13-176.00 West Company: Sullivan Bridge Drain Retrofit S (Wane .0,00Valley. CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 13-002 DEPARTMENT OF PUBLIC WORKS PROJECT: Sullivan Bridge Drain Retrofit Project CONTRACT DATE: 9/5/2013 CONTRACTOR: West Company,Inc CHANGE ORDER NO: 1 CAPITAL IMPROVEMENT PROJECT NO: 0150 BID NO.: 13-002 This Change Order pays for furnishing and installing additional 7 Hanger Assemblies and 2 Intermediate Diaphragm Angle Bracket Assemblies, • including anchor bolts,where shown on the attached plans and specifications. • Item No Description Unit Quantity Unit Price Total 101 C01 LS 1 $18,058.90 $18,058.90 j Total Amount of this Change Order(Incl.Tax): $18,058.90 SUBSTANTIAL COMPLETION Original Date: 9/23/2013 Prior to this Change Orden 10/18/2013 Including this Change Orden 10/22/2013 Original Working Days: 20 Working Days Added by this CO: 2 Working Days Including this CO: 22 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT _» » ,..,.,»�».» 232,918.50 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT ...».»..».»»».,»..,......».»w...M...�....,......_...._...._._......_........__._.........._........,.$ 0.00 TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ 232,918.50 NET THIS CHANGE ORDER ._,..» ._..» ._�. ........_ ..� .. . »»». 18,058.90 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 250,977.40 CONTRACTOR ACCEPTANCE: 04p 1 DATE:_ 99/43/0 The contractor hereby accepts this adjustment under the terms of the contract for all work perfomed. Y P adjustment rl9 P RECOMMENDED BY: DATE: APPROVED BY: DATE: /0/7/ L3 No Works APPROVED BY: /v/ DATE: City Manager ATTACHMENTS: CO 1 Revised Plan Sheet 4 and C01 Specifications Distribution: ORIGINALS TO: Contractor,City of Spokane Valley Clerks Office,PW Project File COPIES TO: PW Project File P:PubEeworks/Purcha'a O(9/26/2007) Col3_1 -&) SCITY of Public Works Department poKane Capital Improvement Program Valley® 11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206 509.921.1000 • Fax: 509.921.1008 • cityhall @spokanevalley.org Memorandum Date: October 1,2013 To: Steve Worley, Eric Guth From: Craig Aldworth GA- Re: Change Order 1 for Sullivan Bridge Drain Retrofit Project CIP 0150 Budget Account No. 402.402.150.595.40.63.00 West Company Contract 13-002 This change order provides for the installation of additional hanger and bracket assemblies under the northbound Sullivan Bridge over the Spokane River so that power and communication conduits can be quickly installed under the Sullivan Rd West Bridge Replacement Project. See the attached utility MOU amendments. The total estimated cost(incl. tax) for this Change Order work is $18,058.90. The cost will be shared by the following Utilities: 1/2 Cost Avista Utilities 1/4 Cost CenturyLink 1/4 Cost ZAYO Group Original Contract amount= $232,918.50 Previous Change Order Cost= $ 0.00 Change Order#1 Cost= $18,058.90 Project Cost including Change Order#1 = $250,077.40 15%of Original Contract amount= $34,937.78 34 937,78 Max Public Works Director Contract authority= $737099-60. Change Order Cost to date= $18,958.90 lgib Remaining P.W. Director Contract Authority after CO #1 $5i41.1O® p 1$78$a *Although this C 0 increases the maximum Contract Amount, it does not increase City cost. Cc: City Manager Finance Department CHANGE ORDER 1 COST ESTIMATE This Change Order pays for installation of additional Utility Hanger and Intermediate Diaphragm Angle Bracket Assemblies. West Co Bid Total Unit ITEM NUMBER ITEM Unit Quantity Price Total Cost SCHEDULE A-North Bound Bridge Work 101 MOBILIZATION LS 1 LS $23,235.00 102 SCH A CONSTRUCTION SURVEYING LS 1 L5 $5,600.00 104 SCH A PROJECT TEMPORARY TRAFFIC CONTROL L5 1 L5 $15,100.00 127 NB BRIDGE DRAIN PIPING SYSTEM LS 1 LS $69,000.00 128 NB BRIDGE HANGER ASSEMBLY SYSTEM LS 1 LS $37,000.00 Bid work 33 Hangers 9 Brackets 342 LF Piping Unit Price Quantity Assume Bid Hange Assembly Unit Cost= $ 1,000.00 33 $ 33,000.00 Assume Bid Bracket Assembly Unit Cost= $ 444.67 9 $ 4,002.03 The original bid price for"NB Bridge Hanger Assembly System" is $ 37,000.00 Assume Mob cost pays for Falsework under the bridge $23,235.00 Assume 1/2 Construction Surveying cost pays for survey under the bridge $5,600.00 $ 0.50 $2.800.00 $26,035.00 Length of Original Stormwater piping under bridge in feet 342 Falsework&Survey Cost per linear foot $ 76.13 Additional Falsework linear footage 84 Additional Falsework&Survey Cost $ 6,394.56 Traffic Control Cost per day $15,100.00 LS 20 days $755.00 cost per day Item No Description Unit Quantity Unit Price Total 101 Additional Hanger Assemblies Each 7 $1,000.00 $7,000.00 102 Additional Angle Bracket Assemblies Each 2 $444.67 $889.34 103 Additional Hanger&Bracket Assembly Installation Falsework $6,394.56 $6,394.56 104 5 Days Additional Traffic Control DAY 5 $755.00 $3,775.00 . Change Order Cost Estimate(incl.Tax): $18,058.90 CO 1 Specifications Bridge Supported Utilities 6-02.4 Measurement (*****) Add the following: "Change Order 1", shall not be measured. 6-02.5 Payment "Change Order 1", per lump sum. The lump sum price price for "Change Order 1" shall be full pay for furnishing and installing the hanger assemblies with anchor bolts; and the Interior Diaphragm Angle Bracket assemblies with anchor bolts; including all labor, tools, equipment, hardware, and materials utilized to perform the work as shown in the Change Order 1 Plan Sheet 4 and as specified in these special provisions. City of Spokane Valley Sullivan Bridge Drain Retrofit SVPW Bid No: 13-002