Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
12-002.00 Budinger & Associates: Sprague Ave Reconstruction
12-003.00 Budinger & Associates: Indiana Ave Extension
12-004.00 See Interlocal Agreements file - Traffic School
12-005.00 Century West: Transportation Planning Svcs
12-007.00 NA Degerstrom: Sullivan Bridge Temp Repair
12-008.00 Spokane Rock Products: Indiana Ave Extension
12-009.00 David Evans & Assoc: Traffic Control Studies
12-010.00 Transpo Group: Pines Rd ITS
12-011.00 Cope Acquisition: Argonne Corridor ROW
12-013.00 Bernardo Wills Architects: 2012 Architectural Svcs
12-014.00 CH2M Hill: Sullivan West Bridge Replacement
12-016.00 Poe Asphalt Paving: Street & Stormwater Maint & Repair
12-018.00 Landtek: Evergreen Rd Reconstruction
12-019.00 Electric City: Precinct Exterior Lighting
12-020.00 Vera Water and Power: Sprague Reconstruction Conduit
12-021.00 Strata: Evergreen Rd 19th to 32nd Reconstruction
12-022.00 Van Ness Feldman: Shoreline Master Program
12-024.00 Skillings Connolly: On Call ROW Acquisition & Appraisal - Evergreen Project
12-027.00 Spokane County Sheriff JAG Grant: Equipment Purchase
12-028.00 NA Degerstrom: Sullivan Bridge Temp Repair
12-029.00 See Interlocal Agreements File Valley Fire Services & Code Enforcement
12-030.00 Senske Lawn & Tree Care
12-033.00 Simpson Engineers: 2012 Stormwater Small Works Projects
12-034.00 Thomas, Dean & Hoskins: Park & Montgomery Survey
12-036.00 Budinger & Assoc: Drainage Facility Subsurface Exploration Analysis
12-038.00 Taylor Engineering: On Call Engineering, Drafting, Design & Construction
12-041.00 GeoEngineers: Sprague Ave Reconstruction
12-042.00 Michael Terrell: Pring Property Master Plan
12-043.00 Benthin & Associates: On Call Surveying Svcs
12-044.00 Vera Water & Power: Evergreen Rd Construction Water Main Transmission
12-046.00 See Interlocal Agreements - Guaranteed Ride Home
12-048.00 TC Sherry & Associates: Terrace View Playground Replacement
12-049.00 TC Sherry & Associates: CenterPlace South End Landscape
12-050.00 AM Landshaper: Discovery Park Playground Reinstallation
12-051.00 Washington Appraisal Svcs: Sprague Park Property Appraisal
12-053.00 Simpson Engineers: 2012 Stormwater Small Works Projects
12-054.00 Pring Corporation: Purchase of Real Estate
12-057.00 Sunburst Engineering: Balfour Park Expansion & Library Traffic Study
12-058.00 WSDOE: Stormwater Capacity Grant
12-060.00 Poe Asphalt Paving: Sprague Ave Reconstruction
12-060.04 Poe Asphalt Paving: Sprague Ave Reconstruction
12-060.05 Poe Asphalt Paving: Sprague Ave Reconstruction
12-061.00 Paladin Date Systems
12-062.00 Spokane Rock Products: Indiana Ave Extension
12-063.00 Union Pacific Railroad: Pines at MP8 Road Crossing Improvement
12-064.00 Michael Terrell: West Gateway Signage
12-065.00 GeoEngineers: Sprague & Herald Environmental Site Assessment Ph 1
12-066.00 AAA Sweeping, LLC
12-066.03 AAA Sweeping
12-066.04 AAA Sweeping
12-066.06 AAA Sweeping: Storm Drain Cleaning Svcs
12-067.00 Wal-Mart: Traffic Signal Construction & Design
12-068.00 Budinger & Associates: On Call Materials Testing
12-069.00 HDR Engineering: Sprague Swale Upgrades
12-070.00 URS Corporation: Shoreline Master Program
12-071.00 Poe Asphalt Paving: Sprague Ave Reconstruction
12-072.00 SPVV Landscape Architects: Appleway Enhancement I-90 to University
12-073.00 Splash-Down Concessions
12-074.00 Shamrock Paving: Evergreen Reconstruction
12-075.00 Splash-Down Concessions
12-076.00 SvR Design: Appleway Trail University to Evergreen
12-077.00 David N Randall: Bettman/Dickey - 14th to 11th Storm Conveyance
12-079.00 Spokane Rock Products: Indiana Ave Extension
12-080.00 Strata: Evergreen Rd 19th to 32nd Reconstruction
12-081.00 CH2M Hill: Sullivan West Bridge Replacement
12-082.00 Pring Corporation: Purchase of Real Estate
12-083.00 Studio Cascade: Parks, Recreation & Open Space Master Plan Update
12-084.00 WSDOE: Comprehensive Shoreline Master Program Update
12-085.00 Sunburst Engineering: Balfour Park Extension & Library Traffic Study
12-086.00 Spokane Rock Products: 2012 Street Preservation Ph 1
12-087.00 Northwest Fence: Police Precinct Fence Repair
12-089.00 Shamrock Paving: Evergreen Reconstruction
12-090.00 DKS Associates: Argonne Corridor Upgrades
12-091.00 Day Wireless Systems
12-092.00 See Interlocal Agreements Folder - Milwaukee Rail Trail
12-092.01 See Interlocal Agreements: Spokane County Appleway Trail Parklets
12-093.00 Allwest Testing: 2012 Street Preservation
12-094.00 Transpo Group: Citywide ITS Strategic Plan
12-095.00 Spokane County 48th & Sundown Pavement Replacement
12-097.00 Spokane Rock Products: University Overlay
12-098.00 Spokane Rock Products: 2012 Street Preservation
12-099.00 Spokane Rock Products: 2012 Street Preservation
12-100.00 Spokane Rock Products: 2012 Street Preservation
12-101.00 CH2M Hill: Sullivan West Bridge Replacement
12-105.00 Spokane Rock Products: University Overlay
12-108.00 Dew Drop Sprinklers: CenterPlace South Landscape Development
12-109.00 Spokane Rock Products: 2012 Street Preservation
12-110.00 Shamrock Paving: Evergreen Reconstruction
12-111.00 See Interlocal Agreements file - KCDA Purchasing Cooperative
12-112.00 HDR Engineering: Sprague Swale Upgrades
12-113.00 Spokane Rock Products: 2012 Street Preservation Ph 2
12-114.00 Dew Drop Sprinklers: Terrace View Park Playground Improvements
12-115.00 Spokane Rock Products: 2012 Street Preservation
12-116.00 Spokane Rock Products: 2012 Street Preservation
12-117.00 Poe Asphalt Paving: Sprague Ave Reconstruction
12-120.00 WSDOT Sprague Sullivan ITS
12-121.00 Spokane County CDBG: Sprague ADA Sidewalk Improvements
12-122.00 Shamrock Paving: Evergreen Reconstruction
12-123.00 Allwest Testing: Sprague Ave UIC Elimination
12-124.00 USKH: Mansfield Connection Mapping & Surveying
12-125.00 Inland Asphalt: Sprague UIC Elimination Swale Upgrade
12-126.00 Shamrock Paving: Evergreen Reconstruction
12-127.00 Poe Asphalt Paving: Sprague Ave Reconstruction
12-128.00 See Interlocal Agreements file - County Purchasing Cooperative
12-129.00 See Interlocal Agreements file Emergency Mgmt
12-129.01 See Interlocal Agreements file Emergency Mgmt
12-130.00 Paladin Data Systems
12-131.00 WEST Constultants
12-131.02 WEST Consultants: Saltese Wetlands Floodplain Review
12-131.03 West Consultants: Saltese Floodplain Review
12-131.04 WEST Consultants: Saltese Floodplain Review
12-132.00 WSDOT Pines Rd ITS Improvements
12-133.00 WSDOT Sullivan Road Bridge Replacement
12-134.00 WM Winkler: Sidewalk Infill Phase 1
12-135.00 ALLWEST Testing: Evergreen Rd Reconstruction
12-137.00 WSDOT Sidewalk Infill Phase 1
12-138.00 Taylor Engineering: Sprague Ave Evergreen to Sullivan
12-139.00 Zeutschel Excavating: West Entry Sign & Landscape Improvements
12-140.00 See Interlocal Agreement file - Library District
12-140.01 See Interlocal Agreements: Spokane County Library District
12-140.02 See Interlocal Agreements: SCLD Acquisition of Real Property
12-140.02 See Interlocal Agreements: SCLD Real Estate Acquisition
12-141.00 Dew Drop Sprinklers: CenterPlace South Landscape Development
12-142.00 Spokane Rock Products: 2012 Street Preservation Ph 2
12-143.00 Landtek: Evergreen Reconstruction
12-144.00 Road Products: 2012 Pavement Marking Removal
12-145.00 Spokane Rock Products: 2012 Street Preservation Ph 2
12-146.00 Bacon Concrete: 2012 Concrete Maintenance
12-147.00 WM Winkler: Sidewalk & Transit Stop Accessibility Ph 1
12-148.00 WSDOT Sidewalk Infill Phase 1
12-149.00 WSDOT: ADA Sidewalks Adams Trent to Wellesley
12-150.00 WSDOT Pines Rd & Grace Ave Safety Project
12-150.01 WSDOT: Pines & Grace Intersection Safety Project
12-150.02 WSDOT: Pines & Grace Intersection Safety Project
12-150.03 WSDOT: Pines & Grace Intersection safety Project
12-151.00 Montgomery Realty: No-Build Easement re BSP-05-08
12-152.00 WM Winkler: Sidewalk Infill Ph 1
12-153.00 WM Winkler: Sidewalk Infill Ph 1
12-154.00 Poe Asphalt Paving: 44th & Sundown Pavement Repair
12-155.00 Aztech Electric: Sprague Sullivan ITS
12-156.00 SPVV Landscape Architects: Sprague Storm Drain Enhancement
12-157.00 Michael Terrell: West Gateway Signage
12-158.00 CH2M Hill: Sullivan West Bridge Replacement
12-159.00 ALLWEST Testing: 24th Ave Sidewalks Adams to Sullivan
12-160.00 Cameron Reilly: 24th Ave Sidewalks
12-163.00 AAA Sweeping
12-167.00 Simpson Engineers: Wellesley & Adams Sidewalks
12-169.00 ALLWEST Testing: 2012 Street Preservation
12-170.00 Poe Asphalt Paving: 48th & Sundown Pavement Repair
12-171.00 Skillings Connolly: On Call ROW Acquistion & Appraisal
12-172.00 GeoEngineers: 2013 Street Preservation
12-173.00 Aztech Electric: Pines Rd ITS
12-175.00 Simpson Engineers: RR Right of Way Survey Control
12-176.00 AAA Sweeping
12-177.00 Eastern Washington University: Mansfield Connection Cultural Resources Survey
12-178.00 Fehr and Peers: University Rd Overpass Study
12-184.00 Simpson Engineers: Sidewalk Infill Project
12-186.00 Geo Engineers: Sprague Ave Reconstruction
12-187.00 WM Winkler: Sidewalk Infill Ph 1
12-188.00 Prosser & Sons: Terrace View Park Swing Installation
12-189.00 David N Randall: Bettman/Dickey - 14th to 11th Storm Conveyance
12-190.00 See Interlocal Agreements file - Geiger Work Crew
12-191.00 WSDOT Citywide Safety Improvements
12-191.01 Washington State Dept of Transportation: Citywide Safety Improvements
12-192.00 WSDOT: Argonne Mullan Corridor Safety
12-193.00 WSDOT: Argonne Rd Safety Project
12-194.00 City of Millwood: Argonne Rd Safety Project
12-195.00 Shamrock Paving: Evergreen Reconstruction
12-196.00 Shamrock Paving: Evergreen Reconstruction
12-197.00 Transpo Group: Pines Rd ITS
12-198.00 MMEC: City Hall Options Review & Analysis
12-200.00 Spokane Rock Products: 2012 Street Preservation
12-201.00 Spokane County Sheriff Detention Services Work Crew
12-204.00 AAA Sweeping
12-206.00 Ace Landscaping Corporation
12-207.00 Inland Asphalt: Sprague UIC Elimination
12-208.00 TW Telecom
12-209.00 WSDOE: Sprague Ave UIC Elimination
12-210.00 Bacon Concrete: 2012 Concrete Maintenance
12-226.00 Coeur d'Alene Tribe: See Franchise Agreements File