Prior to this Change Order: 1117/2013 Including this Change Order: 11/7/2013 Original Working Days: 35 Working Days Added by this CO: 0 Working Days including this CO: 35 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL CONTRACT BID ITEM TOTAL ...................................................................... .. .......................... $ ....... ............................... . 151,842.30 ORIGINAL TOTAL TAX AMOUNT (8.7%) $ 13,210.20 ORIGINAL TOTAL CONTRACT AMOUNT - ....................................... ............................... .............................$ 165,052.58 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT ......... .. ........ .. ................................................ .. $, .. ... ............... .. .............. 0.00 TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER . .............. ......... . ........ < ...................�„ ... 165,052.58 NET THIS CHANGE ORDER ..................................<.................. .........................,..... 266.32 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 165,318.90 CONTRACTOR ACCEPTANCE: (2tf— DATE: The contractor hereby accepts this adjustment un r t e terms of the odgi al contract for all work perfomed. RECOMMENDED BY: DATE: APPROVED BY: DATE: 10/1 lu Public Works APPROVED BY: A1114 DATE: City Manager ATTACHMENTS: Revised Plan Sheet 4, dated 9 -24 -13 Disfiibution. ORIGNALSTO: Contractor, City of po ane Valley Clerk's Office, PW Project File COPIES TO: PW Project File P:PuMa Works /PurchaingjCO (9126/2007) S CM OF 0111 Ua11ey. Public Works Department Capital Improvement Program 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhatt@spokanevalley.org Change Order Memorandum September 27, 2013 Steve Worley, Eric Guth Craig Aldworth Re: Change Order 1 for Sullivan Park Improvements Project Phase 1 — Sullivan Road West Bridge Replacement Project CIP 0155 Budget Account No. 303.303.155.594.76.63.00 AM Landshaper Contract 13 -031 This change order provides for the removal of a 14 inch diameter Ponderosa Pine tree that was not shown on the project survey. It is located several feet outside the proposed south edge of the Picnic Shelter Slab near the SW corner. If the roots remain in the area under the slab, future growth may buckle the slab. If the roots under the slab area are removed or damaged by construction, the tree may be damaged, making it susceptible to blowing down during a SW gale onto the new shelter. State Parks has provided verbal permission to remove the tree. The CO 1 executed on 9 -24 -13 erroneously contained the uncorrected original bid amount. The attached CO 1 contains the awarded contract amount that had corrected the bid errors. The total estimated cost (incl. tax) for this Change Order work is $266.32 paid for by Federal Grants and the City of Spokane Valley. There are sufficient funds in the project budget to cover these costs. Original Contract amount (incl. 8.7% tax) _ Previous Change Order Cost = Change Order #1 Cost = Project Cost including Change Order #1 = 15% of Original Contract amount = Max Public Works Director Contract authority = Change Order Cost to date = Remaining P.W. Director Contract Authority after CO #1 Cc: Finance Department Clerk's Office $165,052.58 $ 0.00 266.32 $165,318.90 $24,797.84 $24,797.84 $ 266.32 $24,531.52 1N CONTRACT NO.- 13.031 KTRACT DATE* 9/1212010 3E ORDER NO: 1 Unit Price atat $246.00 $245.00 8.7% Tax WA rder( Incl. Tax): $266.32 Iing hang,, Order: 11/712013 Days Inciuding CO: .. . ............................... sin 0o $ 266.32 DATE:�� DATE: DATE: Z 13 DATE: ATTACHMENTS: Revised Plan Sheet 4 dated 0-24-13 Dtsf+ibutton; O Can ac or, city of Spokane Valley clarKe OfWPW Projeot e COPIES TO: PW Pro ect Pite P:Pob9oWlorks/PgtChsTnarC0 (Wa12007) v BID TABULATION Sullivan Rd West Bridge Replacement Project-Phase 1 0155 - PH. 1 BID OPENING DATE - August 23,2013 10:00 A.M. Spokane ..��VW Addendums acknowledged ad deposit surety bond Non - Collusion Declaration Certification of Federal -Aid Mobilization %of total ' Contractor miscalculation **Contractor rounded total up or down "Unit price was back - calculated (Contractor didn't provide) X x x x X x x x X x x x X x x x 7.11% 5.03% 5.99% 9.86% Engineer's Estimate AM Landshaper ME Uphus Constr. Inc. MAKWIL Constr. Co. West Company, Inc. NUMBER ITEM Unit QUANTITY Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost SCHEDULE A- Sullivari Park Improvements' Protect � •.. - . 101 MOBILIZATION LS 1 LS $20,000.00 LS $10,800.00 LS $8,362.00 LS $12,000.00 LS $19,000.00 102 CLEARING AND GRUBBING - SITE AC 0.3 $6500.00 $1950.00 Yir 49S4,863.33 $1459.00 3000 $900.00 16000 $4800.00 7500 $2,250.00 103 TREE REMOVAL 4 IN. DIAM. OR GREATER LS 1 LS $4,950.00 LS $2 698.00 LS $3,780.00 LS $2,750.00 LS $5,000.00 104 IRRIGATION DEMOLITION LS 1 LS $1,200.00 LS $385.00 LS $315.00 LS $4,500.00 LS $500.00 105 ROADWAY EXCAVATION INCL. HAUL CY 110 $36.00 $3960.00 10 $1,100.00 30 $3,300.00 76 $B 360.tl0 145 $15,950.OD 106 GRAVEL BORROW INCL. HAUL CY 25 $25.00 $625.00 27 5675.00 26 $650.00 90 $2,250.00 100 $2,500.00 107 SERVICE CONNECTION 2 IN. DIAM EA 1 $8,700.00 $8,700.00 $1,800.00 $1,800.00 $840.00 $840.00 $2,300.00 $230000 $3,000.00 $3,000.00 108 CRUSHED SURFACING TOP COURSE 61N. DEPTH SY 270 $15.00 $4,050.00 $13.84 -J'C $3,735.80 $3.50 $945.00 $8.00 $2,160.00 $15.00 $4,050.00 109 IRRIGATION SYSTEM LS 1 LS $14000.00 LS $8856.00 LS $9844.00 LS $20200.00 LS $22500.00 110 _ EROSION CONTROL LS 1 LS $3,500.00 LS $2,538.00 LS $2,100.00 LS $5,500.00 LS $3,500.00 111 TREE PROTECTION FENCING LF 1,00 $3.50 $3 500.00 WWW $0.50 $600.00 $1.00 $1.000.001 $3.20 $3,200.00 $3.50 $3,500.00 112 TOPSOIL TYPEA -4IN. DEPTH SY 1160 $2.50 52900.00 S3.74 - $4338.40 $5.25 $6,090.00 $3.97 qF S4,605.20 $3.20 $3,712.00 113 SOD INSTALLATION SY 1,160 $4.50 $5220.00 $4.73 $5486.80 $7.06 58.189.60 $5.00 $5800.00 $3.20 $3,712.00 114 PERMANENT SIGNING LS 1 LS $1,200.00 LS $706.00 LS $350.00 LS $575.00 LS $150.00 115 REMOVE PAVEMENT MARKING LS 1 LS $1100.00 LS $513.00 LS $575.00 LS $650.00 LS $850.00 116 PAINTED ACCESS PARKING SYMBOL EA 2 $250100 $500.00 $298.5 0 $597.00 $74.00 $148.00 $225.00 $450.00 $75.00 $150.00 117 PAINT LINE LF 220 $4.00 $880.00 $1.35 $297.00 $1.12 Mfr V $246.40 $2.00 $440.00 $1.10 $242.00 118 CONSTRUCTION SURVEYING LS 1 LS $5,000.00 LS $1 797.00 LS $2,000.00 LS $3,000.00 LS $2,500,00 119 RECORD DRAWINGS MINIMUM BID $1,500) LS 1 LS $1,500.00 LS $2,022.00 LS $2100.00 LS $2000.00 LS $1,500.00 120 PROJECT TEMPORARY TRAFFIC CONTROL LS 1 LS $1500.00 LS $100.00 LS $1150.00 LS $4,000.00 LS $1000.00 121 WHEELSTOP EA 2 $250.00 $500.00 $83.45 $166.90 $95.00 $190.00 $350.00 $700.00 $175.00 $350.00 122 MODIFY EXISTING CHAIN LINK FENCE LS 1 LS $1000.00 LS $3594.00 LS $3220.00 LS $2,350.00 LS $500.00 123 TEMPORARY FENCE AND DRIVE THROUGH GATE LS 1 LS $2,500.00 LS $321.00 LS $1,100.00 LS $1 500.00 LS $500.00 124 REINF. CEMENT CONC. SIDEWALK SY 80 $55.00 $4,400.00 $83.68 Mr >w $6.694.40 $60.00 $4800.00 $100.01) $8000.00 $65.00 $5,200.00 125 PICNIC SHELTER 30'X44' LS 1 LS $72,000.00 LS $52,634.00 LS $74,603.00 LS $70,000.00 LS $62,500.00 126 EDGE - 36'X50'FOR SHELTER SY 200 $50.00 $10000.00 $110.78 $22,156.OD 551.01 $10213.00 $74.00 $14,800.00 $100.00 $20000.00 127 DRINKING FOUNTAIN LS 1 LS $800000 LS $491000 LS $4 100.00 LS $700000 LS $3,000.00 128 PICNIC L 1 LS 46, 0 S 1 ,963.00 15,250.00 S 6,500. ,0 0.00 TOTAL SCHEDULE A $230,635.00 $161,042.30 $166,261.00 $200,390.201 $192,616.00 18.7% Sales Tax $20,065.26 $13,210.28 $14,464.71 $17,433.95 $16,757.59 TOTAL (including Tax) $250,700.25 $165,052.58 $180,725.71 $217,8N l i1 $209,373.59 Addendums acknowledged ad deposit surety bond Non - Collusion Declaration Certification of Federal -Aid Mobilization %of total ' Contractor miscalculation **Contractor rounded total up or down "Unit price was back - calculated (Contractor didn't provide) X x x x X x x x X x x x X x x x 7.11% 5.03% 5.99% 9.86% 4. GENERAL NOTES: I.AREATO RECEIVE SM. WAIHWAY AND PICNIC SHELTER SNAIL DE GEARED OF VEGETATION, BOULDERS AND BTONEB. 2. CONTRACTOR SHALL MG ALL TREES TO Off REMOVED FOR ENGINEERS APPROVAL PRIOR TO BEGINNING TREE REMOVAL B.TREE PROTWMM CONSTRUCTIONFENCDA7 SHALL BE NSTALLEOBEFORE, DURING OR DIRECTLY AFTER7REES ARE REMOVED AS APPROPRIATE AND AGREED BY ENGN EERB. PRIOR TO GRUBBB W. 1. CARE SKALLTAKEN WIZEN CURING AND REMOVING E%ISTINOTREESTNAT NO DAMAOBTO 8099 MEES TOREMAN ORTREEROOTSVNULOUADERMINE TNENVBIBNfY. SHEET NOTES: tO EIGSTINDTREESTOREMAIN(m O REMOVEnWIMG OEXISTING SHELTER TO REMAIN OREMOVE CWN LINK WNEMESNFABRIC FROM CORNER BACKTONEXTPOST ASNECE84ARYFORWALKWAYCIFARANCG O6 KNUCKLESELVAGE TNSVRRE MESH ENDS. END POSTS SHALL BE SECURED WRIT TENSIONYAREANDMIRONCABLE. BO EIMBTNOSWNGGATEACCESS 7� BTMiNGAREA OTHE IRRWATION ANDWATERLNEB 6NOVM ONTMODRAWNOREPRESENTBAN APPROAUATEREPRESENTATION OPAPARKBANO REOREATIONAS•BUAT (UNKNO'ATI OATS) ARM NAS NOT BE EN VERIFIED. 70 EX IBTNOMANNOLBM 'DYA3LHOUSETfIREMAN H DOSTNOVALVEANDBOXTORFMAN 12 CAPE49TINGRUUGATIONLNE70REMAN 18 VALVEBOXREMOVEANGFRL 1A EMSTRIOWATERFOUNTANTOREMAN XO EMSTNGTREESTO BE REL1CVEp(IYP) 7REE REMOVALTABLE TREEM SPECIES OMMETER HEKBR 1 PONDEAOSAPNE B' - ! -AS s m