13-186.00 Spokane Rock Products: Carnahan, Indiana & Sullivan Preservation Spokane
dlley` CHANGE ORDER TO CONSTRUCTION CONTRACT NO 13-035
DEPARTMENT OF PUBLIC WORKS
PROJECT; Carnahan,Indiana and Sullivan Street Preservation Project CONTRACT DATE: 9/11/2013
CONTRACTOR: Spokane Rock Products,Inc CHANGE ORDER NO 2
CAPITAL IMPROVEMENT PROJECT NO 0180
BID NO 13-035
DESCRIPTION OF CHANGES
This Change Order pays for the revised work at the NW corner of Vista Rd and Sprague Ave:
Reconfigured Pedestrian Ramp;added removal and replacement of traffic curb and gutteradded removal of sidewalk;eliminated PPB pole
and associated conduit and wiring;eliminated stamped cement concrete work;
Stem No J2escriotlon kima C Unit Price otal
106 Remove PCC Curb and Gutter LF 9 $7.35 $66.15
106 Remove PCC Sidewalk and Driveway Approach SY 8 $9.45 $75.60
125 Cem.Concr,Traffic Curb and Gutter Lf 9 $25.00 $225.00
128 Cem.Concr.Curb Ramp Type Parallel A EACH -1 $1,200.00 ($1,200.00)
130 Cem.Concr.Curb Ramp Type Custom PA EACH 1 $1,200.00 $1,200.00
133 Cem.Concr.Pedestrian Curb LF 20 $14.00 $280.00
304 Deduct PPB pole and assocaited conduit and wiring LS -1 $400.00 ($400.001
Total Amount of this Change Order(Incl.Tax): $246.75
SUBSTANTIAL COMPLETION
Original Date: 11/8/2013 Prior to this Change Order: 11/11/2013 Including this Change Order: 11/11/2013
Original Working Days: 35 Working Days Added by this CO: 0 Working Days Including this CO: 36
THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE:
ORIGINAL TOTAL CONTRACT AMOUNT S 999,134.45
TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT -_ _,-,. -„ „ ,,,,,».„_ _„- .__.._. $ 1,812.00
TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER .,,,.,w_....— w....,$ 1,000,946.45
NET THIS CHANGE ORDER _„___ $ 246.75
TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 1,001,193,20--
CONTRACTOR ACCEPTANCE: DATE:
_,P The contractor hereby accepts this adjustment under the terms of the original contract for all work perfumed.
RECOMMENDED BY: , . f^ %i��.' .... --
DATE: ./0'7,/_...
APPROVED BY: DATE:. /0/5//.7
no work*
APPROVED BY: Al/� DATE;
City Manager
tATTACHMENTS: CO 2,Revised Plan Sheet 12 1
O!sJilbuflon:
ORIGINALS TO: Contractor,City of Spokane Valley Cleric's Office,PW Project trite
COPIES TO PW Project File p.rwe rtOrRStawula:na+co tnrzsoCor)
CITY OF Public Works Department
pokane Capital Improvement Program
Valley®
11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206
509.921.1000 • Fax: 509.921.1008 • cityhall @spokanevalley.org
Change Order Memorandum
Date: October 15, 2013
To: Steve Worley, Eric Guth
From: Craig Aldworth e--/°,
Re: Change Order 2 for Carnahan, Indiana and Sprague Street Preservation Project
Phase 3—2013 Street Preservation Program, CIP 0180
Budget Account No. 311.000.180.595.30.63.00 Spokane Rock Products Contract 13-035
This Change Order pays for revising the pedestrian ramp on the NW corner of Vista and Sprague
intersection. The work eliminates the PPB pole, by reconfiguring the pedestrian ramp. The change
was suggested by the Spokane County signal shop which maintains the Spokane Valley signal
system.
The total estimated cost(incl. tax) for this Change Order work is $246.75 paid for by the City of
Spokane Valley. There are sufficient funds in the project budget to cover these costs.
Original Contract amount= $999,134.45
Previous Change Order Cost= $1,812.00
Change Order#2 Cost= $246.75
Project Cost including Change Order#2 = $1,001,193.20
15%of Original Contract amount= $150,141.97
Max Public Works Director Contract authority= $75,000.00
Change Order Cost to date= $ 2,058.75
Remaining P.W. Director Contract Authority after CO#2 $72,941.25
Cc: Finance Department
Clerk's Office
III
,
i tp-,,,`°:-.5.l'i.i ii; '',.,
1 p
m a^a E
g 1g 1
i g E!
19i8iy
y
r2
U d i
i y Z
s6 co
K
wa
E2
F-08
3 J y o°',g ys
w
1
>r
I 0 ;_
1 :5iiLF5ii ;i111:
ib=
FoF n " b'
U F F�k 7i 3 a W h �
2 -1 �� MiliEl 61"\
8'
p Y
R
2
a il_.) rg
"$ h h 1 1
z U g
a
3 i a 0 m a a
VI
vIsin -- ,�-� . � 1
, r _ b y
I"-_ k 6 S e re,,,,t p, p'
E. � .I � �
— �— — - ---g 0 — Q �\ . ' !
of
- a
�, x` W x 8
/I
,;; g o
I / T mb
.�p + 4:-. w II m3
"�`4�Y ,,( ( 24 ; �< m s i s'
N-
-'i "1 ixR w Vz V,,6' '
ii t.ao[n-.1 awi9C/6 miswvdsT AOLUwsnmbas-mvnlam�^rnsmv+s•�PL�Ia-^ assss ar.-w�a w�+sj.-a+a rwgwAtiymna
SCITYaF i= -= - Public Works Department
Capital improvement Program
Valley
11707 E Sprague Ave Suite 106• Spokane Valley WA 99206
509.921.1000• Fax: 509.921.1008•cityhail @spokanevalley.org
Change Order Memo
Date: October 1,2013
By: Craig Aldworth
Re: Change Order 2 for Carnahan, Indiana and Sprague Street Preservation Project, CIP 0180
1. Describe the Change This Change Order pays for revising the pedestrian ramp
on the NW corner of Vista and Sprague intersection. The work eliminates the
PPB pole, by reconfiguring the pedestrian ramp.
2. Evolution of the Change The change was suggested by Shawn Mackin of the
Spokane County Signal Shop who maintains the Spokane Valley Signal System.
3. Payment
The revised scope of work results in a$246.75 cost. The $400 credit for the
deletion of the PPB pole was calculated from the material cost of a pole on the
State Contract ($155) +Anchor bolt cost ($147) + concrete &Labor($98) = $400.
4. Time
No additional time was granted.
6. Prior Approval
Change Order approval was obtained from the Spokane Valley Public Works
Director.
6. Attachments
CO 2 and revised Plan Sheet 12