Resolution 18-003 TIP CITY OF SPOKANE VALLEY SPOKANE COUNTY,WASHINGTON RESOLUTION NO. 18-003 A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY, WASHINGTON, ADOPTING THE 2019-2024 TRANSPORTATION IMPROVEMENT PROGRAM FOR THE CITY OF SPOKANE VALLEY, AND OTHER MATTERS RELATING THERETO. WHEREAS, to provide for the proper and necessary development of the street system within the City of Spokane Valley, the City shall, as required by State law, develop and adopt annually a Six-Year Transportation Improvement Program (Six-Year TIP) with such program acting as a guide for the coordinated development of the City's transportation system; and WHEREAS, the Six-Year TIP of the City shall specifically set forth those projects and programs of both City and regional significance that benefit the transportation system and promote public safety and efficient vehicle movements; and WHEREAS,the Six-Year TIP shall be consistent with the City Comprehensive Plan and be adopted following one or more public hearings before the City Council; and WHEREAS, a draft copy of the Six-Year TIP was submitted to the Washington State Department of Commerce and has been reviewed and approved prior to the scheduled adoption of the 11P in accordance with RCW 36.70A.106; and WHEREAS, the City Council conducted a public hearing on June 5, 2018, for the purpose of inviting and receiving public comment on the proposed Six-Year TIP. NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane County, Washington,as follows: Section 1. The City Council hereby adopts the attached Six-Year TIP for the City of Spokane Valley for the purpose of guiding the design, development and construction of local and regional transportation improvements for the years 2019 through 2024. The City Clerk is directed to file the 2019- 2024 Six-Year(TIP)with the Washington State Secretary of Transportation before June 30,2018.The Six- Year TIP shall be reviewed at least annually for the purpose of determining the work to be accomplished under the program and the City transportation requirements. Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances, and are not intended by the City to be relied upon by property owners or developers in making development decisions. Section 2. Effective Date. This Resolution shall be in full force and effect upon adoption. Adopted this 5'h day of June,2018. , ATTE, City f ;��ka le Valley ` LC. / l ` /....: ,i Istine Bainbridge, City Clerk L.R. Higgiin AM.Ilior Appro ed o rm: Officef the Ci ttorney Resolution 18-003,Adopting Six-Year TIP SpokaneC`TY2019 - 2024 Six Year ...Valley Transportation Improvement Pro ram (TiP) 1 _ _,� _.. �.». -�.,. ,ger r-� w.:• -. _ :�.-. .... , n ,,�.,;Fk =, `i .r" ' y�. -•-� #�*•• '�,n�'"A'Y�"�t' "`sem --} :F'h1.'"'r" f sf. 74, .. <. •;,'b' #'" - '�-.c •-y,i,..r# • "^-10.+$• - +'ia.--"Ni r ^�•7 x 5� M r �r .+:. �a • f x?7i�`Cy;_f ,� •-'�}� 7•.7; ;:-. Y�'Ci". '`- y- r`s„mr ` r _ •�-,e,t '�v stiff _ ! :,,: ..- �•rte'` - fy:-' _ •. - 1'ic ; ,� _�# i '�- t — YJ . . f { { ..w .. �_ Alt.. -- ' , - TM . ` ... ry.z .`, ';TM aa;- � -. . - .+^ s - :,r-; _•� }s _4`r.._ .-- .__- tWi ..-;4.. : - ,. - '-' • -- S '- �F +. -N. _,tom _ • "'i��- ' _•?c - r --z-��: _ + -' - - ,a - .,, 1. . - ---tF' 'r• - y _ . vlire,:' 'Rfes.. -1.- _ a� - idiam v i V r f- il' ti ' v� a y_ '.,,, 1 �,, 1. :17 e'.--••••- +art :' _ a'�' _ _ �.-'+"> `- �d %"�` .r J. `"- � .f fes.- City of Spokane Valley Community & Public Works Department _ 2019-2024 Transportation Improvement Program (TIP) Spokane Glossary & Abbreviations Funding Sources: Project Phases: • City City Funds • PE Preliminary Engineering • CDBG Community Development Block Grant • RW Right-of-Way • CMAQ Congestion Management/Air Quality • CN Construction • COM Washington Department of Commerce • DEV Private Developer Funds • FHWA Federal Highway Administration • FMSIB Freight Mobility Strategic Investment Board • FTA Federal Transit Authority • HSIP Highway Safety Improvement Program • NHFP National Highway Freight Program • Other Misc. Unidentified Funding Sources • RCO Washington State Recreation Conservation Office • REET Real Estate Excise Tax • RR Railroad • SRTS Safe Routes to School • SW City Stormwater Funds • STA Spokane Transit Authority • STBG Surface Transportation Block Grant • STBG-SA Surface Transportation Block Grant—Set Aside • TIB Transportation Improvement Board • TIGER Transportation Investment Generating Economic Recovery • WAL Washington Legislature • WSDOT Washington Department of Transportation �1�,w 2019- 2024 Six-Year Transportation Improvement Program Walley Dollars in Thousands Funding Project 1 Description/Current Status f Length Total Sources 2019 2020 2021 2022 2023 2024 Total 1 Broadway @ Argonne/Mullan Concrete intersections 12 City 12 12 (CN Only) Description: Reconstruct intersections in concrete pavement. Status: Funding Status: PE 0 Construction primarily in 2018,final paperwork in 2019. RW 0 Length (miles) Intersection Secured CN 12 12 Total 12 12 2 Barker Road! BNSF Grade Separation Project 24,110 City 1 98 30 1,589 1,555 237 3,509 NHFP 448 852 1,880 1,840 280 5,300 Description: TIGER 152 47 4,056 3,969 604 8,828 Construct Grade Separation at Barker/BNSF RRlTrent(SR290). FINSIB 2,350 2,300 350 5,000 WAL 538 268 806 Other 281 86 141 138 21 667 Status: Funding Status: Secured PE 1,116 343 1,459 Design ongoing. Secured RW 400 940 1,340 Length(miles) Intersection Secured CN 10,015 9,802 1,492 21,309 Total 1,517 1,283 10,016 9,802 1,492 24,110 3 Pines (SR27)! BNSF Grade Separation Project 28,400 City 949 1,186 304 101 889 2,667 6,096 STBG 2,846 949 3,795 Other 4,627 13,882 18,509 Description: Construct Grade Separation at Pines/BNSF RR/Trent(SR290). Status: Funding Status: Partial pE 949 1,186 2,135 Design ongoing. Planned RW 3,150 1,050 4,200 Length (miles) Intersection Planned CN 5,516 16,549 22,065 Total 949 1,186 3,150 1,050 5,516 16,549 28,400 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not intended by the City to be relied upon by property owners or developers in making development decisions. 5/31/2018 Page 1 2019. 2024 Six-Year Transportation Improvement Program 41,51.'01/alley Dollars in Thousands Funding Project!Description/Current Status I Length Total Sources 2019 2020 2021 2022 2023 2024 Total 4 Street Preservation Projects-Annual 21,595 City 3,600 3,600 3,600 3,600 3,600 3,595 21,595 Description: Pavement preservation projects citywide.Ongoing,yearly amounts subject to change. Status: Funding Status: Planned pE 175 175 175 175 175 175 1,050 2019 projects to focus on neighborhood street preservation. RW 0 Length (miles) Varies Planned CN 3,425 3,425 3,425 3,425 3,425 3,421 20,544 Total 3,600 3,600 3,600 3,600 3,600 3,595 21,595 5 Sullivan 1 Wellesley Intersection Improvement 1,327 City 22 257 279 CMAQ 141 907 1,048 Description: Traffic signal or roundabout. Status: Funding Status: Secured pE 103 103 Design underway. Secured RW 60 60 120 Length(miles) Intersection Secured CN 1,103 1,103 Total 163 1,164 1,327 6 Evergreen Resurfacing-Mission Connector to Indiana 624 City 84 84 STSG 540 540 Description: Grind and inlay hot-mix asphalt. Status: Funding Status: Secured PE 33 33 Design underway. Secured RW 0 Length (miles) 0.7 Secured CN 591 591 Total 624 624 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not intended by the City to be relied upon by property owners or developers in making development decisions. 5/3112018 Page 2 S"'" 2019- 2024 r Q Six-Year Transportation Improvement Program eyDollars in Thousands �r Funding Project I Description I Current Status I Length Total Sources 2019 2020 2021 2022 2023 2024 Total 7 Wilbur Road Sidewalk-Broadway to Boone 338 City 51 51 CDBG 287 287 Description: Install sidewalk from Broadway to Boone. Status: Funding Status: Secured PE 41 41 Pending Fall 2018 CDBG contract agreement. Secured RW 0 Length (miles) 0,3 Secured CN 297 297 Total 338 338 8 Mission Ave. Sidewalk-Union to Bowdish 438 City 87 87 TIB 351 351 • Description: Add sidewalk to Mission Avenue,install ramps and curb. Status: Funding Status: Secured PE 12 12 Grant funds secured for design and construction. RW 0 Length (miles) 0.3 Secured CN 426 426 Total 438 438 9 Wellesley Sidewalk-McDonald to Evergreen 415 City 42 42 SRTS 373 373 Description: Install sidewalk,curb and gutter and ramps. Status: Funding Status: Secured PE 7 7 Planned construction in 2019. RW 0 Length (miles) 0.5 Secured CN 408 408 Total 415 415 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not intended by the City to be relied upon by properly owners or developers in making development decisions. 5/31/2018 Page 3 cii," dol 2019- 2024 Six-Year Transportation Improvement Program 40.0 Talley Dollars in Thousands Funding Project!Description/Current Status 1 Length Total Sources 2019 2020 2021 2022 2023 2024 Total 10 Knox Sidewalk-Hutchinson to Sargent 312 City 38 38 CDBG 274 274 Description: Install curb,gutter,and sidewalk. Status: Funding Status: PEI 16 16 Applied for CDBG grant funding. RW 0 Length (miles) 0.2 CN 295 296 Total 312 312 11 Barker Rd-Euclid Ave.to Garland Ave. 2,581 City 135 135 STBG 1,919 1,919 Description: FMSIB 509 509 Reconstruct Barker to 3-lane urban section with shared-use path in DEV 12 6 18 partnership with County Sewer Extension. Status: Funding Status: Partial PE 147 147 Design 2018,prepare for construction by 2020. Partial RW 140 140 Length(miles) 0.8 Partial CN 2,294 2,294 Total 147 2,434 2,581 12 Appleway Trail-Evergreen to Sullivan 2,337 City 12 304 316 CMAQ 75 1,747 1,822 Description: STBG-SA 199 199 Construct shared-use pathway along public utility corridor. Status: Funding Status: Secured PE 87 87 Under design currently for 2020 construction. RW 0 Length(miles) 1 Secured CN 2,250 2,250 Total 87 2,250 2,337 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not intended by the City to be relied upon by property owners or developers in making development decisions. 5/31/2018 Page 4 rrr„„_ 2019- 2024 '� Six-Year Transportation Improvement Program .10.001rValley Dollars in Thousands Funding Project I Description 1 Current Status/Length Total Sources 2019 2020 2021 2022 2023 2024 Total 13 Wilbur Road Sidewalk-Boone to Mission 643 City 45 42 87 STBG-SA 556 556 Description: Install sidewalk from Boone to Mission. Status: Funding Status: Planned PE 45 19 64 Seeking grant funding through SRTS and STBG Set-Aside. Planned RW 21 21 Length(miles) 0.3 Planned CN 558 558 Total 45 598 643 14 Mullan Road Preservation-Broadway to Mission 1,400 City 42 147 189 STBG 267 944 1,211 Description: Grind and inlay hot-mix asphalt,provide conduit for future ITS infill, upgrade traffic signals at Mission. Status: Funding Status: Planned PE 149 149 Applying for STBG Preservation funds. Planned RW 160 160 Length(miles) 0.3 Planned CN 1,091 1,091 Total 309 1,091 1,400 15 Sprague/Barker Intersection Improvement 1,517 City 16 16 183 215 STBG 104 104 966 1,174 Description: DEV 64 64 128 Intersection improvement. Status: Funding Status: Partial PE 79 79 157 Applied for 2020-2023 STBG funds to supplement developer and City Planned RW 106 106 212 funds. Length (miles) Intersection Secured CN 1,149 1,149 Total 184 184 1,149 1,517 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not intended by the City to be relied upon by property owners or developers En making development decisions. 5)31/2018 Page 5 SII}rY 2019- 2024 E' Six-Year Transportation Improvement Program , alley Dollars in Thousands Funding Project/Description 1 Current Status/Length Total Sources 2019 2020 2021 2022 2023 2024 Total 16 Park Road-Broadway to Indiana 4,500 City 42 800 842 STBG 268 3,390 3,658 Description: Reconstruct to a 3-lane section with curb,sidewalks,bike lanes and stormwater facilities.PE phase completed to 90%in 2009 with STP,now STBG,funds. Status: Funding Status: PE 0 RWlanned in 2020. MA/planned Planned RW 310 310 Length(miles) 0.8 Partial CN 4,190 4,190 Total 310 4,190 4,500 17 Argonne Road Concrete Pavement- Indiana to 5,800 City 98 292 390 Montgomery STBG 633 1,877 2,510 Description: FMSIB 1,160 1,160 Reconstruct pavement in concrete and improve signal timing at Other 1,740 1,740 Montgomery. Status: Funding Status: Planned PE 691 691 Applied for grant funding for 2021-22 FM518 and 5T83 funds. Planned RW 40 40 Length(miles) 0.3 Planned CN 5,069 5,069 Total 731 5,069 5,800 18 8th Ave 1 Carnahan Intersection Improvement 1,250 City 175 775 950 TIB 300 300 Description: Intersection improvement. Status: Funding Status: Planned PE 175 175 Realign intersection. RW 0 Length(miles) Intersection Planned CN 1,075 1,075 Total 175 1,075 1,250 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not intended by the City to be relied upon by property owners or developers in making development decisions. 5/3112018 Page 6 2019- 2024 P[11},k ► IIS Six-Year Transportation Improvement Program ValleyDollars in Thousands Funding Project!Description/Current Status 1 Length Total Sources 2019 2020 2021 2022 2023 2024 Total 19 Pines 1 Mission Intersection Improvement 1,400 City 30 157 187 CMAQ 190 1,023 1,213 Description: Intersection improvements for signalization and turning movements. Status: Funding Status: Planned PE 204 204 Applied for 2021-23 CMAQ program. Planned RW 16 16 32 Length (miles) Intersection Planned CN 1,164 1,164 Total 220 1,180 1,400 20 8th Ave.1 Barker Rd. Intersection Improvement 632 City 72 80 480 632 Description: Intersection improvement. Status: Funding Status: Planned PE 72 72 Conceptual phase,traffic study underway. Planned RW 80 80 Length(miles) Intersection Planned CN 480 480 Total 72 80 480 632 21 Barker Rd Improvements-South City Limits to 2,854 City 46 340 386 Appleway TIB 293 2,175 2,468 Description: Widen and improve roadway to 3-lane urban section in partnership with County Sewer Extension. Status: Funding Status: Planned PE 326 326 Design and construction anticipated to follow interim 1-90 interchange Planned RW 13 13 25 improvements. Length (miles) 0.8 Planned CN 2,502 2,502 Total ) 339 2,515 2,854 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not intended by the City to be relied upon by property owners or developers in making development decisions. 5/31/2018 Page 7 ,, y. 1011.1111.1.11:1111111111.1%. 2019- 2024 { Six-Year Transportation Improvement Program Valley Dollars in Thousands Funding Project/Description 1 Current Status/Length Total Sources 2019 2020 2021 2022 2023 2024 Total 22 Barker Rd Improvement Project-Appleway to 1-90 3,629 City 52 115 324 491 Other 330 735 2,073 3,138 Description: Widen and improve to 5-lane urban section.Realign east leg of Broadway. Status: Funding Status: Planned PE 382 382 Design and construction anticipated to follow 1-90 interchange Planned RW 853 850 improvements. Length (miles) 0.3 Planned CN 2,397 2,397 Total 382 850 2,397 3,629 23 Barker Rd Improvement Project-Spokane River to 4,089 City 77 372 449 Euclid STBG 492 2,385 2,877 Description: FMSIB 763 763 Reconstruct and widen to 3-lane urban section with shared-use path. Status: Funding Status: Planned PE 449 449 Seeking grant funding for design and construction. Planned RW 120 120 Length (miles) 0.5 Planned CN 3,520 3,520 Total 569 3,520 4,089 24 Barker Rd Improvement Project-Garland to Trent 2,183 City 49 191 240 STBG 315 1,221 1,536 Description: FMSIB 407 407 Reconstruct Barker to 3-Lane urban section with shared-use path from Garland to south limits of Grade Separation Project at Trent. Status: Funding Status: Planned PE 224 224 Seeking grant funding for design and construction. Planned RW 140 140 Length(miles) 0.1 Planned CN 1,819 1,819 Total 364 1,819 2,183 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not intended by the City to be relied upon by property owners or developers in making development decisions. 5/31/2018 Page 8 S''' e• 2019. 2024 ilSix-Year Transportation Improvement Program Valley.1000 Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2019 2020 2021 2022 2023 2024 Total 25 Pines SR-27116th Ave. Intersection Improvement 3,390 City 195 295 2,900 3,390 Description: Add intersection traffic control. Status: Funding Status: Secured PE 195 195 390 Applying for funding to improve five-leg intersection. Planned RW 100 100 Length(miles) Intersection Planned CN 2,900 2,900 Total 195 295 2,900 3,390 26 Mirabeau l Mansfield Intersection Improvement 905 City 120 110 230 CMAQ 25 650 675 Description: Intersection capacity improvements. Status: Funding Status: Partial PE 120 120 Initial planning in Mirabeau Subarea Traffic Study. Planned RW 25 75 100 Length(miles) Intersection Planned CN 685 685 Total 145 760 905 27 Argonne Rd & 1-90 IC Bridge Widening 4,025 City 57 90 147 FMSIB 396 396 Description: STSG 368 3,114 3,482 Widen Argonne Rd Bridge to 3 Lanes southbound.Improve sidewalks. Status: Funding Status: Planned PE 425 425 Project anticipates need for bridge reconstruction over 1-90. RW 0 Length(miles) 0.1 Planned CN 3,600 3,600 Total I 425 3,600 4,025 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not intended by the City to be relied upon by property owners or developers in making development decisions. 5/31/2018 Page 9 2019. 2024 Spokal� Six-Year Transportation Improvement Program lleyDollars in Thousands Funding Project/Description I Current Status I Length Total Sources 2019 2020 2021 2022 2023 2024 Total Totals: 8,917 7,990 103,794 120,701 8,602 12,765 19,837 24,854 20,657 33,991 120,706 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,and are not intended by the City to be relied upon by property owners or developers in making development decisions. 5131/2018 Page 10